OPERATING DATA REPORT DOCKET NO. 50-36'.
DATE 3 /1/ M COMPLETED BY k*/; MWston, III 1
TELEF110NE (205)699-5156
]_.
OPERATING STATUS
- 1. Unit Name:
Joseph M. Farley - Unit 2 Notes: : 1) Joseph M. Farley
- 2. Reporting Period:
July, 1981 Nuclear Plant Unit 2 vent
- 3. Licensed Thermal Power (MWr):
2652 into commercial operation on j
- 4. Nameplate Rating (Gross MWe):
860 July 30, 1981.
- 5. Design Electrical Hating (Net MWe):
829
- 6. Maximum Dependable Capacity (Gross MWe):
860*
- 7. Maximum Dependable Capacity (Net MWe):
829*
- 8. If Changes Occur in Capacity Ratings (items Nun'ber 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To which Restricted.lf Any(Net MWe):
N/A
- 10. Reasons For Restrictions,If Any:
N/A k
This Month Yr.-to-Date Cu'mulatise
!I. Ilours In Reporting Period 744 1,610.2 1 610.2
- 12. Number OfIlours Reactor Was Critical 426.7 1,108.2 1,a 3.2
- 13. Reactor Reserve Shutdown llours 317.3 528.8 528.8 14, flours Generator On-Line 398.7 759.2 759.2
- 15. Unit Rewne Shutdown ilours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 839,252.7 1,257,899.4 1,257,899.4
- 17. Gross Electrical Energy Generated (MWil) 264.338 ___,_,
359,618 359,618
- 18. Net Electrical Energy Generated (MWH) 239,070 311,226 311,226
- 19. Unit Senice Factor 100.0 100.0 100.0
- 20. Unit Availability Factor 100.0 100.0 100.0
- 21. Unit Capacity Factor IUsing MDC Net) 41 ?
01.2 91,2
- 22. Unit Capacity Factor (Using DER Net) 91.2 91.2 91.2
- 23. Unit Forced Outage Rate 00.0 00.0 00.0
- 24. Shutdowns Scheduled Oier Next 6 Months (Type.Date.and Duration of Each):
N/A
- 25. If Shot le..n At End Of Report Period. Estimated Date of Startup: N/A'
- 26. Units in.est Status (Prior to Commercial Operation):
Forecast Achiesed f310:240090 810817 PDR ADOCK 05000364 NITI \\ L CRITICALITY
'i /6 /8_1 3/8/81 R
PDR INITIAL ELECTRICITY 5/24/81 5/25/81 COMMERCI AL OPER ATION 8/1/81 7!30/81
- The Nameplate Rating / Design Electrical. Rating will be used for the Maxinus Dependable Capacity until an accurate value can be determined from operating
.i experience.
em7:
- Items calculated from July 30, 1981, date of commercial operation.
_ _ _, _., - ~
e AY. ERAGE DAILY UNITPOWER LEVEL
[
- ,s-DOCKETNO. 50-364 h
2 1
UNIT DATE 8/l/81 COMPLETED BY W.G.Hairston,III
/
TELEPHONE. (205)899-5156 MONTH July, 1981 DAY AVERAGE DAILY POWER LEVEL
- DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe. Net) 788 -
g, 37 2
-O' 539 jg gg.
3
-0 C
4 _ !.:
20 228 5 -
- ~
21 6
92 307 g
7 590- -
23 m,
. (-.(
g 580 ~
^
.j, 4
9 574
~-
25 -
10 579 -
.,j, Ig 350 183
'f"
~
\\
l 12 335
.. f,,s 442-c-
637 592 j3 3
14 641 757 30
~
756 IS 537
- 33 712 16
>+"
INSTRUCTIONS
~
~
On this formst.!ist the ave.sge daily unit power levelin MWe-Net for each day in the reporting mon:5. Compute to the nestest whole megsw it.
J
'.e (9(77) i l
t
i
' % (-
A A.
A UNITS!!UTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNIT NA%fE J.M.Farlev-Unit 2 DATE 8/1/81 REPORT.\\f 0NTI! Julv. 1981 CO\\tPLETED BY E C ue stm. TII i
IELEPl!ONE (2051899-5156 1
1
.3 =c
=
en 5
.E _e 75'4 Licensee
=.r c%
Cause & Corrective i
No.
Date g
3g g
_g g 5 Event u?
o E-3 Action to
$E E
j5 RCPort =
rN G U
Prevent Recurrence C
4 Continued Phase III Testing at vari-ous reactor power levels.
013 810701 S
134.9 H
1 N/A CI HTEXCH Unit outage centinued from 6/22/81 1
to repair a tube leak on S/G 2A.
