Proposed Changes to Tech Specs,Correcting Errors in 810130 Submittal Re Reactor Bldg Cooler Surveillance & Svc Water Chlorination ProceduresML20010H784 |
Person / Time |
---|
Site: |
Arkansas Nuclear |
---|
Issue date: |
09/22/1981 |
---|
From: |
ARKANSAS POWER & LIGHT CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20010H773 |
List: |
---|
References |
---|
NUDOCS 8109290291 |
Download: ML20010H784 (3) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20216G0881999-09-19019 September 1999 Proposed Tech Specs Pages,Changing TS 4.18.5.a.9 & Associated Bases for One Cycle of Operation Through End of Cycle 16 for Suppl Use of OTSG Repair Roll Technology ML20216G0721999-09-17017 September 1999 Proposed Tech Specs,Revising Once Through SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Volumetric Integranular Attack ML20212F5851999-09-17017 September 1999 Proposed Tech Specs Pages,Changing TS by Revising Curie Limits for Radioactive Gas Storage Tanks ML20211P0061999-09-0707 September 1999 Proposed TS in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria ML20211B3291999-08-19019 August 1999 Proposed TS 4.18.3.a.4 Clarification Supporting Tube End Cracking Alternative Repair Criteria ML20211C1701999-08-18018 August 1999 Proposed Tech Specs Revising ESAS Low RCS Pressure Setpoint to Ensure That TS Adequately Bounds Safety Analysis ML20211C4101999-08-18018 August 1999 Proposed Tech Specs Removing Requiremets for Tube Repair (Sleeving) & Clarifying Requirements for Preservice & ISI of Tubes to Facilitate Replacement of Original SGs ML20210K5121999-07-29029 July 1999 Proposed Tech Specs,Revising Requirements Associated with Plant Station Batteries & DC Sources to 125 Vdc Switchyard Distribution Sys ML20210K3571999-07-29029 July 1999 Proposed Tech Specs Revising SRs Pertaining to ISI Requirements for SG Tube Circumferential Cracking at top-of-tubesheet During 2P99 Planned mid-cycle Outage ML20209H5811999-07-14014 July 1999 Proposed Tech Specs Revising RB Structural Integrity Requirements Re ISI Reporting for Containment Structures, Tendons & Anchorages ML20209H8701999-07-14014 July 1999 Proposed Tech Specs 6.2.2 & 6.2.2.h,replacing Functional Description of Operations Staff Middle Manager with Ref to Functional Description Assistant Operations Manager & Revising TS Table 6.2-1 Item 5 & TS 6.2.2.f ML20209H9721999-07-14014 July 1999 Proposed Tech Specs Changes for Elimination of Programmatic Requirements Associated with PASS & Regulatory Relief from PASS Requirements of NUREG-0737 & RG 1.97 ML20195D2371999-06-0101 June 1999 Proposed Tech Specs Re Surveillance Requirements & Applicable Bases Relevant to ISI Requirements for Portions of once-through SG (OTSG) Tubes Adjacent to Primary Cladding Region of tube-to Tubesheet Roll ML20206T2651999-05-14014 May 1999 Proposed Tech Specs Revising SG Tubing SRs ML20206Q1281999-05-10010 May 1999 Proposed Tech Specs Bases,Page B 2-2,discussing Guidance to Be Used When Applying Later Editions & Addendas of ASME Code to RCS Components ML20205P4081999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Reactor Bldg Structural Integrity Requirements ML20205P6291999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Battery Requirements ML20205P3731999-04-0909 April 1999 Revised Proposed TS Page 5-1 Re Design Features Conversion ML20205P6931999-04-0909 April 1999 Proposed Tech Specs Change,Adding Specification 3.0.6 & Associated Bases to ANO-2 ML20207C0631999-02-25025 February 1999 Proposed Tech Specs Change Revising Action 2 Associated with Table 3.3-1, Reactor Protective Instrumentation. Change Adds Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable ML20207M7561999-02-24024 February 1999 Proposed Tech Specs,Allowing Startup & Continued Operation of Plant with Channel D Detector Until New Detector Is Installed During mid-cycle Outage Scheduled for Nov 1999 ML20198K1341998-12-17017 December 1998 Corrected Tech Specs Pages to 980629 Application for Amend to License