Forwards IE Insp Repts 50-361/81-14 & 50-362/81-03 on 810616-19.No Noncompliance Noted
ML20010E085
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 08/14/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20010E086 List:
References
NUDOCS 8109030055
Download: ML20010E085 (2)


See also: IR 05000361/1981014

Text

-

-

-

-

.

a.

4

,

g

~ ~

t-

s

.

ADG 1+ Wsl

e \\ &';

Docket tros. 50-361, 50-362

-

t

P 02193;w $2

Southern California Edison Company

' M % murea [C

P. O. Box 800

"**

C,

2244 Walnut Grove Avenue

2

g

Rosemead, California 91770

W I

Attention: Dr. L. T. Papay, Vice President

Advanced engineering

Gentlenen:

Subject:

NRC Inspection at San Onofre Units 2/3

This refers to the inspection conducted by fir. J. H. Eckhardt of this

office on June 16-19, 1981 of activities authorized by NRC Construction

Permit Nos. CPPR-97 and 98, and to the discu:sfon of our findin9s held

by ffr. Eckhardt with Mr. D. E. Nunn and other members of your staff at

the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any infomation that

you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within ten (10) days from the date of this letter of your intention to

file a request for withholding; and (b) submit within 25 days from the

date of this letter a written application to this office to withhold

(g[

such infomation.

If your receipt of this letter has been delayed such

If

g[/[

that less than seven (7) days are available for your review, please

notify this office promptly so that a new due date may be established.

Consistent with section 2.790(b)(1), any such application must be accompanied

cre cry Ry rNfl

$

' 1,

,

ECKWADT/jk

'FAUL

SERRY'

, _ [7 iW M 81' T, % BISFO

ununc

' erg 081

,,.,,

8109030055 810814

.

.. ..

$hk

OFFICIAL RECORD COPY

    • c w+-m m

.

.

_t

P'

. . . .

,

Southern California Edison Conpany

-2-

ndG 141331

by an affidavit executed by the owner of the infernation which identifies

the docunent or part sought to be withheld, and which contains a full

statenent of the basis on which it is clained that the infornation

should be withheld fron public disclosure.

This section further requires

the statement to address with specificity the considerations listed in

19 CFR 2.790(b)(4).

The information sought to be withheld shall be

incoporated as far as possible into a separate part of the affidavit.

If we do not hear fron you in this regard with the specified periods

noted above, the report will be placed in the Public Document Roon.

Should you have any questions concerning this inspection, we will be

glad to discuss then with you.

Sincerely,

9.

p.

A vJ n e w be r ry

B. H. Faulkenberry, Chief

Reactor Construction Projects Branch

Enclosure:

IE Inspection Report

Mos. 50-361/81-14

50-362/81-03

cc v/o enclosure:

R. Dietch, Vice President

nuclear Engineering & Operations, SCE

Sent to D"B for DCS Processing

Distributed by RV:

State of CA (Hahn/Johnsnn)

R\\ PDR

Resident Inspector

Engelken (ltr)

Bob Pate (50-3C1/80-24

Al Johnson (50-361/80-24)

. _ _

- . . . .