4
- '
/
'o
UfJITED STATES
- COI;y
, %'-' f' j
dp
I
. NUCt. EAR REGULATORY COMMISSION
w
e
REGION II
-,a, ' t.j%r
l
g;*...-,/f
10* MARIETTA ST., NE SulTE 3100
,
j
ATLANTA, GEORGIA 00003
jut 1 26 s 81
South Carolina Electric and Gas Company
ATTN: Mr. T. C, Nichols, Jr. , Vice President
.
Power Production and System Operations
F. O. Box 704
Columbia, SC 29218
l
Gentlemen:
Subject: Report No. 50-%5/81-13
This refers to tne special safety inspection conductec by Mr. W. H. Miller, Jr,
of this office on May 26, 1981, of activities authorized by NRC Construction
l
Permit No. 94 for the Surmer facility. Our preliminary findings were discussed
l
with Mr. O. S. Bradham, Plant Manager, at the conclusion of the inspection.
'
Areas examined during this inspection included fire protection / prevention.
Within these areas, the inspection consisted of selective examinations of
p"ocedures ated representative records, interviews with personnel, and observa-
tions by the inspector.
,
Witnin the scope of th's inspectio 1, b v'aiations were disclosed.
l
During the inspection it was found that cera9 activities under your licen.e
appear to deviate from commitments to the Cor.m ssion and have safety signifi-
l
cance. This item is identified in the Notice of Deviation enclosed herewith as
l
Appendix A.
Ple ue provide us in writing your comments including a description
'
of corrective actions that have been or will be taken, corrective actions which
will be taken to avoid further deviations, and the date ycer corrective actions
will be completed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items :s discussed
in the enclosed report.
One new unresolved item is identified in the enclosed inspecti::n report.
This
item will be examined during subsequent inspections.
In accordsnce with 10 CFR 2.790 of the Commission's regu;4tions, a copy ei this
letter and the enclosed report will be placed in the NRC's Public Document Room.
.
If the report contains any information that you believe to be exempt from
I
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your inten-
<
tion to f;h a request for withholding; and (b) submit within twenty-five days
l
L
from the date o' this letter a written application to this office to withhold
!
such informatice
If your receipt of this letter has been delayed such that less
-
than seven days are available for your review, plea.4e notify this office promptly
so that a new due date tray be established. Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
',
8109090461 810827-
POR ADOCK 05000395
g
PDP.
.
._-
_
-
_
_.
.
. _ .
.
.
-
- -
.-
.. .
,
,
JU N 261981
-
'"
-
.
,
South Carolina Electric and
2
Gas Company
i
I
!
and a full statement of the reasons on the basis of which it is claimed that the
l
information should be withheld from public disclosure.
This section 'further
i
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit.
If we do not hear from
you in this regard-within the specified periods noted above, the report will be
placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
-
them with you.
l
Sincerely,
l
.
[R.C.
.
!
.C.
wis, Acting Director
Division of Resident and
,
j'
Reactor Project Inspection
,
l
Enclosures:
1.
Appendix A, Notice of Deviation
2
Inspection Report No. 50-395/81-13
cc w/ enc 1:
J. B. Knotts, Jr.
A. A. Smith, Site QA Coordinator
0. S. Bradham, Manager
Nuclear Operations
'
,
,