Appendix A NOTICE OF VIOLATION Dairyland Power Cooperative Docket No. 50-409 As a result of the inspection conducted on July 1-31, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violation was identified:
LACBWR Technical Specification 6.11 states: " Procedures for personnel radiation protection shall be prepared consister.t with the requirements of 10 CFR Part 20 and shall be approved, maintained and adhered to for all operations involving radiation exposure."
LACBWR Operating Manual, Volume X, Section 6.5.3 stated in part:
(7)
"Each worker assigned to the Special Work Permit (SWP) will complete the required information for each entry into the work area on the entry copy of the SWP."
Contrary to the above, on June 22, 1981, several plant management personnel failed to indicate, on the job site copy of "WP (81-115),
their entry into and exit from the work site.
It is recognized that your staff has revised Operating Manual, Volume X, Section 6 to delete the requirements to sign in and out of a radiation area at the job site.
This is a Severity Level V (Supplement I).
Pursuant to th provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written state-ment or explanation in reply, including for each item of noncompliance:
(1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full com-pliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation. Consideration may be given to extending your response time for good cause shown.
SEP 101981 f],
', J,x,.,.,c,. i,
Dated R.L.Spessard$ Director Division of Resident and Project Inspection 8109220253 810910' PDR ADOCK 05000409 (D
- -