NPF-6 ML20198A3661998-12-0808 December 1998 Proposed Tech Specs B3/4 6-3 & B3/4 6-4,deleting All Requirements Associated with Sodium H Addition Sys & Adding New Requirements for Trisodium Phosphate to Be Stored in Containers Located on Floor of Cb ML20196B4381998-11-24024 November 1998 Proposed Tech Specs Pages,Changing Administrative Controls Section to Implement Consolidated QA Plan Manual & Clarifying Responsibilities on STA Position on Shift ML20153D8491998-09-17017 September 1998 Proposed Tech Specs 2.2.1,3.3.1.1 & 3.3.2.1 Re Operating Bypass Setpoint ML20236Y5081998-08-0606 August 1998 Proposed Tech Specs Section 3.3.4.B Re Sodium Hydroxide Tank Limits ML20236Y5251998-08-0606 August 1998 Proposed Tech Specs Section 3.1.3.2,revising Action Requirements for CEA Position Indicator Channels ML20236Y5951998-08-0606 August 1998 Proposed Tech Specs,Revising Requirements Associated W/Units 1 & 2 Control Room Emergency Ventilation Sys ML20236Q2781998-07-13013 July 1998 Proposed Tech Specs Re Safety Limits & Limiting Safety Settings ML20236G6921998-06-29029 June 1998 Proposed Tech Specs,Revising TS 3.4.2 & TS 3.4.12 Re Reactor Coolant Sys Safety Valves & Low Temp Overpressure Protection ML20236G5421998-06-29029 June 1998 Proposed Tech Specs,Revising Surveillance Testing Requirements for Unit 2 Direct Current Electrical Distribution Sys ML20236G4911998-06-29029 June 1998 Proposed Tech Specs Re MSSVs & Pressurizer Safety Valves ML20236G5631998-06-29029 June 1998 Proposed Tech Specs,Revising Table 3.3-4 to Provide Range of Acceptable Values for 4160 Volt Bus Loss of Voltage Values ML20217M2621998-04-30030 April 1998 Proposed Tech Specs Re DG Load Rejection Testing ML20217N6141998-04-30030 April 1998 Proposed Tech Specs 1.6.1,revising Definition of Quadrant Power Tilt ML20217M4871998-04-28028 April 1998 Proposed Tech Specs Changing Order of Channel Rotation During Outage for Scheduling Flexibility,While Still Requiring Rotation Schedule to Be Established for Operating Cycle ML20217P8141998-04-0101 April 1998 Proposed Tech Specs Re Upper Tubesheet Volumetric Indications to Remain in Svc for Cycle 15 ML20216J7841998-03-17017 March 1998 Proposed Tech Specs Bases Change Concerning Plant Protection Sys Matrix Logic Testing ML20203D1061998-02-18018 February 1998 Proposed Tech Specs Revising Surveillance Testing Requirements for Emergency Feedwater Sys ML20202G9771998-02-0909 February 1998 Proposed Tech Specs Pages,Allowing Use of Repair Roll Technology (Reroll) for Upper Tubesheet Region of SGs ML20197A8421997-12-12012 December 1997 Proposed Tech Specs Re Establishment of Alternate Repair Criteria for Outer Diameter Intergranular Attack in Upper Tubesheet of Unit 1 SGs ML20211C6441997-09-23023 September 1997 Proposed Tech Specs,Modifying RPS & ESFAS Trip Setpoint & Allowable Values for SG Low Pressure ML20211C8911997-09-23023 September 1997 Proposed Tech Specs Reducing Min Required Reactor Coolant Sys Flow Rate Requirements Until ANO-2 SGs Are Replaced ML20151J3371997-07-28028 July 1997 Proposed Tech Specs,Modifying Actions Associated W/Ts Table 3.3-1 for Reactor Protective Instrumentation & Table 3.3-3 for Esfa Sys Instrumentation ML20149K0551997-07-21021 July 1997 Proposed Tech Specs,Revising Surveillance Testing Requirements for Facility EFW Sys as Specified in Specification 4.7.1.2 ML20141C5641997-06-18018 June 1997 Proposed Tech Specs Changes Restoring Table 2 to Table II & Revision to One of Offsite Dose Calculation Manual, Pages Previously Submitted.Also Includes Amended Pages Modified to Amends Issued Since Change Request Submitted ML20141A8001997-05-0808 May 1997 Proposed Tech Specs 3/4.3.1 & 3/4.3.2 Requesting Removal of Reference to CE NPSD-576 ML20138H8521997-05-0202 May 1997 Proposed Tech Specs,Submitting Rev to Original TS Change Request to Reduce Limit Specified in Section 3.1.6.3.b for Leakage Through SG Tubes of Any One Sg,Per SG Tube Insp Surveillance Requirements ML20138D6411997-04-24024 April 1997 Proposed Tech Specs Revising Requirements for Sample Scope Initial Size & Expansion for Inservice Insp of Steam Generator Tube Sleeves ML20141H2621997-04-18018 April 1997 Proposed Tech Specs,Permitting Delay of Scheduled three-yr Inspections of Flywheels on All Four RCPs Until Completion of 2R13 Refueling Outage,Scheduled for Winter of 1998-99 1999-09-07
