fkk)
'
?
AUG 2 81981
whiI 5,/,s
-
g
s
y [ t h h
'g
Duke Power Company
b
ATTN: Mr. W. O. Parker, Jr.
- Qg Q
-
Vice President, Steam Production
p
,.eq
co
.-
Cha o
, t C 28242
3
$%p
w
sj
-Gentlemen:
V ,A
O
Subject: Report No. 50-370/81-14
This refers to the routine inspection conducted by Mr. A. B. Ruff of this office
on August 11-14, 1981, of activities authorized by NRC Construction Permit No.
CPPR-84 for the McGuire facility and to the discussion of our findings held with
Mr. M. S. Starnes, Construction Project Engineer, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Wf thin the scope of this inspection, no violations or deviations were disclosed.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office
by telephone within ten days from the dat
of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days from the
date of this letts.r a written application to this office to withhold such infor-
mation.
If your receipt of this letter has been delayed such that less than
seven days are available for your review, please notify this office promptly so
that a new due date may be established.
Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with spet ificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the af fidavit. If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
5GoI
.s
/!/
&"E?agg
.
..
.
--
.-
. . . .
..
..
,
,
Duke Power Company
'2
AUG 2 81981
'
i
Should you have any questions concerning this letter, we will-be glad to discuss
,
them with you.
,
^
Sincerely,
/s/
.
1
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
,
'
Reactor Project Inspection
Enclosure:
Inspection Report No. 50-370/81-14
cc w/ encl:
M. D. McIntosh, Plant Manager
J. T. Moore, Project Manager
,
I
bec w/ encl:
NRC Resident Inspector
Document Management Branch
.
l
State of North Carolina
i
y
f
1
4
9
-
.
- .
'
'
RII
RII
RII
RIIj
R
RII
AR[
aw
y
AFGi son
t RC
s
08/si /81
083 6/81
08/
81
08/
81
_08/'//81
08
8
..
.
.
-.