SUMMARY

OF PLANT OPERATIONS 8-1 to 8-5 Continuous operation at 100% power. Performed routine surveillance and preventive maintenance.

8-6 Low oil level alarm on "A" Reactor Coolant Pump 1715 Reducing power to 70%

2230 Reactor power at 70%--holding 8-7 0200 Started decreasing power at 10 MW/ min to add oil to Reactor Coolant Pump 0256 Turbine taken off line 0702 Began increasing reactor power 1043 Main unit paralled 1538 Reactor / Turbine Trip 2033 Reactor Critical 8-8 0012 Closed OCB's, began increasing reactor power 1825 Reactor at 100% power 8-9 to 8-12 Continous operation at 100% power. Performed routine surveillance and preventive maintenance.

8-13 0202 Received high vibration alarm on main turbine bearing #9 0315 Received high vibration alarm on main turbine bearing #4 0320 Reducing power and shuting plant down due to high turbine bearing vibration 0354 Opened OCB's and tripped turbine 0411 Holding reactor at approximately 5% power 2040 RCS in cold shutdown 8-14 to 8-31 Cold shutdown due to disabled turbine 0$0000fg PDR

1

~

PERSONNEL CHANGES REQUIRING REPORTING No personnel changes that required reporting in accordance with Technical Specification Figure 6.2-2 were made in August, 1981.

I 1

i

SUMMARY

OF CHANGES IN ACCORDANCE WITH 10 CFR 50.59(b) i No changes in accordance with 10 CFR 50.59(b) were made during the month of August, 1981.

i-HAJOR ITEMS OF SAFETY RELATED MAINTENANCE 1

1.

Replaced gasket in boric acid pump "B".

2.

Cleaned solenoid-head operators of steam generator sample line isolation valve.

4 j.

3 Leak tested waste gas. compressor outlet connections and tightened all fittings.

)

4.

Readjusted electric governor limit switches of "B" diesel generator.

5 Repaired nuclear service transformer X 43 B1 (spa re).

s I

h 1

4 l

.i.

1 I

i m.m

..m

.m

REFUELING INFORMATION REQUEST 1.

Name of Facility:

Rancho Seco Unit 1 2.

Scheduled date for next refueling shutdown:

April. 1982 3.

Scheduled date for restart following refueling:

October. 1982 4.

Technical Specification change or other license amendment required:

a)

Change Rod Index vs. Power Level Curve (TS 3.5.2) b) Change to Core Imbalance vs. Power Level Curve (TS 3.5.2) c) Tilt Limits (TS 3.5.2) 5.

Scheduled date(s) for submitting proposed licensing action:

February, 1982 6.

Important licensing considerations associated with refueling:

None 7.

Number of fuel assemblies:

a)

In the core:

177 b)

In the Spent Fuel Pool:

196 8.

Present licensed spent fuel capacity:

579 f

9.

Projected date of the last refueling that can be discharged l

l to the Spent Fuel Pool:

1987 i

l l

l t

i l

L

J AVERAGE DAILY UNIT POWER LEVEL l

DOCKET NO.

50-112 UNIT Ranchn Seen fin i t 1 DATE 81-08-31 COMPLETED BY R. W. Cninmhn TELEPHONE (916) 452-1211 MONTH Auaust. 1981 DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL iMWe-Net) iMWe-Neti I

790 g7 0

2 789 Ig n

3 786 39 0

786 0

4 20 5

780 yg 0

729 0

6 22 Ob 7

23 0

g 641 24 0

9 773 25 0

10 777 26 0

11 778 27 0

j 12 781 g

0 13 123 29 0

0 0

14 30 15 0

0 33 16 0

INSTRUCTIONS Ca this format. list the aserage daily unit power lesel in MWe Net for each day in the reportmg month. Compute to I

the nearest whole megawatt.

I (9 /77 )

i

T OPERATING DATA REPORT DOCKETNO. 50-312 DATE 81-08-31 COMPLETED BY R. W.

Colombo TELEPliONE (916) 452-3211 OPERATING STATUS Notes

1. Unit Name:

Ranchn hen fin i ? 1

2. Reporting Period:

Auoust. 1981 Shutdown August 13 due to

3. Licensed Thermal Power (M'iti:

2772 disabled turbine.

4. Nameo! ate Ra:in: IGross MWel:

963

5. Desip$ Electrical RatingINet MWel:

9IO

6. 31aximum' Dependable Capacity iGross MWe):

917

7. Maximum Dependable Capacity (Net 31Wel:

873

8. If Chan;es Occur in Capacity Ratin;s litems Number 3 Through 7) Since Last Report. Gise Reasons:

N/A

9. Power Lese! To which Restricted. If Any (Net 31We): N/A
10. Reasons Fer Restrictions.If Any:

N/A This 31or.th Yr to Date Cumulative

11. Hours In Reporting Period 744 5,831 55,872
12. Number of floun Reactor Was Critical 288 3 2.352.4 33.848.6
13. Reactor Resen Shutdown tiours 432.1 452.1 4,921.7_
14. Hours Generator On-Line 275.4 2.251.6 32.497.2
15. Unit Re,ene Shutdown flours 0

0 1.210.2

16. Gross Thermal Ener;:y Generated (Sibil) 755.457 5.736.849 82.709,104
17. Gross Electrical Energy Generated iMhlis 217.012 1.747.567 27.695.281
18. Net Electrica! Energy Generated MWII) 202.118 1.633.349 26.159.474
19. Unit Senie: Factor 17.0 38.6 58.2
20. Unit Asailabili:y Factor 37.0 38.6 60.3
21. Unit Capacity Factor (Using MDC Net) 31.1 _

32.1 53.6

22. Unit Capacity Factor tU3!ng DER Net) 29.6 30.5 51.0
23. Unit Forced Outa;e Rate 62.9 34.9 29.4
24. Shutdowns Scheduled Oser Nest o Months (Type.Date.and Duration of Eachi:

N/A

25. If Shut Down At End Of Report Perind. E>tinuteJ Date of Startup:

October 19. 1981

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITI \\ L CRl!!CA LITY N/A N/A INITI \\L ELECT RIC IT)

N/A__

N/A C0\\lMERCI AL OPLR \\ TION N/A N/A Pl/77) 1

o DOCKET NO. 50-312 UNIT S11UTDOWNS AND POWER REDUCTIONS UNIT NAME Rancho Seco Unit 1 DATE 81-08-11 COMPLE'I ED llY R-L1 - rninmhn REPORT MON 111 Auoust. 1981 TELEPilONE (916) 452-3211 w.

E 15 jg g

4Y3 Licer.sce

,E-t,

  • n, Cause & Corrective g

No.

DJte Q

3g n

js$

Event gg o.1 Action to fE js di e Report se mo Eo Prevent Recurrence H

g o

C 6

8-7-81 F

7.8 B

1 N/A PUNPXX Low oil level in RCP "A" i

7 8-7-81 F

8.7 A

3 N/A HA TURBlH Separated from bus due to loss of turbine control--RCP failed to transfer to off site bus 8

8-13-81 F

452.1 A

1 N/A HA TURBIN Turbine disabled by high vibration i

2 3

4 F: Forced Reason.

Method:

Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Man ual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LE R) File (NUREG-D Regulatory Restriction 4-Ot her (Explain) 01611 E-Operator Training & License Examination F-Administ rative S

G Operationa! Error (Explain)

Exhibit I -Same Source (9/77)