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217N3171999-10-19019 October 1999 Rev 1,change 024-01-0 to OP-1903.011, Emergency Response Notifications ML20217J7641999-10-0505 October 1999 Rev 1 to Unit 1 Technical Requirement Manual, Replacing Index Page ML20216G0881999-09-19019 September 1999 Proposed Tech Specs Pages,Changing TS 4.18.5.a.9 & Associated Bases for One Cycle of Operation Through End of Cycle 16 for Suppl Use of OTSG Repair Roll Technology ML20212F5851999-09-17017 September 1999 Proposed Tech Specs Pages,Changing TS by Revising Curie Limits for Radioactive Gas Storage Tanks ML20216G0721999-09-17017 September 1999 Proposed Tech Specs,Revising Once Through SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Volumetric Integranular Attack ML20211P0061999-09-0707 September 1999 Proposed TS in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria ML20211B3291999-08-19019 August 1999 Proposed TS 4.18.3.a.4 Clarification Supporting Tube End Cracking Alternative Repair Criteria ML20211C4101999-08-18018 August 1999 Proposed Tech Specs Removing Requiremets for Tube Repair (Sleeving) & Clarifying Requirements for Preservice & ISI of Tubes to Facilitate Replacement of Original SGs ML20211C1701999-08-18018 August 1999 Proposed Tech Specs Revising ESAS Low RCS Pressure Setpoint to Ensure That TS Adequately Bounds Safety Analysis ML20210N5541999-08-0404 August 1999 Rev 28,Permanent Change 4 to OP-1903.061, Communication Equipment Test ML20210N5571999-08-0404 August 1999 Rev 23,Permanent Change 5 to OP-1903.011, Emergency Response/Notifications ML20210K5121999-07-29029 July 1999 Proposed Tech Specs,Revising Requirements Associated with Plant Station Batteries & DC Sources to 125 Vdc Switchyard Distribution Sys ML20210K3571999-07-29029 July 1999 Proposed Tech Specs Revising SRs Pertaining to ISI Requirements for SG Tube Circumferential Cracking at top-of-tubesheet During 2P99 Planned mid-cycle Outage ML20209H5811999-07-14014 July 1999 Proposed Tech Specs Revising RB Structural Integrity Requirements Re ISI Reporting for Containment Structures, Tendons & Anchorages ML20209H8701999-07-14014 July 1999 Proposed Tech Specs 6.2.2 & 6.2.2.h,replacing Functional Description of Operations Staff Middle Manager with Ref to Functional Description Assistant Operations Manager & Revising TS Table 6.2-1 Item 5 & TS 6.2.2.f ML20209H9721999-07-14014 July 1999 Proposed Tech Specs Changes for Elimination of Programmatic Requirements Associated with PASS & Regulatory Relief from PASS Requirements of NUREG-0737 & RG 1.97 ML20195D2371999-06-0101 June 1999 Proposed Tech Specs Re Surveillance Requirements & Applicable Bases Relevant to ISI Requirements for Portions of once-through SG (OTSG) Tubes Adjacent to Primary Cladding Region of tube-to Tubesheet Roll ML20206T2651999-05-14014 May 1999 Proposed Tech Specs Revising SG Tubing SRs ML20206Q1281999-05-10010 May 1999 Proposed Tech Specs Bases,Page B 2-2,discussing Guidance to Be Used When Applying Later Editions & Addendas of ASME Code to RCS Components ML20206J8021999-05-0404 May 1999 PC-03 to Procedure/Work Plan 1904-002, Offsite Dose Projections Rdacs Computer Method ML20205P6931999-04-0909 April 1999 Proposed Tech Specs Change,Adding Specification 3.0.6 & Associated Bases to ANO-2 ML20205P3731999-04-0909 April 1999 Revised Proposed TS Page 5-1 Re Design Features Conversion ML20205P6431999-04-0909 April 1999 Revised Proposed Technical Requirement Manual Pages ML20205P4081999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Reactor Bldg Structural Integrity Requirements ML20205P6291999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Battery