Forwards IE Insp Repts 50-295/81-16 & 50-304/81-12 on 810728-30.No Noncompliance Noted
ML20010D086
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 08/10/1981
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20010D087 List:
References
NUDOCS 8108210451
Download: ML20010D086 (2)


See also: IR 05000295/1981016

Text

F

7

,

.

e

August 10, 1981

l

l

4

l

Docket No. 50-295

S

l

Docket No. 50-304

<

>

C

-l

I

Commonwealth Edison Company

~

,-

A Ui 20198I

i

~

ATTN:

Mr. Cordell Reed

y

Vice President

V1

YM3 $" " 7

"

Post Office Box 767

<{

,

Chicago, IL 60G0

gd{'

f l

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

M. P. Phillips and P. R. Wohld of this office on July 28-30, 1981, of ac-

tivities at the Zion Nuclear Genrrating Station, Units 1 and 2, authorized

by NRC Operating Licenses No. DPR-39

.d No. DPR-48, and to the discussion

j

of our findings with Messrs. F. Palmer, K. Grzesser, and others of your

j

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

As was discussed at the exit interview, we are concerned about the space

l

provided in the permanent TSC and interim EOF.

Based upon NRC participa-

l

tion in this exercise, it is apparent that the currer, space utilization

j

of the permanent TSC does not meet. the regulatory criteria specified in

'

NUREG-0696. This matter will be reviewed for further adion by the NRC

lieadquarters Emergency Preparedness Development Branch.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document P.oom.

If this report contains any information that you or

ynir contractors belf eve to be cempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

l

f6CN

>

II

l

8108210451 810810 ?

PDR ADOCK 05000295

Q

PDR,

L.

.'

l

Commonwealth Edison Company

-2-

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons which are the bases for the claim that the

information should be withheld from public disclosure.

This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in thi= regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

k

. A. Ilind, Director

Division of Emergenc3 Preparedness

and Operational Support

Enclosure:

IE Inspection

Reports No. 50-295/81-16

and No. 50-304/81-12

cc w/ encl:

I,ouis 0. DelGeorge

Director of Nuclear

Licensing

K. Graesser, Station

Superintendent

Dr!B/ Document Control Desk (RIDS)

Resident Inspector, Rill

flary Jo Hurray, Office of

Assistant Attorney General

'III

IIT

{II

RIII

RIII

,' lg

G-

OU/$

Pa e}r'el;1o

'

/so

11(

el on

Imi

llayes

r

$ c gf

/

fj}olgt

8/7/81

f