Forwards LERs 81-056/03L-0,81-058/03L-0,81-060/03L-0, 81-061/03L-0,81-062/03L-0 & 81-063/03L-0
Date released: 01/24/2020 Download: ML20010G766


LER 81-063/03L-0:on 810812,power Supply Breaker Was Inadvertently Racked Out Rendering R11 & R12 Inoperable. Caused by Personnel Failing to Recognize Both Inboard & Outboard Pumps Operate Through Same Supply Breaker
ML20010G832
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/09/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010G832 (2)
LER 81-062/03L-0:on 810809,train a Penetration Room Filtration Sys Did Not Operate as Required.Caused by Failure of Dc Controller Card.Card Replaced & Calibr
ML20010G824
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/09/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010G824 (1)
LER 81-061/03L-0:on 810819,diesel Generator 2C Declared Inoperable When Prematurely Removed from Svc for Preventative Maint.Caused by Personnel Tagging Out W/O Final Approval of Operations Personnel
ML20010G815
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/09/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010G815 (1)
LER 81-060/03L-0:on 810812,loop a Temp Average Protection Channel 412D Declared Inoperable When Temp Indicator Failed Low.Caused by Failure of lead-lag Card.Card Replaced & Calibr
ML20010G788
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/09/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010G788 (1)
LER 81-058/03L-0:on 810813,containment Radioactivity Monitoring Sys R11 & R12 Were de-energized.Caused by Failure of 600/208-volt Transformer.Transformer replaced.R11 & R12 re-energized
ML20010G782
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/09/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010G782 (1)
LER 81-056/03L-0:on 810817,supply Breaker for 1A Charging Pump Was Inadvertently Racked Out.Caused by Personnel Tagging Unit 2 Pump 2A Instead of Unit 1 Pump 1A.Personnel Counseled
ML20010G774
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/09/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010G774 (1)
Forwards LERs 81-056/03L-0,81-058/03L-0,81-060/03L-0, 81-061/03L-0,81-062/03L-0 & 81-063/03L-0
ML20010G765
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/09/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010G765 (1)