ML20010J012
| ML20010J012 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek, Callaway |
| Issue date: | 09/18/1981 |
| From: | Petrick N STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| SLNRC-81-107, NUDOCS 8109290500 | |
| Download: ML20010J012 (8) | |
Text
-
SNUPPS Pandardized Nuclear Unit 5%=or Plant System 5 Choke Cherry Road Nicholas A. Petrick Rockville, Maryland 20850 Executive Director (301) seseoto September 18, 1981 SLNP.C 81-107 FILE: 0278 SUBJ: Pump and Valve Test Program 61] Atj'.9 3
Mr. Harold R. Denton, Director
, ?'/
2,I k j} 9 Office of Nuclear Reactor Regulation 4[F / q h,o#g,y' U.S. Nuclear Regulatory Commission Washington, D. C.
20555 D
Docket hos. STN 50-482, STN 50-483, and STN 50-486 k
' $@%, f.% y';
e J/
yA Ref: SLNRC 81-89, dated September 5, 1981, same subject
\\(p, ef
Dear M:
. Denton:
The referenced letter provided the Callaway Unit 1 pump and valve test program and explained the similarity to that for Wolf Creek.
In dis-cussions with the NRC's Mechanical Engineering Branch, it was learned that some changes to the program were required. The attachment to this letter provides revised pump relief request no. 2 and revised valve relief requests nos.1, 6, 7, 8, and 9.
Ir. addition, a new page (128A) has been added to include four check valves in the compressed air system. These changes are applicable to both Callaway Unit 1 and Wolf Creek.
Very truly vours, 44C Nicholas A. Petrick RLS/jdk Attachment cc:
J. K. Bryan UE G. L. Koester KGE D. T. McPhee KCPL D. F. Schnell UE W. A. Hansen NRC/ CAL T. E. Vandel NRC/WC 3ODI s
ll{
t 8109290500 810918 PDR ADOCK 05000482 A
PDR.
l l
L
PUMP RELIEF REQUEST NO. 2 SYSTEM:
Emergency Fuel Oil System COMPONENT:
PJE01A & PJE01B CLASS:
3 FUNCTION:
To provide fuel oil to the standby diesel generators.
TEST REQUIREMENT:
Measure bearing temperature and vibration and observe lubricant level.
BASIS FOR RELIEF:
There pumps are immersable centrifugal sump pumps located in the emergency fuel oil storage tanks.
ALTERNATE TESTING:
Vibration measurements will be made on the connecting piping quarterly.
SD e
)
~
VALVE RELIEF REQUEST NO. 1 SYSTEM:
M-02AL01 COMPONENT:
V006 V009 V012 V015 CATEGORY:
C CLASS:
3 FUNCTION:
Valves open with differential pressure to provide ?!1ow paths from Essential Service Water System to Auxiliary Feedwater Pumps during a DBA.
Normally closed.
TEST REQUIREMENT:
Exercise the valves every three months.
BASIS FOR RELIEF:
The testing of these valves would result in supplying chemically contaminated water to the steam generators and/or the con-densate storage tank.
i ALTERNATE TESTING: "
Valves v.ill be cuded manually during refueling.
VALVE RELIEF REQUEST NO. 6 SYSTEM:
Accumulator Safety Injection P&ID NO:
M-02EP01 COMPONENT:
8956A through 8956D i
CATEGORY:
C CLASS:
1 FUNCTION:
Opens with differential pressure to provide flow paths from the accumulators to the reactor coolant system cold legs and the reactor vessel.
Normally closed.
TEST REQUIREMENT:
Exercise valves once every three months.
BASIS FOR RELIEF:
During normal operation, the safety injection system has insufficient head to overcome reactor coolant system pressure.
Testing during shut-down increases the probability of a cold over-pressurization event to occur and is therefore in conflict with plant safety.
ALTERNATE TESTING:
A partial stroke exercise of the valves will be performed during cool down for refueling.
A
VALV_E RELIEF REQUEST NO. 7 SYSTEM:
Containment Spcay System P&ID NO:
M-02EN01 COMPONENT:
V002 V008
_ CATEGORY:
C CLASS:
2 TUNCTION:
Opens on differential pressure to supply containment spray water to the discharge nozzles in the recirculation moce.
TEST REQUIREMENT:
Exercise valves once every three months.
BASIS FOR RELIEF:
Valves can not be stroke exercised withouti violating the integrity of penetration numbers P-13 and P-16.
ALTERNATE i
TESTING:
These valves will be cycled manually in conjunction with the system air test per Technical Specification.
5
VALVE RELIEF REQUEST NO. 8 SYSTEM:
Containment Spray System P&ID NO:
M-02EN01 COMPONENT:
V003 V004 V009 V010 CATEGORY:
C CLASS:
2 FUNCTION:
Opens with differential pressure to provide flow paths for the containment spray system.
normally closed.
TEST REQUIREMENT:
Exercise valves once every three months.
BASIS FOR RELIEF:
Pumps can only be tested at partial flow (per FSAR section 6.2.2.1.4).
Therefore, valves in flowpath can only be tested at partial flow.
ALTERNATE TESTING:
Partial flow test the check valves when the spray pumps are tested by recirculation flow back to the RHST.
I.
VALVE RELIEF REQUEST NO. 9 SYSTL.,
Containment Spray System P&ID NO:
M-02EN01 COMPONENT:
V013 V017 CATEGORY:
C CLASS:
2 FUNCTION:
Opens with differential pressure to provide flowpaths for the containment spray he'ader.
Normally clo.:ed.
TEST REQUIREMENT:
Exercise valves once every three months.
BASIS FOR RELIEF:
Normal flowpath cannot be used without dis-charging containment spray water from the nozzles.
f ALTERNATE TESTING:
These valves will be partial stroke tested by air flow l
during the system air test per Technical Specification.
i h
l
]
L.
S"'a'?"'
INSERVICE TESTING PROGRAM rower E
Production ISI CLASS 1,2 & 3 VALVES Engineering "ly" ',,,,,
CALLAWAY NUCLEAR PLANT P&10 R EVISION - D ATE PAGE M-02KA05 o
9/81 128A of 137 SYSTEM COMPRESSEP AIR SYSTEM d
O 4
R EM ARKS O
4 4
g4 q,
q.
VALVE NUMBER
/
Vo48 46 3
A 3/4" CK SA C
C AT RR Note 9
Vo49 F-d 3
A 3/4" CK SA C
C AT RR Note 9 Vobo D-6 3
A 3/4" CK SA C
C AT RR Ncte 9 l.
Vot,1 u-b 3
A 3/4" CK SA C
C AT RR Note 9 i