Order Extending Latest Completion Date for CPPR-99 to 820430.Good Cause Has Been Shown for Delay & Extension Is for Reasonable Period
ML20010D712
Person / Time
Site: LaSalle 
Issue date: 08/03/1981
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
COMMONWEALTH EDISON CO.
Shared Package
ML20010D713 List:
References
NUDOCS 8108310052
Download: ML20010D712 (3)


Text

e 6

C0ilM0 WEALTH EUJR CollPANY LA SALLE COUNTY STATION, UNIT H0. 1 00CKLT NO. 50-373 ORDER EXTEhDING CONSTRUCTION C0!!PLETION DATE Comonwealth Edison Company is the holder of Provisional Construction Pernit NJ. CPPR99, issued by the Atomic Energy Comission* on September 10, 1973 for construction of La Salle County Station Unit No.1.

The plant is presently under construction at a site located in the agricultural area of Brookfield Township, La Salle County, approximately five miles south-southwest of Seneca, Illinois.

On lic 20,1981, the applicant requested an extension of the latest comple-tion date because construction has been delayed by the follcwing events:

1.

Design verification of piping supports as required by NRC Office of Inspection and Enforcement Bulletin 79-14 entitled, " Seismic Analyses t

for As-built Safety-Related Piping Systems 2.

Acconmodation of additional URC criteria related to preoperational testing in numerous areas including vibration ryndtoring, leak rate testing and electrical system load verification 3.

Potential construction schedule delays resulting from unforeseen

)

equipment delivery difficulties which could affect critical path preoperational testing

  • Effective January 19, 1975, th(

egulatory functions of the Atomic Energy Commission were assumed by the en lear Regulatory Comission and permits in ef fect on that day were continued under the authority of the Nuclear Regulatory ComiTTTon.

omcr >l;,

sua"^"i 8108310052 810803 PDR ADOCK 05000373 A.

POR I

.I..

Nac rosu ais.io.o nacu ore OFFICIAL RECORD COPY

""""-3'""

4.

encertainty attriautable to potential expansion of MC require'.ents 7'yan.1 that presently identified in the La Salle County Station S3 fety i

l Lv al uatian hepart, "U.Ei-0319 dated Hsrch 1931. Augaentation of j

re julatory guidance in nany areas could potentially affect construction I

i l

ca ipl eti on.

This is substantiated by recent experience on operating licenses issued since :hrch 197S ahere acknowleiged delays were reported I

i Sy the !..iG on license applications.

I l

l T11s action involves no significant hazards cons 1<ieration; good cause has

een shawn for tnc delays; and the requested extension is for a reasonable J

peri od.

T1e Co.uission has deteraf aed that this action will not result in any significant environ tental iapact and, pursuant to 10 CFR tJil.5(d)(1), an environ-acatal ia,sact state 1ent, or negative declaration and enviroiraental inpact dppr3iSJI, UC* d nJt be preparea in connection with t9f s action.

Tne C.C st cf evaluation of the request for extension of the construction

>erait is available for public inspection at the Co.uission*s Public Docuaent l

l daom, 1717 H Stt'eet, ii.

W., 'hshington, D. C. 20555, and at +.he felic Library of f

Illinois Valley Comunii; Colloje, Rural Route No.1, Oglesby, Illinois.

IT IS HEdoY ORDtRED liiAT the latest conpletion date for Construction Pernit

.o. CPPi-% is extended fro'i June 30, 1931 to April 30, 1932.

FOR ThE '40 CLEAR JEGULATORY CUT 11SS10d Originni signedD7 -

porrell G. Eiaonhun Udere11 c. Eisenhut, nirector Division of Licensing Of fice of Nuclear Reactor P.egulation f: ate of Issuance: g3 gg

kh Q

p en 4.

Uncertainty attributable to potential expansion of HRC requirements beyond that presently identified in the La Salle County Station S ety Evaluation Report, HUREG-0519 dated tiarch 1981. Augmentation f regulatory guidance in many areas could potentially affec ' construction completion. This is substantiated by recent experienc on operating licenses issued since !! arch 1978 where acknowledge delays were reported by the HRC on license applications.

This acticn involves no significant hazards onsiderattori; good cause has been shown for the delays; and the requested e tension is for a reasonable period, the bases for which are set forth the staf f's evaluation of the request for extension.

)

The Commission has determined at this action will not result in any significant environrnental impact nd, pursuant to 10 CFR $51.5(d)(4), an environ-mental impact statement, or gative declaration and environmental i;npact appraisal, need not be pr ared in connection with this action.

The HRC staff eva ation of the request for exteraton of the construction permit is available or public inspection at the Comnission's Public Document Room, 1717 H Str

, N. W., Washington, D. C. 20555, and at the Public Library of Illinois Vall y Comunity College, Rural Route No.1, Oglesby, Illinois.

1 IT IS IlEREBY ORDERED THAT the latest coupletion date for Constructhn Pernit No. CPP'-99 is extended from June 30, 1981 to April 30, 1982.

FOR THE NUCLEAR REGULATORY C01711SSION Darrell G. Eisenhut, Director

[j Division of Licensing

.s 7

j.Q %.i/

Office of Nuclear Reactor Reguldtion

. :L..... 6NL,;

h

.0L;

"'c'> SL%..# I T U.E..........0L:LB M..... OE LO...h'a dD...

( = aar) ABouknda:ph MSer e

ASchwe c CWoodh'e RIe sco DE

............. /b h

[81 o u) [ d......[.8.1[

../.81 7[

.... /. p...../ 81 7/

/81 7/

..............i.........

mac r nu ais oo soinacu o24o OFFICIAL RECORD COPY mm

-32n24 j e