ML20010H282

From kanterella
Jump to navigation Jump to search
Advises That Visual Insps & Testing of Mechanical Snubbers, in Response to IE Bulletin 81-01,have Not Been Performed, Due to Scheduling Delays,But Will Be Conducted After Hot Functional Testing & Prior to Fuel Load
ML20010H282
Person / Time
Site: Summer 
Issue date: 08/31/1981
From: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-81-01, IEB-81-1, NUDOCS 8109240297
Download: ML20010H282 (1)


Text

-

I

2 Souir, CAROLINA ELECTRIC a GAS COMPANY /

POST OFFICE BOR 784 Cotuwe:A, souin CAnoLINA 29218 T. C. NicMots, JR.

August 31, 1981 l "co 2 A3 e [/ s WE Patsiotut,,o Geove Enscutrvt NUCLEAn OpenAriosis

@yMC 1

~

? $ k_

'd Mr. James P. O'Reilly U. S. Nuclear Regulatory Commission lh go t 3 Region II, Suite 3100

\\.~

t;4 r'

M IS '

' -).

101 Marietta Street, N.W.

j, T, 3

Atlanta, Georgia 30303

Subject:

Virgil C. Summer Nuclear $tation Docket No. 50/395 I&E Bulletin 81-01, Rev. 1 Dear Mr. O'Reilly In a previous response to IE Bulletin 81-01 dated March 17, 1981, South Carolina Electric and Gas Company comitted to performing visual inspections and " push-pull" testing on mechanical snubbers installed on safety related systems during the period July 1,1981, through August 21, 1981. As a result of scheduling delays these tests have not yet been performed; but will be conducted af ter Hot Fun:tional Testing and prior to fuel load.

If you have any questions, please call us.

Ver truly yours,

. C. Nichol s,'Jr.

NEC:TCN:lkb cc:

V. C. Summer G. U. Fischer H. N. Cyrus T. C. Nichols, Jr.

O. W. Dixon, Jr.

l J. C. Ruoff D. A. Nauman W. A. William, Jr.

R. B. C1 ary O. S. Bradham

[ Ij A. R. Koon A. A. Smith 3

H. Radin

/

M. N. Browne

)/O H. E. Yocom B. A. Bursey J. K. Skolds I&E (Washington)

Document Management Branch

  • (b5e, 21, LER only)

NPCF 8109240297 8104iU1 File PDR ADOCK 05000395

.G PDR t