ML20010J117
| ML20010J117 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 09/11/1981 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Crouse R TOLEDO EDISON CO. |
| Shared Package | |
| ML20010J118 | List: |
| References | |
| NUDOCS 8109290607 | |
| Download: ML20010J117 (2) | |
See also: IR 05000346/1981013
Text
.
. _ .
. _ _ _ _ _ -
_
_
_
- __
_ - - - . . _
..
.
-
.
.
.
.
cro i 1 19811
,
'
/
Docket.No. 50-346
e
n
[( ,'Tk
Toledo Edison Company
-
. _ -
d
-ATTN:
Mr. Richard P. Crouse
O'r
- - -
Vice President
9
~
Nuclear
,k
'
d
h
f
[%
\\ Q'
Edison Plaza
<
300 Madisca Avenue
3
Toledo, OH 43652
( j g \\ "'
Gentlemen:
1
.
This refers to the routine safety inspection conducted by Messrs. L. A. Reyes',
l
W. G. Rogers, J. D. Smith, and T. N. Tambling of this office on' July.1-31,
1981, of activities at Davis-Besse Nuclear Power Station, Unit 1, authorized
by NRC Operating License No. NPF-3 and to the discussion of our findings with
Mr. T. Murray at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews vii.h personnel.
During this inspection, certain of your activities -appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix A.
l
The inspection showed that action had'been taken to correct the identified-
noncompliance and to prevent recurrence. Consequently, no_ reply to this
'
noncompliance is required and we have no further questions regarding this
matter at this ' time.
,
1
In accordance with 10 CFR 2.790 of the Commission's regulations, a ccpy of
this letter and the enc 1csed inspection. report will be placed in the NRC's ~
'
Public Document Room.
If this report contains any information that you or
!
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is'necessary that you (a) notify this office by telephone within seven (7)
.
days from the date of this letter of ycur intention to file a request for
'
withholding; and (b) submit within twenty-five (25) days from the date of.
this letter a written application to this office to withhold such infor-
mation. Section 2.790(b)(1)' requires that any such application must be
'
l
,
.
-[ji:P
,
>b
/
!
f
8109290607 810911
PDR ADOCK 05000346t;
,
G
PDR7-
. ..
._ _ _ - - - _ _ . - _ _ . _ - - _ _ . - . . - . , _ . . . -- _ . _ -_., , _ _ ~ _ ~ _ - - _ . _
._
_
_
. __.
..
.
<
-
.
1
.
.
1
.
Toledo Edison Company
-2-
4
accompanied by_ an affidavit executed by the owner of the information which
identifies the document or part sought to be-withheld, and which contains
'
a full statement of the reasons which are the bases for the claim that the
1
information should be withheld from public disclosure. This section further
requires the staterent to address with specificity the considerations listed
'
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
>
we do not hear from you in this regard within the specified periods noted
i
abe e, a copy of this ietter and the enchned inspection report will be
placed in the Public Document Room.
?
We will gladly discuss any questions you have concerning this inspectiva,
i
Sincerely,
< M
,
R. L. Spessard, Director
Division of Resident and Project
Inspectfon
L
Enclosures:
1.
Appendix A, Notice
'
of Violation
2.
IE Inspection Report
No. 50-346/81-13
ce w/encls:
i
T. D. Murray, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
i
Harold W. Kohn, Power
Siting Commission
Helen W.-Evans, State of Ohio
!
1
!i'
l
'RIII
RIII
RII
RIII
.
A g.
n k y n. y
tes .
RII@If RIl
o
r
Reyes/s
Smith
Rogersf
Tambling
McGregor
Knop-
Sp s rd
!
8/25/81
C
!
-
--
-
.
-
- -
.
.
-