Forwards IE Insp Rept 50-382/81-18 on 810616-0715 & Notice of Violation
ML20010C275
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/31/1981
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Maurin L
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20010C276 List:
References
NUDOCS 8108190305
Download: ML20010C275 (2)


See also: IR 05000382/1981018

Text

.

,

Jul. 3 1 1384

'

In Repl Refer To:

m i co

Docket

. 50-382/81-18

i

,g

'

g

E

W

Louisiana Power and Light Company

-hg

1

--

ATTN:

L. V. Maurin, Assistant Vice

p

hy.1

.!I

-

President-Nuclear Operations

142 Delaronde Street

'

New Orleans, Louisiana

70174

<% l T5

Gentlemen:

,

This refers to the inspection conducted under the Resident Inspection Program

by Messrs. J. E. Cummins and G. L. Constable of our staff during the period

June 16 - July 15, 1981 of activities authorized by HRC Construction Permit

No. CPPR-103 for Waterford Steam Electric Station, Unit No. 3, and to the

discussion of the findings with Mr. D. B. Lester and other members of your

staff at various times during the inspection.

Principal areas examined during the inspection and our findings are discussed

in the enclosed inspection report. Within these areas, the inspection consisted

of selective examination of procedures . drawings, representative records,

interviews with personnel and obrarvations by the NRC inspectors.

During this inspection it was found that certain of your activities were not

conducted in full compliance with NRC requirements. Based on your prtmpt

corrective action and planned followup, you are not required to formally

respond to these items of noncompliance.

The details are contained in the

.

Notice of Violatica and the inspection report enclosed with this letter.

.

In accordance with 10 CFR 2.790 of the Coannission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you

.'

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

'

that you (a) notify this office by telephone within 10 days from the date of

this letter of your intention to file a request for withholding; and (b) sub-

mit within 25 days from the date of this letter a written application to this

j

1

office to withhold such information.

If your receipt of this letter has been

delayed such that less than seven days are available for your review, please gpl

notify this office promptly so that a new due date may be established.

.s

Consistent with Section 2.790(b)(1), any such application must be accompanied

by an affidavit executed by the owner of the information which identifies the

//

document or part sought to be withheld, and which contains a full statement

-

of the reasons on the basis which it is claimed that the information should be

withheld from public disclosure. This section further requires the statement

I

.to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

,

8108190305 810731

PDR ADOCK 05000382

~

!

O

PDR

A

4

m+. .W!)/.R.PS 1, , , ,

. . . .R,P S.1,

....,MBp

.,.g..,...

9

. 0tJ9.d se.n. . . .

AGid.fardo.. [..DW....

,.

- . . - . . . . . . - .

. - . . . - . . -

==ht.C mtAt; lAn...TRes.terss....!!.9!.81......

..!!M81....

.!!. .W.81. .

]!EG1.....

o1.1.t os . . .

..

..... ..........

........ .....

""7!2!!.81 :..

..

.

...

-.. ~.. ....

...- .-.. ....

~ec , no.

.s ~ac om

oggiciat accoao copy

_

__ _

.

.

.

,

_.

,

Louisiana Power and Light Company

2

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, the report will be placed in

the Public Document Room.

'

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

P'Q7[g n g g;gn g g

G.

L'. MAosErra

G. L. Hadsen, Chief

Reactor Projects Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

IE Inspection Report No. 50-332/81-1a

cc: Louisiana Power and Light Company

Waterford-3

4TTN:

D. B. Lester, Plant Manager

P. O. Box B-Killona

Taft, Louisiana

70066

bcc to DMB:(IE01)

bcc distrib. by RIV: kUN#

BC

g/jg/f/

P.ESIDENT INSPECTOR

PM

38

SECTIONS CHIEFS #1 & #3

AE0D

INFO SYSTEMS

ELD

TIB~

IE FILE

ElB

IE/RPRIB

NRR/DHFS

Louisiana Div. of Rad.

NRR/0LS

Control

RAD ASMT 3R

J. Gagliardo, RIV

RESEARCH

PDR:HQ

LPDR

NSIC

_

' " " >

.... ..... . ......

.

.... ......

.. . . ...

. ..

..

.. .. .

.

. ..

.

..

... .. .

' " " ~ ' " ' > ........ . . ....

.

.. . .... .

.

...... . ..

.

. .

. . .

.

... ..

... .. . ... ...

" * " >

............ .....

.. .... ... ....

......... .. ... ...

..

. . .... ..

..

. ..

.

.. . . . . . . . . . .

... ...

. . . . .

anc ,om ,i. , io .oi sac"

OFFICIAL RECORD COPY