ML20010H294
| ML20010H294 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 09/03/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML20010H295 | List: |
| References | |
| NUDOCS 8109240311 | |
| Download: ML20010H294 (2) | |
See also: IR 05000369/1981024
Text
-
.
.
- -
elku)
-
.
SEP 3
1981
% TW,,
-
i
,
h,$ h%
Duke Power Company
If
Y, $ p09
4 P
79
_'
ATTN:
Mr. W. O. Parker, Jr.
-I
v.
Vice President, Steam Production
- $
P. O. Box 2178
%
%h
g S/
-
Charlotte, NC 28242
'g
~\\g
f/
-
Gentlemen:
Subject: Report Nos.6369/81Dnd 50-370/81-12
This refers to the routine safety inspection conducted by Mr. R. L. Fiedler of
this office on August 4-13, 1981, of activities authorized by NRC License No.
NPF-9 and Construction Permit No. CPPR-84 for the McGuire facility and to the
discussion of our findings held with Mr. M. D. McIntosn, Plant Manager, at the
conclusion of the inspection.
.
Areas examined during the inspection and our find'ngs are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted
f
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item wili be examined during subsequent inspections.
In accordance with 10 CFR 2.700 of the Commission's regulations, a copy of this
'
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any informatior, that you believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office
by telephone within ten days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days from the
date cf this letter a written application to this office to withhold such infor-
mation.
If your receipt of this letter ias been delayed such that less than
3even days are available for your review, please notify this office promptly so
that a new due date may be established.
Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit. If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
56o l
s
///
>
8109240311 810903
PDR ADOCK 05000369
G
.
.
SEP 3
198)
.
Duke Power Company
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
b 'f % f
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Res! dent and
Reactor Project Inspection
Enclosure:
Inspection Report Nos. 50-369/81-24
and 50 370/81-12
cc w/ encl:
M. D. McIntosh, Plant Manager
J. T. Moore, Project Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of Nor9 Caro'ina
RII
RII
RII
RII
RII
RIIg
P
iedlec:ht
t'
CE ur hy
on
a
nt
g
df/7 /81
/p/81
/ p/81
$/pd1
9/w/81
$/ t/81
_
J