Amends 21 & 3 to Licenses NPF-2 & NPF-8,respectively, Approving temporary,one-time Relief Request & Associated Tech Spec Changes for Diesel Generator Operability
ML20010A866
Person / Time
Site: Farley  
Issue date: 07/31/1981
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20010A862 List:
References
NUDOCS 8108130034
Download: ML20010A866 (11)


Text

I

, y' Cg%

U'JITED STATES

-[

i

? UCLEAR REGULATORY COT.*..!SSION WAS641NGTON, D. C. 2C553

.;f,,2

\\.

- ~J J ALABAMA POWER COMPANY DOCKET NO. 50-348 JOSEPH M. FARLEY NUCLEAR PLA!iT UNIT NO.1 AMEND: TENT TO FACILITY OPERATING LICENSE Amendment No. 21 License No. NPF-2 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The request for a;;:erdment by Alabama Power Company (the licensee) dated July 31, 1981, complies with the standards and requirements of the Atomic Energy Ac' of 1954, as amended (the Act) and the Comission's rules and regulations set forth 'n 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, anri the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

0108130034 810731 PDR ADOCK 05000343 P

PDR-B

. 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-2 is hereby amended to read as follows:

(2) Technical Scecifications The Technical Sp.ecifications contained in Appendices A and B, as revised through Amendment No. 21, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEA REGULATORY COMMISSION i

O) 02[h di /

A

, Steven A. Varga, af

' Operating Reactors B anch #1 Division of Licensi

Attachment:

C1anges to the Technical toecifications Date of Issuance: July 31, 1981 l

i

4 ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 21 TO FACILITY OPERATING LICENSE NO. NPF-2 DOCKET NO. 50-348 Revise. Appendix A as foilows:

Remove Pages Insert Pages 3/4 8-1 3/4 8-1 3/4 8-2 3/4 8-2 Y

/J.8 ELFAIRICAL PU'
I'R SY51tMS 3/4.8.1 A.C. SOURCES OPEPATING LIMITING CONDITION FOR OPE?ATION 3.8.l.1 As a minimum, the following A.C. electrical' power sources shall be OPEPASLE:

a.

Two physically independent circuits from the offsite transmission network to the switchyard and two physically indipendent circuits from the switchyard to the onsite Class 1E distribution system, and b.

Two separate and indapen;fent diesel generator sets (one 4075 Kw and one 2850 Kw) each with:

1.

Separate day tanks containing a minimum volume of 900 gallons of fuel for the 4075 kw diesel generators and 700 gallons of fuel for the 2850 kw diesel generators.

2.

A separate fuel transfer pump for each diesel.

1 c.

A fuel storage system consisting of four independent storage tanks each containing a minimum of 25,000 gallons of fuel.

A7?LIC.23ILITY: MODES 1, 2, 3 and 4.

ACTION:

a.

With either an offsite circuit or a diesel generator set of the above required A.C. electrical power sources inoperable, demon-strate the OPEPABILITY cf the remaining A.C. sources by per-formingSurveillanceRequirements4.8.1d.1.aand4.8.1.1.2.a.4 within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least two offsite circuits and both diesel generator sets to OPEPABLE status within 72* hours or be in at least HOT STANC3Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following '

30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With one offsite circuit and one diesel generator set of the above required A.C. electrical power sources inoperable, demon-strate the OPERABILITY of the remaining A.C. sources by perform-ing Surveillance Requirements 4.8.1.1.1d and 4.8.1.1.2.a.4

^

l within one hour 2nd at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least one of the inoperable sources to CPE?A3LE status'within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANO3Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN uithin the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore at least two offsite circuits and both diesel generator sets to OPEPABLE status within 72* hours from the time l

of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

  • 0ne time only exception for repair of Diesel IC - the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement
  • for operability of Ofesel IC may be extended to a period of 9 days provided Diesel 1C is returned to OPERABLE status as soon as maintenance is completed.

The provisions of specification 3.0.4 are not applicable for this one time chinge.

    • 0ne _ time only exception during repair of Diesel IC - the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> interval test is extended to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

AMENDRENT NO.1121 FARLEY-UNIT 1 3/4 8-1

ildCTRICALPOWERSYSTEMS ACTIO*!(Continued) c.

With two of the above required offsite A.C. circuits inoper-able, demonstrate the OPERASILITY of both diesel generator sets by performing Surveillance Requirement.4.8.1.1.2.a.4 within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, unless the dicsel generators are already operating; restore at least one of the inoperable offsite sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. With only one offsite source restored, restore at least two offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT STAND 3Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

d.

With both of the above required diesel generator sets inoperable, demonstrate the OPERABILITY of two offsite A.C. circuits by performing Surveillance Requirement 4.8.1.1.1.a within one hour and at least once per 8 hourfthereafter; restore at least one of the inoperable diesel generator sets to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Restore both diesel generator sets to OPERABLE status within 72* hours from time of initial loss or be in at least HOT STANC5Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.8.1.1.1 Each of the above independent circuits between the offsite transmission network and the onsite Class 1E distribution system shall be:

a.

