Forwards IE Insp Rept 50-293/81-12 on 810501-29 & Notice of Violation
ML20010B165
Person / Time
Site: Pilgrim
Issue date: 07/29/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Morisi A
BOSTON EDISON CO.
Shared Package
ML20010B166 List:
References
NUDOCS 8108140174
Download: ML20010B165 (2)


See also: IR 05000293/1981012

Text

-

_

_

-

-- - . -

.

.

.

. . . .

..

Docket No. 50-293

,

  1. k

Boston Edison Company M/C Nuclear

[

.

8

ATTN: Mr. A. V. Morisi

-.-

Nuclear Operations Support Manager

-j AUG J. 31981 > C.

800 Boylston Street

D u'h g p p .

Boston, Massachusetts 02199

-

.

N

Gentlemen:

,

Subject: Inspection 50-293/81-12

3

This refers to the redine safety inspecti.7 conducted by Mr. J. Johnson of this

office on May 1-29, 1981, of activities audorized by NRC License No. DPR-35 and

'

to the discussions of our findings held by Mr. Johnson with with Mr. C. Mathis

c.J other members of your staff periodically during and at the conclusion of the

inspection.

-

.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that one of your activities

,

was not conducted in full compliance with HRC requirements, as ' set forth in the

Notice of Violation, enclosed herew'.th as Appendix A.

This item of noncompli-

aree has been categorized into the levels described in the Federal Register

Notice (45 FR 66754) dated October 7,1980. You are required to respcnd to this

letter and in preparing your response, you should follow the instructions in-

Appendix A.

Iri accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosures will be placed in the NRC's Public Document Room. If

this report contains any infomation tha you (or your contractors) believe to

be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a)

'

notify this office by telephone withfn ten (10) days from the date of this

letter of your intention to file a request for withholding; and (b) submit

within 25 days from the date of this letter a written application to this office

,

to withhold such information. Consistent with section 2.790(b)(1), any such

application must be accompanied by an affidavit executed by the owner of the

1

information which identifies the document or part sought to be withheld, ar.d

which contains a full statement of the reasons on the basis which it is claimed

810814o174 810729'

Sj

PDR ADOCK 05000293

G

PDR

'

I

i * m M ;DRP.I.......

.RI;PBP.I .

.BI.:.DRPI. ..

.

.........

. ..

...

.

.

. . . . . . .

. .....

suman

Johnson

fisasser

Brunner

'

'

' %[d N 1 g gi

.. E. . ..[. .[............".....'...."...'.".. .'. . '.

.'

'

'

"

om

..

.. ... .. .....

..

... ......

.... .... ...

....

._

_

L PSRC FORM 318 (10-80) NRCM 0240_

_

)

..

.

.

. .

.

Boston Edison Company M/C Nuclear

2

>

JUL 2 91981

.

that the information should be withheld from public disclosure. This section

further requires the statement to addras with specificity the considerations

listedin10CFR2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If we do

not hear from you in this regard within the specified periods noted above, the

report will be placed in the Public Document Room. The telephone notification

of your intent to request withholding, or any request for an extension of the 10

day period which you believe necessary, should be made to the Supervisor, Files,

Mail and Records, USNRC Region I, at (215) 337-5223.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

~ Original Sicned 37:

E.I BAuwdFA

Eldon J. Brunner, Chief. Projects

Branch #1, Division of Resident

and Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-293/81-12

cc w/encls:

R. D. Machon, Nuclear Operations Manager - Pilgrim Station

Public Document Rocra (PDR) (LPDR)

Local Public Document Room

Nuclear Safety Infonnation Center (NSIC)

l

Comonwealth of Massachusetts (2)

bcc w/encist

Region I Docunent Room (with concurrences)

IIRC Resident Inspector

.

l

Chief, Operational Support Section (w/o encis)

!

l

l

l

l

i

  • * * ' >

.......... .....

.

.. .. .

.

. ..

.. . .

..

.

.

-*

..

.* '

"""""'>

........ .. ...

... . . . .. ... .

.. .. . ..... .

. .. .

..

. . ...

. . . ..

. ... .

.-

. . ..

....

" " >

. ...............

.... . . . ........

.. ... ..... . . . .

. . . .. .. . . ...

.. . .... . .

. . . . . . . . . . . .

. . . . . . . . . . . .

( NRC FORM 318 f 10-80 6 I;RCM O240

g