[pa rn ,D u o UNITED STATES 8" E NUCLEAR REGULATORY COMMISSION o . oE REGION 111 $ [[ 799 ROOSEVELT ROAD g GLEN ELLYN, ILLINOIS 60137
- ..*
SEP 1 e 1981 g\\* g eg y } Docket No. 50-409 l OfPg Dairyland Power Cooperative h f, ATTN: Mr. F. W. Linder 4 f C General Manager 1ff2/qNNg \\ j - 2615 East Avenue - South La Crosse, WI 5J401 ' Gentlemen: This refers to the routine safety inspection conducted by Messrs. W. L. Forney and M. W. Branch of this office on July 1-31, 1981, of activities at La Crosse Boiling Water Reactor authorized by NRC Operating License No. DPR-45 and to the discussion nf our findings with Mr. R. Shimshak at the conclusion of the in- spection. The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and in- terviews with personnel. During this inspection, certain of your activities appeared to be in non- compliance with NRC requirements, as specified in enclosed Appendix A. A written response, submitted under oath or affirmation, is required. In accordance with 10 CFR 2 790 of the Commission's regulations, a copy of this letter, the enclosures, and your response to this letter will be placed in the NRC's Public Document Room. If the enclosures contain any information that you or your contractors believe to be exempt from dis- closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within seven (7) days from the date of tM- letter of your intention to file a request for withholding; and (b) subm_ ithin twenty-five (25) days from the date of this letter a written appi. cation to this office to withhold such information. Section 2.790(b)(1) requires that any such application must be accompanied by an affidavi; executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons which are the bases for the claim that the information should be withheld from public disclosure. This section further requires the statement to address T S l 8109220247 810910 PDR ADOCK 05000409 // G PDR / - / - - .
. . Dairyland Power Cooperative -2- SEP 101301 with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. LIf we do not hear from you in this regard within the specified periods noted above, e copy of this letter, the enclosures, and your response to this letter will be placed in the Public Document Room. We will gladly discuss any questions you have concerning this inspection. Sincerely,. s ' . . R. L. Spessa d, Director Division of Resident and Project Inspection Enclosures: 1. Appendix A, Notice of Violation 2. IE Inspection Report No. 50-409/81-14 cc w/encls: R. E. Shimshak, Plant Superintendent DMB/ Document Control Desk (RIDS) Resident Inspector, RIII John J. Duffy, Chief Boiler Inspector Stanley-York, Chairman Public Service Commission RIII RIII JIII RIII RII 797W] hr. [9tk. h .7.W0 tup \\ 'f2( Forney/so BranchF McGr e' gor . Knob S sard 8/31/81 }}