ML20010F034
| ML20010F034 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 08/11/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Nichols T SOUTH CAROLINA ELECTRIC & GAS CO. |
| Shared Package | |
| ML20010F035 | List: |
| References | |
| NUDOCS 8109090291 | |
| Download: ML20010F034 (2) | |
See also: IR 05000395/1981018
Text
?
fh%
AUG 11 1981
'
ga s.Om
b
'
pFHts
South Carolina Electric and Gas Company
Jb
S
ATTN:
Mr. T. C. Nicpols, Jr. , Vice President
-
g; gg jggW Tg
Power Production and System Operations
P. O. Box 764-
"A % 7 ]
j
Columbia. SC 29218
8
3
Gentlemen:
9
q
Subject: Report No. 50-395/81-18
This refers to the routine safety inspection conducted by Mr. A. B. Ruff of this
office on July 21-24, 1981, of activities authorized by NRC Construction Permit
No. CPPR-94 for the V. C. Summer facility and to the discussion of our findings
held with Mr. O. S. Bradham, Manager Nuclear Operations, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed i
the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
i
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from disclo-
'
sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by
!
telephone within ten days from the date of this letter of your intention to file
!
a request for withholding; and (b) submit within twenty-five days from the date
l
of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven days
are available for
due date may be established.your review, please notify this office promptly so that a new
Consistent with section 2.790(b)(1), such applica-
tion must be accompanied by an affidavit executed by the owner of the information
which identifies the document or part thereof sought to be withheld, and a full
i
statement of the reasons on the basis of which it is claimed that the information
!
should be withheld f rom public disclosure.
This section further requires the
,
statement to address with specificity the considerations listed in 10 CFR 2.790-
( b)( 4 ) .
The information sought to be v.ithheld shall be incorporated as far as
possible into a separate part of the af fidavit.
If we do not hear from you in
this regard within the specified periods noted above, the report will be placed
in the Public Document Room.
i
i
@10909C291 810811
Ogl
e
PDR ADOCK 05000395
O
,
l
,
o
.
,
South Carolina Electric and
gg y y )gg
Gas Company
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
htoi S
P. J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report No. 50-395/81-01
cc w/ enc 1:
J. B. Knotts, Jr.
A. A. Smith, Site QA Coordinator
0. S. Bradham, Manager
Nuclear Operations
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of South Carolina
.
RII
RII
Y -
RII
RII
g4
TEc}onon
j'+k
RII)
/
q
ALVMf:ht
C Murphy
(FGibson
VBrownlee
. Nellogg
<
8/ /81
]/(i /81
/,z/81
Cy /81
$/ *!81
f'f()/81
3
t