ML20010F034

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-395/81-18 on 810721-24.No Noncompliance Noted
ML20010F034
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 08/11/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20010F035 List:
References
NUDOCS 8109090291
Download: ML20010F034 (2)


See also: IR 05000395/1981018

Text

?

fh%

AUG 11 1981

'

ga s.Om

b

'

pFHts

South Carolina Electric and Gas Company

Jb

S

ATTN:

Mr. T. C. Nicpols, Jr. , Vice President

-

g; gg jggW Tg

Power Production and System Operations

P. O. Box 764-

"A % 7 ]

j

Columbia. SC 29218

8

3

Gentlemen:

9

q

Subject: Report No. 50-395/81-18

This refers to the routine safety inspection conducted by Mr. A. B. Ruff of this

office on July 21-24, 1981, of activities authorized by NRC Construction Permit

No. CPPR-94 for the V. C. Summer facility and to the discussion of our findings

held with Mr. O. S. Bradham, Manager Nuclear Operations, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed i

the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

i

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from disclo-

'

sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by

!

telephone within ten days from the date of this letter of your intention to file

!

a request for withholding; and (b) submit within twenty-five days from the date

l

of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven days

are available for

due date may be established.your review, please notify this office promptly so that a new

Consistent with section 2.790(b)(1), such applica-

tion must be accompanied by an affidavit executed by the owner of the information

which identifies the document or part thereof sought to be withheld, and a full

i

statement of the reasons on the basis of which it is claimed that the information

!

should be withheld f rom public disclosure.

This section further requires the

,

statement to address with specificity the considerations listed in 10 CFR 2.790-

( b)( 4 ) .

The information sought to be v.ithheld shall be incorporated as far as

possible into a separate part of the af fidavit.

If we do not hear from you in

this regard within the specified periods noted above, the report will be placed

in the Public Document Room.

i

i

@10909C291 810811

Ogl

e

PDR ADOCK 05000395

O

PDR

,

l

,

o

.

,

South Carolina Electric and

gg y y )gg

Gas Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

htoi S

P. J. Kellogg, Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report No. 50-395/81-01

cc w/ enc 1:

J. B. Knotts, Jr.

A. A. Smith, Site QA Coordinator

0. S. Bradham, Manager

Nuclear Operations

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of South Carolina

.

RII

RII

Y -

RII

RII

g4

TEc}onon

j'+k

RII)

/

q

ALVMf:ht

C Murphy

(FGibson

VBrownlee

. Nellogg

<

8/ /81

]/(i /81

/,z/81

Cy /81

$/ *!81

f'f()/81

3

t