ML20010B454

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1981
ML20010B454
Person / Time
Site: Palisades 
Issue date: 08/03/1981
From: Peterson D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18046A870 List:
References
NUDOCS 8108140488
Download: ML20010B454 (4)


Text

OPERATING DATA REPORT DOCKET NO. 50-255 E 3-61 DATE CO31PLETED BY TW)at a-n TELEPHONE (61 6) 76h-8913 OPERATING STATUS Palisades Notes

1. Unit Name:
2. Reporting Period:

A10701 810791

3. Licensed Thermal Power (MWt):

2530

4. Nameplate Rating (Gross MWe):

811.7 806

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
  • 67s
7. Maximum Dependable Capacity (Net MWe):
  • 635 a
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report. Gise Reasons:
9. Power Lesel To Which Restricted,If Any (Net MWe):

l

10. Reasons For Restrictions,If Any:

b i

This Month Yr..to.Dat e Cumulative

11. Hours in Reporting Period Thh snR7 84.302 2bI*2 h566.6 h8.092.0
12. Number Of Hours Reactor Was Critical
13. Reactor Resene Shutdown Hours
14. Hours Generator On.Line 2h7 o h561 9 h5,755.h

' 15. Unit Reserve Shutdown Hours

16. Gross Thermal Energy Generated (MWH; 60h.hh0 10_856_796 90_s60,h79
17. Gross Electrical Energy Generated (MWH) 190.310 3.40s.390 27.969.800
18. Net Electrical Energy Generated (MWH) 179,924 3.223.921 26,27h.225

. il

19. Unit Senice Factor 72.9 89 7 54.2
20. Unit Asailability Factor 33.2 89.7 54.2

-t

21. Unit Capacity Factor (Using MDC Net) 38.1 99.8 49 1 r
22. Unit Capacity Factor (Using DER Net) 30.0' 78.7 38.7'
23. Unit Forced Outage Rate 66.8 10.2 33.1

.[

24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each):

I Refueling Outage, 8/29/81, 3 months

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

O/9/01

~

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIA L CRITICALITY INITIA L ELECTklCITY COMMERCIAL OPER ATION

'8108140488 81 gDRADOCK0500 55 DR i

=

AVERAGE DAILY UNIT POWER LEVEL COCKET NO. _50-255 UNIT Palisades DATE 8-3-81 COMPLETED BY napo+,rnnn TELEPHONE _(616)76h_8913 Af0 NTH July 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M We-Net)

(MWe-Net) 743 37 2

7hp

.I8 3

753 19 Th3 4

20 Th1 5

21 6~

7h1 22 7

736 23

3 729 24 9

790 25 10 Thl 26 1i 95 27 12 2S 13

-~

29 14 30 15 31

_16 INSTRUCTIONS On this format. list the average daily unit power levelin Mwe. Net for cach day in the reporting month. Compute :o the nearest whole mepawatt, (9/77)

  • w..+

g

UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-255

. UNIT NAME hl i n n hn DATE A-3 A7 COMPLETED llY DA% terson REPORT MONTil.Tuly lor 1 TELEPilONE (6161 76h 8013.

i "E

re 5 -a :

6

.=2 E

3.s a Licensee g *,

c ".

Cause & Correceive e

$.3 Action to No.

Date g

g i;

jg5 Event

-o

$3 5

j15j ReporI#

N0 y'

Prevent Recurrence 5

5 810711 F

497 A

1 Primary Coolant Pump Seal Failure I

4 6.

i 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions 5: Scheduled A. Equipment Failure (Explain) 1-Manual for Picparation of Data ll Maintenance of Test 2 Manual Scram.

Entey Sheets for 1.ieensee C-Refueling.

3-Automatic Scram.

Event Report (LERI Fde (NUREG-D Regulatory Rest:iction 4-01her (Explain) 0161i E Operator Training & License Examination F-Administ rative 5

G-Operational Ern.r (Explain)

Exhibii 1 - Same Source

.W/77)

Il-Other (E xplain) s

SUMMARY

OF OPERATING EXPERIENCE FOR JULY 1981 The plant operated at near full power for the first 10 days of the month.

On July 11, the plant was shutdown to perform maintenance on Primary coolant pump and control rod drive seals. The plant remained shutdown-for the rest of the month.

l l

l I

-.