F/d4)
,
.
g
,
y@, y,
AllG 261981
W,&
4
rQ
Duke Power Company
c'
hI
O
I
ATTN:
Mr. W. O. Parker, Jr.
-
6G 4^
i
'
((Q h ;[
Vice President, Steam Production
C
P. O. Box 2178
E
Charlotte, NC 28242
j1 &[
~
,
Gentlemen:
Subject: Report Nos@369/81-Mnd 50-370/81-10
This refers to the routine safety inspection conducted by Mr. R. L. Fiedler of
this office on July 21-24, 1981, of activities authorized by NRC License No.
NFF-9 ana Construction Permit No. CPPR-84 for the McGuire facility and to the
discussion of our findings held with Mr. D. J. Rains, Superintendent of Main-
tenance, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspe-tors.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office
by telephone within ten days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days from the
date of this letter a written application to this office to withhold such infor-
mation.
If your receipt of this letter has been delayed such that less than
seven days are available for your review, please notify this office promptly so
that a new due date may be established.
Consistent with section 2.790(b)(1),
such applicat' ion must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from pul'ic disclosure.
This section further
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible inte a separate part of the affidavit. If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public nocument Room.
SGol
S
/ !/
8109240454 810826
PDR ADOCK 05000369
O
- ,
._
..
r-
-
..
.
.
Aug 261981
Duke Power Company
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
P. J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
'
Enclosure:
Inspection Report Nos. 50-369/81-21
and 50-370/81-10
cc w/ enc 1:
M. D. McIntosh, Plar.t Manager
D. G. Beam, Project Manager
bcc w/ enc 1:
NRC Resident Inspector
Document Management Branch
State of North Carolina
.
.
!
RII
RI
RII
RII
RII
I
er:ht
urnatt
CE ur y
AFGibson
MJ
ham
PJKe, ogg
81
Sf15/81
8//A/81
8/,p/81
8/g/81
8/g/8i
1
I
.
-.
.
m.
.
.
.
.
.. ...
.
.
..
.
m
m
.
. . .
.