Forwards Monthly Operating Rept for Jul 1981
ML20010D188
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/17/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20010D189 List:
References
NUDOCS 8108240087
Download: ML20010D188 (2)


Text

- _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ - _ _ - _ - _.

Mdling Address Alabama Power Company 600 fJorth 18th Street Post Off.co Dox 2641 Dirmingham, Alabama 35291 A

Telephone 205 783-6081 F. L. Clayton, Jr.

Senior Vice President Mahanla PO\\VCf Flintndge Building the sottten Actric system August 17,1981 Docket No. 50-364 6\\

N' Director, Office of Management

\\.

'\\

Information and Program Control 6

toy ]I U. S. Nuclear Regulatory Commission

' 6 c' o 1 l.; vis. @ g 5"'*** f}

Washington, D.C.

20555 S

g

Dear Sir:

/>..

43,/

q-v./

RE: Joseph M. Farley Nuclear Plant C_

Unit No. 2 Monthly 0 trating Data Report g

Attached are two (2) copies of the July,19J1 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, as required by Section 6.9.1.10 of the Unit 2 Technical Specifications. As requested by letter from Mr.

John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very truly, F.k L. Clayton, r.

FLCJr/ HOT:nac Attachments xc: Mr. Ted Cintula (1 copy)

' Director, IE'(10 copies)

Director, RII (1 copy)

T8N J

//l NM 0108240087 810817 PDR ADOCK 05000364 R

PDR

l JOSEPli 11. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE SUtt!ARY OF OPERATIONS JULY, 1981 The Joseph ?!. Farley Nuclear Plant, Unit 2, went into cccmercial operation on July 30, 1981.

Phase III Power Ascension Testing is complete.