014 810711 F
8.8 A
3 N/A HH VALVEX Reactor Trip-Turbine Trip on S/G 2B High-High icyc1 due to S/G 2B feed regulating valve nalfunction during Phase III 50% Load Rejection Test.
015 810714 F
6.9 H
3 N/A HA ZZZZZZ Reactor Trip-Turbine Trip due to high.
main generator hydrogen temperature.
3 015 810718 S
66.3 B
1 N/A HA ZZZZZZ Reactor Trip-Turbine Trip due to l
Phase III Test, Manual Turbine Trip from 100% power.
Commenced outage to recalibrate all steam flow / feed flov transnitter s and repair transmitter vent..in e s.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A. Equipment Failure (Explain) 141anual for Pseparation of Data II. Maintenance or Test 2-M in ual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction
-t-Other (Esplain) 0161)
E-Operator Train ng & License Examination i
F Administrative 5
G O vrational Error (Explain) i (9/77)
Il-OLher (Explain)
Exhibit I Same Source
O A.g A
z DOCKET NO. 50-364 UNIT S!!UIDOWNS AND POWER REDUCI10NS UNIT NAME J.M,Faricy-Unit 2 DATE 8/1/8L REPORT MONTil _ July, 1981 COMPLETED BY W.G.llairston, III TELEPifONE (205) 899-5156 i
~
T 5"
=
c.
3=
.E e E
- >.5 M Licensee g%
Cause & Correstive c
8 ".
Date g
g g
jg5 Event u?
Action to c$ E 5
j di g Report u N0 Pr* vent Recurrence d
017 810722 F
4.8 G
3 N/A UA INSTRU Reactor Trip-Turbine Trip due to shorting of test leads in parallel with manual Turbine trip switch.
018 810722 S
113.7 B
1 N/A HA ZZZZZZ Reactor Trip-Turbine Trip as part of Phase III testing program. Commenced
=a!.ntenance outage.
019 810727 F
0.6 A
4 N/A HH INSTRU Turbine Trip due to S/G 2A High-High level. Main feed pump contr.1 prob-lems.
020 810727 F
0.8 A
4 N/A HH INSTRU Turbine Trip due to S/G 2A High-High level. Main feed pu=p control prob-lems.
l i
2 3
4 F: Forced Reason:
Method:
Exhibit G. Instructions 5: Scheduled A-Equipment Failure (Explain)
I-Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram.
Entry Sheets for Licenace C Refueling 3-Automatic Scram.
Event Report (LER) File (NURl!G.
D Regulatory Restriction 4-Other (Explain) 0161)
I!-Operator Training & l.iceme lixamination F-Admini:,t rative 5
G-Operational lis tor (IIxplain)
Exhibit I Same Source (9/77)
Il-Other (Explain)
i i
~
O O.
i UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNIT NAME J.M.Farley-Unit 2 DATE - 8/1/81 REPORTMONTH ulv. 1981 COMPLETED BY W.C.Mairsten. III J
TELEPitONE (205)899-515o l
3 e,
.5 -x =
e*
.=E r
,.s ~4 Licensee g *r.
Cause & Corr:ctive c
o o
No.
Date g
3g i;
jg5 Event u2
$.?
Action to H
g$ ~
j di g Report :
viC
]O Prevent Recurrence 6
021 310728 F
2.6 B
3 N/A HH INSTRJ Reactor Trip-Turbine Trip due to S/G 2A Low -Low level while perfom-ing Phase III 100% Pcwer Load Swing Test.
022 310728 F
5.9 B
3 N/A HH INSTRU Reactor Trip-Turbine Trip due to Low-Low L/G 1evels in all S/G's while perfoming Phase III 50%
Load Rejection Test.
f
- Unit 2 declared com::tercial at 1
0001 on July 30, 1981.
l l
5 I
2 3
l I;; l'orced Reamn:
Methoti:
Exhitut G Inst:uctions S: Stheduled A Inguipn.cnt l'ailure (Explain) l4tannal for Pieparation of Daia ll41aintenance of Test 241 annal Sesam.
Entsy Shetts foi I.ieemee C Refueling 3 Automatic Scram.
Event Report (f.ER) liite (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
I. Operatur Tsaining & !.icense Examination F-Administ rative 5
G-O srational lit tor (Explain)
Exhibit 1 Same Source i
(')/77)
Il-Other (Expbin) q I