ML20010H294

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-369/81-24 & 50-370/81-12 on 810804-13.No Noncompliance Noted
ML20010H294
Person / Time
Site: McGuire, Mcguire  
Issue date: 09/03/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20010H295 List:
References
NUDOCS 8109240311
Download: ML20010H294 (2)


See also: IR 05000369/1981024

Text

-

.

.

-

elku)

-

.

SEP 3

1981

% TW,,

-

i

,

h,$ h%

Duke Power Company

If

Y, $ p09

4 P

79

_'

ATTN:

Mr. W. O. Parker, Jr.

-I

v.

Vice President, Steam Production

$

P. O. Box 2178

%

%h

g S/

-

Charlotte, NC 28242

'g

~\\g

f/

-

Gentlemen:

Subject: Report Nos.6369/81Dnd 50-370/81-12

This refers to the routine safety inspection conducted by Mr. R. L. Fiedler of

this office on August 4-13, 1981, of activities authorized by NRC License No.

NPF-9 and Construction Permit No. CPPR-84 for the McGuire facility and to the

discussion of our findings held with Mr. M. D. McIntosn, Plant Manager, at the

conclusion of the inspection.

.

Areas examined during the inspection and our find'ngs are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted

f

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item wili be examined during subsequent inspections.

In accordance with 10 CFR 2.700 of the Commission's regulations, a copy of this

'

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any informatior, that you believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office

by telephone within ten days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five days from the

date cf this letter a written application to this office to withhold such infor-

mation.

If your receipt of this letter ias been delayed such that less than

3even days are available for your review, please notify this office promptly so

that a new due date may be established.

Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure.

This section further

requires the statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit. If we do not hear from

you in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

56o l

s

///

>

8109240311 810903

PDR ADOCK 05000369

G

PDR

.

.

SEP 3

198)

.

Duke Power Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

b 'f % f

Paul J. Kellogg, Chief

Reactor Projects Branch 2

Division of Res! dent and

Reactor Project Inspection

Enclosure:

Inspection Report Nos. 50-369/81-24

and 50 370/81-12

cc w/ encl:

M. D. McIntosh, Plant Manager

J. T. Moore, Project Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Nor9 Caro'ina

RII

RII

RII

RII

RII

RIIg

P

iedlec:ht

t'

CE ur hy

AF

on

a

nt

g

df/7 /81

/p/81

/ p/81

$/pd1

9/w/81

$/ t/81

_

J