ML20010C307
| ML20010C307 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 08/06/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Davidson D CLEVELAND ELECTRIC ILLUMINATING CO. |
| Shared Package | |
| ML20010C308 | List: |
| References | |
| NUDOCS 8108190337 | |
| Download: ML20010C307 (2) | |
See also: IR 05000440/1981012
Text
i
i
.
AUG
6 1981
Docket No. 50-440
Docket No. 50-441
The Cleveland Electric Illuminating
Company
ATTN: Dalwyn R. Davidson
Vice President - System
Engineering and Construction
Post Office Box 5000
Cleveland, OH 46101
Gentlemen:
This refers to the routice safety inspection conducted by Mr. M. L. Gildner
of this office on July 6-8, 1981, of activities at Perry Nuclear Power Plant,
Units 1 and 2, authc. zed by NRC Construction Permit No. CPPR-148 and No.
CPPR-149 ano to the discussion of our findings with Mr. M. R. Edelman at
the conclussort of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report conteins any information that you or
your contractors believe to be exempt from disclosure. under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter of yout intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
mation.
Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by t
dr,cf the information which
.9
~
'c.
o
7hD[
p
1r
.
/f
o
d'
D
b
$>
n/ty
,
__
C1081'?O337 010GO6
PDR ADOCK 05000440
,
o,
4
,
The Cleveland Electric Illuminiating - 2 -
6198f
J
Company
identifies the docu;nent or p;rt sought to be withheld, and which contains
a full statement of the reasons on the basis which it is claimed that the
information should be oithheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
we do not hear froir you in this regard within the specified periods noted
above, a copy of thfa letter and the enclosed inspection report will be
placed in the Public Document Room.
We will gladly discuss eny questions you have cuncerning this inspecticn.
Sincerely,
$, $ .
OL W
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
Enclosure:
IE In.pect:'.on
Report No. 50-440/81-12 and
No. 50-441/81-12
cc w/ encl:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Harold W. Kohn, Power
Siting Commission
Daniel D. Wilt, Attorney
Helen W. Evans, State of Ohio
RIII
RIII
RIII
RII
RIII
i ner/jp
B
d-
Nr
un
8 /81
g*[/,'g
$T
J