ML18046A869

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Jul 1981
ML18046A869
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/03/1981
From: Kennedy D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML18046A870 List:
References
NUDOCS 8108140486
Download: ML18046A869 (5)


Text

Palisades Nuclear Plant: Route 2, Box 154, Covert, Ml 49043 August 3, 1981 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50~255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the Month of July 1981.*

~J)~&J/7?.~7*

DMKennedy General Engineer CC: *. JGKeppler, USNRC KWBerry, P24-207A DPHoffman, P24-115 GHRPeti tjean, Palisa.des *

.Resident Inspector, Palisades JJDellas, Pll-228B LTPhillips., P21-327 DEVanFarowe, Div of Radiological Health Lansing, Michigan SMierzwa, Michigan Dept of Labor.

RCallen, Michigan Public Service Commission BLavallee, NSAG Document Control (2) 950*22*35*10/L 8109140486 810803 PDR ADOCK 05000255 R

PDR

OPERA TING DATA REPORT OPERA TING STATUS

1. Unit Name:

Palisades

2. Reporting Period:

---'8...._1.._ol.L..j...7..,o_._1=-... 8..... 1...

0_,_7_.3_,_1 ________ _

3. Licensed Thermal Power (MWt):

-=2~5_3=0 ________ _

4. Nameplate Rating (Gross MWe):. -"""8.;::l=l=-.=.-'7 _______ _

806

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross.\\!We):
  • 675 i..\\1aximum Dependable Capacity (Net ~!We):
  • 635
  • Notes DOCKET ~O.

DATE cmlPLETED BY TELEPHONE 50-255 8-3-81.

DAPet.erson (616) 764-8913

8. *If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To. Which Restricted, If Any (Net MWe):

I 0. Reasons For Restrictions, If Any:

  • 11. Hours In Reporting Period
  • 12. Number Of Hours Reactor Was Critical.
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. l.init Reserve Shutdown Hours.
16. Gross Thermal Energy Generated (MWH)

Ii. Gross Electrical Energy Generated (MWH)

18. Net Electrical Energy Generated (MWH)

This Month 744 247.2 247.0 604 440 190,310 179,924.

  • 19. Lnit Service Factor 33 2
20. Unit Availability Factor
33. 2
21. Unit Capacity Factor (Using MDC Net)
38. I Unit Capacity Factor (Using DER Net) 30
  • 0
23. Unit Forced Outage Rate
66. 8 Yr..-to-Date 4569.6 4561.9 3,405,390 3,223,921 99.8 78.7 10.2
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each I:

Refueling Outage, 8/29/81, 3 months

  • 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status ('Prior to Commercial Operation):

INITIAL CRITICALJTY INITIAL ELECTRICITY COM.\\IERCIAL OPER..\\ TION

~6~81404es a1 0803 R

ADOCK 05000255 PDR 8/9/81 Forecast Cumulative 84,302

48,092.0 45 755~4 90,560,472 27.969,800 26,274,225

' 54.2 54.2 38.7 33.1 Achi~ved (Q/77)

e AVERAGE DAILY UNITPOW~RLEV~L e MONTH

.July 1981 DAY*.

AVERAGE DAILY POWER LEVEL*

I 2

4 5

6 7

8 9

10 II 12 13 I 5.

16 743 741 36 729 95 INSTRUCTIONS (MWe-Net)

DAY 17 18 19

20.

21 22 23 24 25 26 27 28

30.
31.

I;>OCKETNO.

UNIT DATE COMPLETED BY TELEPHONE 50-255 Palisades 8-3-81 DAPeterson (616)764~8913 AVERAGE DAILY POWER LEVEL

  • (MWe-Net)

On this forrn:it. list the :m::rJge d:iily unit puwer l.:vel ir. \\!We-Net *fur.::ich dJy in rh.: rcp,ining !ll<Hllh. Cumpuic tu th~ n.::i.ri:st whule megJ w;it l.

(9/77)

N11.

Date 5

810711 F: Fo1retl S: Scheduled

('l/77)

UNIT SllUTDOWNS ANU POWER REl>l.JCTIONS RErorn M()NTll.. Jn] y 1 98J

~

u :.

~ ".J

'1J

~

5 *=

"l
  • o..

~ :?

-J

..c ; 0::

5 ::C I-

..
=

o-ex:

~V) ~

6 F

497 A

l

({caso11:

  • A*El1uipme11l Failure ( bplai11)
  • B-Mai11lenani.:c 111' Test

(-Refueling D-Rcgulat ory Rest rid io11 Lii.:ensce Evcnl Reporl #

E-Opcralor Traini11g & License Fxa111ina1io11 F-Ad 111i 11is1ra1 ivc

.G-Opcrali1111al hror( Explain) 11-0lhcr ( Explai11)

)-

3

-c Ev c..,

"O 0 "O V>

~ :>

viu t: u 0

u Method:

I-Manual 2-Manual Scram.

J-Aul11111al ic S~ram.

4-0lher (~~plain) *.

Primary 50-255

____Ea] j sades 8-3-81 DAPeterson DOCKET NO.

  • UNITNAJ\\1E DATE COMPLETED llY TELEPHONE (616) 764-8913 Cause & Corrci.:livc Adion lo Prevent Rci.:urrcni.:c Coolant Pump Seal Failure 4

Exhihi1 G - l11sl 0

rni:I ions fllr Prcparati1111,,r l)ata Enlry Shcels for l.i..:rnscc Event Rcpo11 I LERI Fik INUREC.-

01611 Exhibit I

  • Sa1m* S111ir..:,*.

-~ p

SUMMMY OF OPERATING EXPERIENCE FOR JULY 1981 The plant operated at near f'ull power for the first 10 days of the month.

On July 11, the plant was shutdown to perform maintenance on Primary coolant pump and control rod drive seals.

The plant remained shutdown for the rest of the month.