ML20010D236

From kanterella
Jump to navigation Jump to search
Forwards LER 81-015/01T-0.Detailed Event Analysis Encl
Date released: 01/24/2020 Download: ML20010D236


LER 81-015/01T-0:on 810720,while Attempting to Perform Engineered Safeguard Periodic Test,Low Pressure Injection Pump 3-B Failed to Start.Caused by Personnel Error.Pump Motor Bearings Replaced & Personnel Counseled
ML20010D237
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 08/17/1981
From: Jackie Jones
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010D237 (1)
Forwards LER 81-015/01T-0.Detailed Event Analysis Encl
ML20010D235
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 08/17/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010D235 (2)