Requirements ML20207C0631999-02-25025 February 1999 Proposed Tech Specs Change Revising Action 2 Associated with Table 3.3-1, Reactor Protective Instrumentation. Change Adds Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable ML20207M7561999-02-24024 February 1999 Proposed Tech Specs,Allowing Startup & Continued Operation of Plant with Channel D Detector Until New Detector Is Installed During mid-cycle Outage Scheduled for Nov 1999 ML20198K1341998-12-17017 December 1998 Corrected Tech Specs Pages to 980629 Application for Amend to License NPF-6 ML20198A3661998-12-0808 December 1998 Proposed Tech Specs B3/4 6-3 & B3/4 6-4,deleting All Requirements Associated with Sodium H Addition Sys & Adding New Requirements for Trisodium Phosphate to Be Stored in Containers Located on Floor of Cb ML20196B4381998-11-24024 November 1998 Proposed Tech Specs Pages,Changing Administrative Controls Section to Implement Consolidated QA Plan Manual & Clarifying Responsibilities on STA Position on Shift ML20196C9761998-11-24024 November 1998 Rev 1 to Unit 2 Technical Requirements Manual ML20154D6681998-10-0101 October 1998 Rev 28 to Procedure/Work Plan 1904.002, Offsite Dose Projections Rdacs Computer Method ML20153D8491998-09-17017 September 1998 Proposed Tech Specs 2.2.1,3.3.1.1 & 3.3.2.1 Re Operating Bypass Setpoint ML20153H1651998-08-12012 August 1998 Rev 0 to ANO Units 1 & 2 Technical Requirements Manual ML20236Y5251998-08-0606 August 1998 Proposed Tech Specs Section 3.1.3.2,revising Action Requirements for CEA Position Indicator Channels ML20236Y5081998-08-0606 August 1998 Proposed Tech Specs Section 3.3.4.B Re Sodium Hydroxide Tank Limits ML20236Y5951998-08-0606 August 1998 Proposed Tech Specs,Revising Requirements Associated W/Units 1 & 2 Control Room Emergency Ventilation Sys ML20236Q2781998-07-13013 July 1998 Proposed Tech Specs Re Safety Limits & Limiting Safety Settings ML20236G6921998-06-29029 June 1998 Proposed Tech Specs,Revising TS 3.4.2 & TS 3.4.12 Re Reactor Coolant Sys Safety Valves & Low Temp Overpressure Protection ML20236G5421998-06-29029 June 1998 Proposed Tech Specs,Revising Surveillance Testing Requirements for Unit 2 Direct Current Electrical Distribution Sys ML20236G5631998-06-29029 June 1998 Proposed Tech Specs,Revising Table 3.3-4 to Provide Range of Acceptable Values for 4160 Volt Bus Loss of Voltage Values ML20236G4911998-06-29029 June 1998 Proposed Tech Specs Re MSSVs & Pressurizer Safety Valves ML20199F7211998-05-22022 May 1998 Rev 8 to Simulator Mod Control,Training Desk Guide 6.3 ML20217N6141998-04-30030 April 1998 Proposed Tech Specs 1.6.1,revising Definition of Quadrant Power Tilt ML20217M2621998-04-30030 April 1998 Proposed Tech Specs Re DG Load Rejection Testing ML20217M4871998-04-28028 April 1998 Proposed Tech Specs Changing Order of Channel Rotation During Outage for Scheduling Flexibility,While Still Requiring Rotation Schedule to Be Established for Operating Cycle ML20217P8141998-04-0101 April 1998 Proposed Tech Specs Re Upper Tubesheet Volumetric Indications to Remain in Svc for Cycle 15 ML20216J7841998-03-17017 March 1998 Proposed Tech Specs Bases Change Concerning Plant Protection Sys Matrix Logic Testing ML20203D1061998-02-18018 February 1998 Proposed Tech Specs Revising Surveillance Testing Requirements for Emergency Feedwater Sys ML20202G9771998-02-0909 February 1998 Proposed Tech Specs Pages,Allowing Use of Repair Roll Technology (Reroll) for Upper Tubesheet Region of SGs 1999-09-07
[Table view] |
Text
-
systems which will not remove more than one train of each system from service. Maintenance shall not be performed on components which would make the affected system train inoper-able for more than 24 consecutive hours. Prior to initiating maintenance on any component of a train in any system, the redundant component of that system'shall be demonstrated to be operable within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the maintenance.
