Forwards IE Insp Repts 50-361/81-23 & 50-362/81-06 on 810908-10.No Noncompliance Noted
ML20010J368
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 09/16/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20010J369 List:
References
NUDOCS 8109300375
Download: ML20010J368 (2)


See also: IR 05000361/1981023

Text

{{#Wiki_filter:l l . , ,, -

  • -

- p- < ~ SEP 161981 Docket No. 50-361, 50-362 Southern California Edison Company h ;": . . * i. P. O. Box 800 s r /d 8 \\ D' g -{2 2244 Walnut Grovc Avenue " Rosemead, California 91770 , 8- $" ~% N./A Attention: Dr. L. T. Papay, Vice President ' Advanced Engineering -. 3 ! Gentlemen: g ,

Subject: NRC Inspection This refers to the inspection conducted by Mr. W. G. Albert of this office on September 8-10, 1981 of, activities authorized by NRC Construction Pemit Nos. CPPR-97 and 98, and to the discussion of our findings held by Mr. Albert with Mr. J. M. Curran and other members of your staff at the conclusion of the inspection. Areas examined during this inspection are described 'n the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures ar.d reoresentative records, interviews with personnel, and observations by th' ctor. No items of noncompi.anc.e with NRC requirements were identified within the scope of this inspection. ' In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within ten (10) days fro.T the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information. If your receipt of this letter has been delayed such that less than seven (7) . days are available for your review, please notify this office promptly so that a new due date may be established. Consistent with section 2.790 (b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the basis on which it is claimed that the information should be withheld from public disclosure. gMNo {( ,

1... ..stW m%m k

. ..... ... . ... L- - . ............. ................. ... ........... .... . . ...... ............. ............. ...... .. ........... ... . j . . . . .. . ../ k. ,. ./81 9/jp/81 S/g.L ./81 9 om y. . .... ... ...... . ...... .. .... . . .. ........ ... ....... .................. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC FORM 318110 808 NRCM O240 @@@@@QMM$@@@@ @@%

.. . - . _ _ . - .. ~ . - , Southern California Edison Company -2- SEE 161991 This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within tne specified periods noted above, the report will be placed in the Public Document Room. Should you have any questions concerning this inspection, we will be glad to discuss them with you. Sincerely, , QL 0.((& (U f ' f ffv B. H. Faul$hnberry, Chief

. Reactor Construction Projects Branch l Enclosure: IE Inspection Report flo. 50-361/81-23 50-362/81-06 cc w/o enclosure: R. Dictch, Vice President fluclear Engineering & Operations bec: DMB/ Document Control Desk (RIDS)

Distributed by RV: RV PDR State of CA (Hahn & Johnson) RHE(w/oenc) Resident Inspectors (3) . I - }}