Forwards IE Insp Rept 50-395/81-19 on 810728-30.No Noncompliance Noted
ML20010H354
Person / Time
Site: Summer 
Issue date: 08/24/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20010H355 List:
References
NUDOCS 8109240382
Download: ML20010H354 (2)


See also: IR 05000395/1981019

Text

f//ow

..

,

AUG 2 41981

, ML I tA x

'

'D '

' (/,

South Carolina Electric and Gas Company

D

?, h

-3

'g $ ,Q(Y

-

ATTN: Mr. T. C. Nichols, Jr. , Vice Pre;ide.c

lO

%

g

79

Power Production and System Operations

-!

g

f

P. O. Box 764

J2'

Columbia, SC 29218

0

2

%\\

?

Gentlemen:

,6

<f,j,i

g

Subject: Report No. 50-395/81-19

'-

This refers to the routine saiccy W, action conducted by Mr. J. J. LenWo of

this office on July 28-30, 1981, of activities authorized by NRC Construction

Permit No. CPPR-94 for the V. C. Summer facility and to the discussion of our

findings held with Mr. O. S. Bradham, 5tatier Manager, at the conclusion of the

i

inspection.

Areas examined during the inspe +.t:

.ind our findings are discussed in the

enclosed inspection repurt.

Witnin these areas, the inspection consistcd of

selective uaminations of procedures and representative records, iaterviews with

personnel, and observations by the inspector.

,

Within the scope of this inspection, no violations or deviations were dist.ased.

One new unresolved it;m resulted from this inspection and is discussed in the

enclosed report. This i+ am will be examined during subsequent inspections.

In acccrdance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report co.ntains any information that you believe to be exempt from dis-

closure under 'O CFR 9.5(a)(4), it is necessary that you: (a) notify this office

by telephone witt.in ten days from the date of this letter of your intention to

file a request fu m :hhclding; and (b) submit within tw rdy-five days from the

date of this letter

written application to this office to withhold such infor-

a

mation.

If your receipt of this letter has been delayed such that less than

seven days are available for your review, please notify this office promptly so

that a new due date may be established.

Consistent with section 2.790(b)(1),

suen application must be accompanied by an affidavit executed by the owner of the

Ir. formation which identifies the document or part thereof sought to be withheld,

And a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information sour % to be withheld shall be incorporated

as far as possible into a separate part cf cne affidavit. It we do not hear fro n

you in this ngard within the specified periods ncted above, the report will be

placed in the PuYiic Document Rocc

N

$

Yl

8109240382 810824 D

PDR ADOCK 05000395

G

PDR

'

.

_.

._

_.

.

-

- . -

. .. . .

.

.

.

-

.-

,.

South Carolina Electric and

AUG 2 41981

Gas Company

2

Should you have any questions concerning this letter, we will be glad to d : uss

them with you.

Sincerely,

kre> r.s

P. J. Kellog3 Chief

Reactor Projects Pracch 2

Division of Residm and

Reactor Project Inspection

Enclosures:

Inspection Report No. 50-395/81-10

cc w/ encl:

J. B. Knotts Jr.

A. A. Smith, Site QA Coordinator

0. S. Bradham, Station Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of South Carolina

RII

RII

RII

RII

R

RIIl9<f

.:Q

Chp1(y

A

.urp

AFGi son

VBrownlee

FJKellogg

JJLenahan:ht

T rr,,n l on

8p!81

8/J//01

8g/81

8/V/81

8/ V81

8/g81

3