3.3.6 If the conditions of Specifications 3.3.1, 3.3.2, 3.3.3, 3.3.4 and 3.3.5 cannot be met except as noted in 3.3.7 below, reactor shutdown shall be initiated and the reactor shall be in hot shutdown condition within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />, and, if not corrected, in cold shutdown condition within an additional 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
3.3.7 Exceptions to 3.3.6 shall ')e as follows:
(A) If the conditions of Specification 3.3.1(F) cannot be met, i reactor operation is permissible only during the succeed-ing seven days unless such components are sooner made operable, provided that during such seven days the other BWST level instrument channel shall be operable.
(B) If the conditions of Specification 3.3.3(D) cannot be met, reactor operation is permissible only durir,g the succeed-ing seven days unless such components are sooner made operable, provided that during such seven days the other CFT instrument channel (pressure of level) shall be operable.
(C) If the conditions of Specification 3.3.4(A) cannot be met because one group of the required reactor building emer-gency cooling units is inoperable but both reactor build-ing spray systems are operable, restore the inoperable group of cooling anits to operable status within 7 days or beinatleasthotshutdownwithinthenext6hoursandin.l cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
(D) If the conditions of Specification 3.3.4(A) cannet be met because two groups of the required reactor building emergency cooling units are inoperable but both reactor building spray systems are operable, restore at least one group of cooling units to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least hot shutdown within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore both above required groups of cooling units to operable status within 7 days of initial loss or be in at least hot shutdown within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
38 t8109290291 010922 PDR ADOCK 05000313
- P.. PDR
(E) If the conditions of Specification 3.3.4(A) cannot be met because one group of the required reactor building emer-gency cooling units are inoperable and one reactor build-ing spray system is inoperable, restore the inoperable spray system to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in dt least hot shutdown within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore the inoperable group of reactor building emergency coolina units to operable status within 7 days of initial loss or be in at least hot shutdown within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
(F) If the conditions of Specification 3.3.4(A) cannot be met because any cooling units of the required groups is inopercble because its asscciated fan is inoperable, verify that the operrble cooling unit in that group has a service water flow rate 2 1200 gpm through its cooling coils or restore the inoperable cooling unit to operable status within 7 days or be in at least hot shutdown within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
Bases The requirements of Specification 3.3.1 assure that below 350 F, adequate long term core cooling is provided. Two low pressure injection pumps are specified. .lowever, only one is necessary to supply emergency coolant to the reactor in the event of a los:-of-coolcnt accident.
The post-accident reactor building cooling and long-term pressure ieduc-tion may be accomplished by four cooling units, by two spray units or by a combination of one cooling unit and one spray unit. Post-accident iodine removal may be accomplished by one of the two spray system strings. The specified requirements assure that the required post-accident components a:e available for both reactor building coolina and iodine removal. Spr,cification 3,3.1 assures that the required equipment is operational.
The borated water storage tank is used for three purposes:
l (A) As a supply of borated water for accident conditions.
(B) As an alternate supply of borated water for reaching cold shutdown. (2)
! (C) Ao a supply of borated water for flooding the fuel transfer canal during refueling operation. (3) l l
38a J
-- r - - - , . , , , w ,.. , -w ~ . - p v ,1- M_
CONTAINMENT SYSTEMS CONTAINMENT COOLING SYSTEM LIMITING CONDITION FOR OPERATION 3.6.2.3 Two independent containment cooling groups shall be OPERABLE with at least one operational cooling unit in each group.
APPLICABILITY: MODES 1, 2, 3, and 4.
- ACTION
- a. With one group of the above required containment cooling units inoperable and both containment spray systems OPERABLE, restore the inoperable group of cooling units to OPERABLE status within 7 days or be in at least HOT STANDBY within the tiext 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUlDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- b. With two groups of the above required containment cooling units inoperable and both containment spray systems OPERABLE, restore at least one group of cooling units to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in :0LD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore both above required groups of oling units to OPERABLE status within 7 days of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the follow-ing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- c. With one group of the above required containment cooling units inoperable and one containment spray system inoperable, restore the inoperable spray system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore the inoperable group of containment cooling units to OPERABLE status within 7 days of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- d. With any cooling unit of the bove required groups inoperable because its associated fan is inoperable, verify that the OPERABLE cooling unit in that group has a service water flow rate E 1250 gpm through its cooling coils or restore the inoperable cooling unit to OPERABLE status within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
ARKANSAS - UNIT 2 3/4 6-14 Amendment No. 16