ML20010F206
| ML20010F206 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 07/09/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML20010F195 | List: |
| References | |
| NUDOCS 8109090494 | |
| Download: ML20010F206 (2) | |
See also: IR 05000369/1981015
Text
,
-
O
..
,
- DM
I
o
UNITED STATES
Ng
['
k
NUCLEAR REGULATORY COMMISSION
a
REGION 11
k
101 MARIETTA ST N.W..SulTE 3100
...../
ATLANTA, GEORGIA 30303
g.
g09 1981
.
Duke Power Company
ATTN: Mr. W. 0. Parker, Jr.
Vice president, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
Subject: Report No. 50-369/81-15
This refers to the routine safety inspection conducted by Ms. M. J. Graham of this
office on April 27 - May 15, 1981, of activities authorized by NRC Operating
License No. NPF-9 for the McGuire Unit 1 facility. Our preliminary findings were
discussed with Mr. M. McIntosh, Plant Manager, at the conclusion of the inspec-
tion.
Areas examined during the inspection and cur findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
The licensee has made one new committment and clarified an earlied commitment.
These are addressed in Paragraphs 8 and 10 of the attached details.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
,
office by telephone within ten days from the date of this letter of your inten-
tion to file a request for withhciding; and (b) submit within twenty-five days
from the date of this letter a written application to this offica to withhold
such information. If your receipt of this letter has been delaved such that less
than seven days are available for your review, please notify this office promptly
so that a new due date may be established. Consistent with section 2.790(b)(1b
such app'.ication must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought tu be withheld,
and a full statement of the reasons on the basis of which it is claimed th.?.t the
information should be withheld from public disclosure. This section further
-
8109090494 810828
'
PDR ADOCK 05000369
U
'
.
.
.
,
't
,
Duke Power
2
JUL09 581
l
I
l
requires the statement to address with specificity the considerations listed in
l
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit.
If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
l
Sincerely,
,
,
1
l
l
1
A
Division of[ Resident andqfctingDiredtor
. C. Lewis
i
l
Reactor Project Inspection
i
Enclosures:
!
1.
Appendix A, Notice of Violation
l
2.
Inspection Report No. 50-369/81-15
cc w/ enc 1:
M. D. McIntosh, Plant Manager
,
!
J. C. Rogers, Project Manager
!
!
l
,
I
t
1
.
-
.-
.
__ - -