05000327/LER-1981-099, Forwards LER 81-099/03L-0

From kanterella
(Redirected from ML20010E742)
Jump to navigation Jump to search
Forwards LER 81-099/03L-0
ML20010E742
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 08/27/1981
From: Green H
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20010E743 List:
References
NUDOCS 8109080213
Download: ML20010E742 (1)


LER-1981-099, Forwards LER 81-099/03L-0
Event date:
Report date:
3271981099R00 - NRC Website

text

_

4 TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374o1 1750 Chestnut Street Tower II

'Q*Y August 27, 1981 7 u^ 3\\

- m g

g\\ O' I /9,,

t [h

i L

' ).

Mr. James P. O'Reilly, Director 9

U.S. Nuclear Regulatory Commission l'

Office of Inspection and Enforcement

,T sEi 01 ggg r Region II~

9" c

l lQ Marietta Street, Suite 3100 y,s.iagng# -

Atuata, Georgia 30303

,4. /

g N-js

Dear Mr. O'Reilly:

,q

(

\\

TENNESSEE VALLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT UNIT 1 - DOCAET NO. 50-327 - FACILITY OPERATING LICENSE DPR REPORTABLE OCCURRENCE REPORT SQRO-50-327/81099 The enclosed' report provides details concerning failure to perform surveillance tests on two residual heat removal check valves within the 92-day time requirement. This report is submitted in accordance with Sequoyah unit 1 Technical Specification 6.9.1.13.c.

.Very truly yours, TENNESSEE VALLEY AUTHORITY

. J. Gre n irector of Nu lear Power Enclosure (3) cc (Enclosure):

Director (3)

Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 Director _ (40)

$M Office of Inspection and Enforcement J

U.S. Nuclear-Regulatory Commission Washington, DC 20555

//

Mr. Bill Lavallee Nuclear Safety Analysis Center Palo Alto, California 94303 NRC Inspector, Sequoyah 8109080213 810827 PDR ADOCK 05000327 S

PDR An Equal Opportunity Employer