Forwards IE Insp Repts 50-440/81-12 & 50-441/81-12 on 810706-08.No Noncompliance Noted
ML20010C307
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 08/06/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20010C308 List:
References
NUDOCS 8108190337
Download: ML20010C307 (2)


See also: IR 05000440/1981012

Text

i

i

.

AUG

6 1981

Docket No. 50-440

Docket No. 50-441

The Cleveland Electric Illuminating

Company

ATTN: Dalwyn R. Davidson

Vice President - System

Engineering and Construction

Post Office Box 5000

Cleveland, OH 46101

Gentlemen:

This refers to the routice safety inspection conducted by Mr. M. L. Gildner

of this office on July 6-8, 1981, of activities at Perry Nuclear Power Plant,

Units 1 and 2, authc. zed by NRC Construction Permit No. CPPR-148 and No.

CPPR-149 ano to the discussion of our findings with Mr. M. R. Edelman at

the conclussort of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report conteins any information that you or

your contractors believe to be exempt from disclosure. under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of yout intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation.

Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by t

dr,cf the information which

.9

~

'c.

o

7hD[

p

1r

.

/f

o

d'

D

b

$>

n/ty

,

__

C1081'?O337 010GO6

PDR ADOCK 05000440

,

PDR

o,

4

,

The Cleveland Electric Illuminiating - 2 -

6198f

J

Company

identifies the docu;nent or p;rt sought to be withheld, and which contains

a full statement of the reasons on the basis which it is claimed that the

information should be oithheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear froir you in this regard within the specified periods noted

above, a copy of thfa letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss eny questions you have cuncerning this inspecticn.

Sincerely,

$, $ .

OL W

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

Enclosure:

IE In.pect:'.on

Report No. 50-440/81-12 and

No. 50-441/81-12

cc w/ encl:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Power

Siting Commission

Daniel D. Wilt, Attorney

Helen W. Evans, State of Ohio

RIII

RIII

RIII

RII

RIII

i ner/jp

B

d-

Nr

un

8 /81

g*[/,'g

$T

J