Forwards IE Insp Rept 50-312/81-24 on 810609-12 & Notice of Violation
ML20010E895
Person / Time
Site: Rancho Seco
Issue date: 08/07/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
Shared Package
ML20010E896 List:
References
NUDOCS 8109090057
Download: ML20010E895 (2)


See also: IR 05000312/1981024

Text

,

\\

f

h"

.s

o,

.y

.

p.

.

.-

,

.

.

AUG

7 1981

Docket No. 50-312

~

g-

h

Sacramento Municipal Utility District

/

P. O. Box 15830

i

SEP 08ggg y .gt

_

,S'Y su % Y

Sacramento, California 95813

Attention: Mr. J. J. Mattinoe

.'

'

-

P

Ass,1sunt General Manager

Gentlemen:

N

N

Sub. ject:

MtC Inspection of Rencho Seco Modifications

This refers to the inspection conducted by Mr. G. Hernandez of this

office on June 9-12, 1981 of activities authorized by NRC License No.

DPR-54, and to the discussion of our findings held by Mr. Hernandez with

Mr. R. J. Rodriguez and other members of your staff at the conclusion of

the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. With'n these areas, the in pection consisted of

selective examinations of procedures and representative records, in-

terviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix A.

,

In accordance with ?S CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

HRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure

under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office

by telephone within ten (10) days from the date of this letter of your

intention to file a request for withholding; and (b) submit within

25 days from the date of this letter a written application to this

office to withhold such infonnation.

If your receipt of this letter has

been delayed such that less than seven (7) days are available for your

review, please notify this office promptly so that a new due date may be

established. Consistent with section 2.790(b)(1), any such application

must be accompanied by an affidavit executed by the owner of the infonnation

which identifies.the document or part sought to be withheld, and which

,

0109090057 810807

'

PDR ADOCK 05000312

$ *1 (

G

PDR

_n

.

.Ry,, ,[ d,',,,,

o "= >

,,,,,,,,

,,,

, ,,,,,

, , ,

, , ,,,, ,, , ,

, , ,,, ,,,,,, ,,

,, ,,,,,, ,,,, ,,,,

, , ,, ,

,,,,

~~>

HEM,,,DEZ/,mp,..#,IS.W,,,,,, F6VI.KENPERRX.

.

. . .. .. .. ..

.... . . .. ... .

..

,. ......... ,,

... . ....,.. ....,

"*>

f.(M./81.... .$./.h.l81

.. 3.l.S(.81

.

......

......

...... ........ ....

. ...... ........

. ..... . .... ...

. . . . . . . . . . . . . . .

.uc roau m no soiucu ouo

OFFICIAL RECORD COPY

^ = " .w32n24

T_

.

4

Sacranento Municipal utility District -/-

' 0 31

contains a full statment of the basis on which it is claimed that the

information should be withheld from public disclosure.

This section

further requires the statement to address with specificity the considerations

1isted in 10 CFR 2.790(b)(4).

The inforriation sought to be withheld

shall be incorporated as far as possible into a separate part of the

a f fidavi t.

If we do not hear from you in this regard within the specified

periods noted above, the report will be placed in the PJbliC doc u"len t

Room.

Shou 1J you have any questions concerning this inspection, we will be

qlad to discuss then wi th you.

Sincerely,

Uriginal signed by

B.

H.

faulkenberry

R.

ii . Faulkenberry, Chief

Reactor Construction Projects

Branch

inclosures:

A.

lotice of Viol <stion - Appendix A

B.

IL Inspection Report

10. 5J-312/81-24

cc w/o enclosure 9:

R.

J. Ro iriyaez, SMUD

L.

G.

Schwieger, sMUD

Nent ta UMB for DC5 processing

Distribated by PV:

RV Pl)R

ingelken (Itr)

Resident Inspector (3)

State of I;A (Hahn/ Johnson)

_