ML20010E982

From kanterella
Jump to navigation Jump to search
Forwards LER 81-128/01T-0.Detailed Event Analysis Encl
Date released: 01/24/2020 Download: ML20010E982


LER 81-128/01T-0:on 810817,discovered That Channel Functional Tests of Reactor Trip Instrumentation Were Not Performed Prior to 810814 & 16 Startups.Caused by Personnel Error.Controlling Procedure Modified
ML20010E985
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 08/31/1981
From: Nardoci P
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010E985 (1)
Forwards LER 81-128/01T-0.Detailed Event Analysis Encl
ML20010E981
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 08/31/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010E981 (3)