AUG 131981
South brolina Electric and Gas Company
ATTN:
Mr. T. C. Nichols, Jr. , Vice President
Power Production and System Operations
P. O. Box 764
Columbia, SC 29218
Gentlemen:
Subject: Report No. 50-39U81-17
This refers to the routine inspection conducted by Mr. J. L. Coley of this office
on July 13-17, 1981, of activities authorized by NRC Construction Permit No.
CPPR-94 for the V. C. Summer facility. Our pn11.minary findings were discussed
with Mr. O. S. Bradham, Manager, Nuclear Operations, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the ir.soection consisted of
selective examinations of procedures and representative records, interviews with
personnel, :nd observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response'are delineated in Appendix A.
One new unresolved item is identified in the enclosed inspection report. This
item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office
by telephone within ten days from the date of this letter of your intention to
f:le a request for withholding; and (b) submit within twenty-five days from tte
date of this letter a written application to this office to withhold such infer-
mation.
If your receipt of thi , letter has been delayed such that less the i
seven days are available for your review, please notify this office promptly so
that a new due date may be established. Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or 9 art thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit. If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
8109290678 810924 '
~
PDR ADOCK 05000395
G
pm
-
- _ _
-
-
-
,,
..
..
.
.
South Carolina Electric and
MG I 31981
'
Gas Company
2
i
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
fws
P. J. Keilogg, Chief
Reactor Projects Brane. E
Division of Resident and
Reactor Proiect Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-395/81-17
cc w/ encl:
J. B. Knotts, Jr.
A. A. Smith, Site QA Coordinator
0. S. Bradham, Manager
Nuclear Operations
bec w/ encl:
NRC Resident Inspector
Martin R. Hum, NRR
Document Management Branch
State of South Carolina
RII
RII
AgerdtRII v
RIIM
AFGib*i#
RII
RII
R
vo
o
v
JLCbley:ht
EHGi-
d
Murphy
son
rownlee
JKe ogg
9/fe/81
T// ,/81
J/tt /81
////81
$tk/81
g%81
)/
1
.
-
- _ --
. _ - -
A