ML20010H736

From kanterella
Jump to navigation Jump to search
Forwards LER 81-039/03L-0.Detailed Event Analysis Encl
Date released: 01/24/2020 Download: ML20010H736


LER 81-039/03L-0:on 810819,during Operational Transient of Reactor Bldg Closed Cooling Water Pumps,Heat Exchanger Was Subjected to Excessive Sys Flow Causing Tube Failure.Caused by Inadequate Operating Procedures.Faulty Tubes Repaired
ML20010H737
Person / Time
Site: Oyster Creek
Issue date: 09/18/1981
From: Fickeissen K
JERSEY CENTRAL POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20010H737 (1)
Forwards LER 81-039/03L-0.Detailed Event Analysis Encl
ML20010H735
Person / Time
Site: Oyster Creek
Issue date: 09/18/1981
From: Carroll J
JERSEY CENTRAL POWER & LIGHT CO.
To: HAYNES R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20010H735 (3)