ML20010G215

From kanterella
Jump to navigation Jump to search
Discusses Actions Util Has Agreed to Undertake as Result of 810827 Meeting W/Nrc Re Emergency Preparedness.Emergency Organization Will Be Revised & Emergency Plan Updated by 811028
ML20010G215
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/08/1981
From: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lempges T
NIAGARA MOHAWK POWER CORP.
References
NUDOCS 8109150445
Download: ML20010G215 (2)


Text

Is 0 8 SEP 198L__ N c.g i rp Docket No. 5C-220 Y

V l2.7N,e<g\\vf

/,2 g

Niagaru Mohawk Power Corporation G hy'.'y RI ATTN: Mr. T. E. Lempges

~~

Vice Fresident o

i%Y.

Nuclear Generation 9

/s 300 Erie Boulevard, West E'

Syracuse, New York 13202 f

Gentlemen:

This refers to a meeting between you and members of your staff and Mr. N. M. Tere of this office and other members of the NRC Emergency Preparedness Appraisal Implementation Team which was Lald at the Nine Mile Point Nuclear Station on August 27, 1981, and to a telephone i

conver:,ation between you and Mr. G. L. Snyder of my staff on September 8,1981.

l With regard to the matters relating to emergency preparedness discussed at this meeting, we understand that you will undertake and complete the following actions:

1 Revise your emergency organization to provide for all of the emergency functions required during initial, intermediate and final phases of augmentation; update your site anergency Plan to describe the revised organization; and issue revised implementing procedures as necessary to be consistent with the revised organization. The updated description in the Plan shall include a sufficient level of detail to: unambiguously delineate the command hierarchy; clearly specify its structure, reporting c1ains and inter-relationshiops at any phase of augmentation; and, I

include supervisory as well as non-supervisory elements.

This will be accomplished r.o later than October'28,1981.

2.

Provide approved lists of personnel in the emergency organization segregated I

by individual training qualification which reflects each functional area specified within the emergency organization revised in accordance with Item 1.

These lists shall identify the current training status of each individual.

Provisions to maintain the lists current shall be developsd and implemented.

g This wil' be accomplished no later than September 15, 1981.

5 j

///

l 4

[SMJTH ph EPOS D

DIP P.

I P

dPhi L

P f

ALL_

HAYNES TE

~ BORES SNYDER DBRUNNER 9/ 7 /81 9/A /81 9/ [/81 b/ /[/61 9/J/81 9/

/81 9/

/81 p,, L, a en

-e OFFICIAL RECORD COPY

/

M c) gj e

y h

[

8109150445 810908 DRADOCK05000g

[

F Niagara Mohawk Power Corporation 2

0 8 SEP 1981 3.

Re-evaluate interim facilities, equipment ant' procedures for post-acciient sampling and analysis during emergency conditions (e.g., primary coolant samples, containment, atmosphere samples, and samples of plant vent effluents) to determine maximum concentrations that ct>uld be handled and analyzed under accident conditions. Provide a written report of the results of your evaluation.

If deficiencies are identified, include a description of and a schedule fer your planned actions.

This will be accomplished ao later than October 13, 1981.

4.

Re-evaluate provisions to rapidly and accurately detect and measure airborne radiciodine concentratio;.s undcr field conditions in the presence of radiation levels due to noble gases.

Provide a written report of the results of your evalostion.

If deficiencies are identified, include a description of and a schedule for your planned acticns.

This will be accomplished by no later than October 13, 1981.

If our understanding of your planned actions, described above, is not 1:

accordt,nce with the actual plans and actions being implemented, please contact this office by telephone and in writing within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Sin'erely, c

O l

)

C~uAg

/ t< p.

Ronald C. Haynes Director cc:

T. Perkins, General Superintendent, Nuclear Generation T. Roman, Station Superintendent R. Abbott, Operations Supervisor E. B. Thomas, Jr., Esquire i

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspec or

$ tate of New York bec: Region I Docket Ro6m (with concur"ences)

B. Grimes, DEP, IE:HQ S. Schwartz, DEP, IE:HQ l

l 0FFICIAL RECORD COPY l

.