ML20010J042
| ML20010J042 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 09/11/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Nichols T SOUTH CAROLINA ELECTRIC & GAS CO. |
| Shared Package | |
| ML20010J043 | List: |
| References | |
| NUDOCS 8109290539 | |
| Download: ML20010J042 (2) | |
See also: IR 05000395/1981024
Text
nf
n
SEP 11 1981
? iy7, A rn I augS -
South Carolina Electric and Gas Company
'
e
_b
A
8
' .q'.,8-
A
c
ATTN: Mr. T. C. Nichols, Jr. , Vice President
c' 3
'A
'
Power Production and System Operations
gAh, T'
P. O. Box 764
es e
//
Columbia, SC 29218
Y
Mf
,
g% xj
Gentlemen:
!
Subject: Report No. 50-395/81-24
This refers to the routine safety inspection conducted by Mr. T. D. Gibbons of
this office on August 18-21, 1981, of activities authorized by NRC Construction
Permit No. CPPR 94 for the V. C. Summer facility and to the discussion of our
findings held with Mr. S. J. Smith, Maintenance Supervisor, at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information. If your receipt of this letter has been efelayed such
that less than .even days are available for your review, please notify this
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the informacion which identifies the document
cart
thereof sought to be withheld, and a full statement of the reasons on
is
of which it is claimed that the information should be withheld from
.viic
disclosure.
This section further requires the statement, to address with
specificity the considerations listed in '.0 CFR 2.790(b)(4).
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
T60l
.s
Ifl
0109290539 810911
PDR ADOCK 05000395
"'
d
4
..
South Carolina Electric Gas Company
2
SEP 11 193;
Should you have any questions concerning this letter, "e will be glad to discuss
them with you.
Sincerely,
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report No. 50-395/81-24
cc wiencl:
J. B. Knotts, Jr.
O. S. Bradham, Station Manager
J. P. Harrison, Manager Nuclear
Security
C. A. Price, Manager, Nuclear
Engineering
A. A. Smith, Site QA Coordinator
bcc w/ encl:
l
Document Management Branch
NRC Resident Inspector
State of South Carolina
l
RII
R
RII
RII
RII
TGib ons
TConlon
CMurphy
AGibson
PKe log
pi81
gi,,i81
gin i81
Oriiu81
yi81
i
i