Determined OPERABLE at least once per 7 days by verifying correct breaker alignments, indicated power availability, and h:

Demonstrated OPEPABLE at least once per 18 months during shut-down by transferring unit power supply from the normal circuit to the alternate circuit.

4.8.1.1.2 Each diesel generator set shall be demonstrated OPERABLE:

At least once per 31 days, on a STAGGERED TEST BASIS, by:

a.

1.

Verifying the fuel level in the day tank, 2.

Verifying the fuel level in the fuel storage tank's, "Cne time only exception for repair of Diesel IC - the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement. '

for operability of Diesel IC may be extended to a period of 9. days provided Diesel 1C is returned to OPERABLE status as soon as maintenance is completed.

The provisions of specification 3.0.4 are not appitcable for this one time change.

    • 0ne time only exception during repair of Diesel IC - the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> interval test is extenC:d to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

AMENCitENTNO./d21 FARLEY-UNIT 1 3/4 8-2

.. r ua o

U.'.lTED STATES

-[ '

. ; ',}j

.;UCLEAR REGULATORY CO*.*.* *lSSION

., > n cto.o.c.2:n s

.%}.[

%~~

ALABMA POER CO':PA!4Y DOCKET NO. 50-364 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO FACILITY LICENSE Amendment No. 3 License No. NPF-8 1.

The Nuclear Regulatory Comission (the Commission) has found that:

A.

The request for amendment by Alabama Power Company (the licensee),

dated July 31, 1 981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of tne Comission; C.

There is rease.iable assurance (i) that the activities authorized by tnis amendmat can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 Cr'R Part 51 of the Comission's regulations and all applicable requirements-have been satisfied.

2.

Accordingly, the license is amended by changes.to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility License No. NPF-8 is hereby amended to read as follows:

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as-revised through Amendment No. 3, and the Environncntal Protection Plan, Appendix B, are hereby incorporated into the license. The licensee shall operate the facility in accordance with the Technical Spect-fications.

3.

This license amendment is effective as of the date of issuance.

FOR TH N CLEAR REGULATORY COMMISSION Vl

hl4f B. J.I Y ngblood Chief Licensi g Branch No. I Divisio of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance:

July 31,1981 a

A.TTACH::ENT TO LICENSE AMENDMENT NO. 3 FACILITY LICENSE NO. NPF-8 DOCKET NO. 50-364 Revise Appendix A as follows:

Remove Old Pages Insert Revised Pages 3/4 8-1 3/4 8-1 3/4 8-2 3/4 8-2 3/4 8-3 3/4 8-3 e

~

374.3 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES 0?ERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources dall be CPERASLE:

a.

Two physically independent circuits between the offsite transmission network to the switchyard and twc physically independent circuits from the switchyard to the onsite Class 1E distribution systec, and b.

Two separate and independent diesel generator sets (Set A: OG 1-2A and DG-1C, Set B:

DG-2B and DG-2C) each with:

1.

Separata day tanks containing a minimum voluce of 900 gallons of fuel for the 4075 kw diesel generators and 700 gallons of fuel for the 2850 kw diesel generator.

2.

A separate fuel transfer pu:p for each diesel.

c.

A fuel storage system consisting of four, independent storage tanks each containing a minimum of 25,000 gallons of fuel."

A?PLICABILITY:

MODES 1, 2, 3 and 4.

ACTION:

a.

With an offsite circuit inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirements 4.8.1.1.1.a and 4.8.1.1.2.a.4 within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least two offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STAND 3Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With one diesel generator set inoperable, demonstrate the operabilii;y of the remaining A.C. sources by performing Surveillance Requireme.ts 4.8.1.1.1.a and 4.8.1.1.2.a.4 within one hour and at least once per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />"s"Thereafter.

Restore both diesel generator sets to OPERASLE status within 72 1ours or cocply with the following:

1)

Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLO SHUTDOWN within the folicwing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

"One inoperable fuel storage tank is equivalent to one inoperable diesei generator set.

    • 0ne time only exception for repair of Diesel'1C - the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement -

fo^ operability of Diesel IC may be extended to a period of 9 days provided Diesel IC is returned to OPERABLE status as soon as maintenance is completed.

The provisons of specification 3.0.4 are not applicable for this one time change.

      • 0ne ti=a only exception during repair of Diesel IC - the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> interval L

test is extended to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

FARLEY-UNIT 2 3/4 8-1 AMENDMENT NO. 7 3 4

h'.EC i RICAL FO'.."cR SYS i EMS ACTION (Continued) 2)

One diesel generator set may be made inoperable for up to 14 days to perform scheduled maintenance and testing on diesel generators 1C (or 2C) provided all the followin'g are satisfied:

a)

Unit 1 is in 1400E 5 or 6 and appropriate technical specifica-

.tions covering the diesel generator sets are satisfied.

b)

The remaining' Unit 2 diesel generators 1-2A, 23, 1C (or 2C) are OPERA 3LE.

c)

The service ' water system is recirculated to the pond and s.urveillance requirement 4.7.6.2.1 is verified prior to removing IC (or 2C) from wrvice and once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

d)

Diesel Generator 1C (or 2C) is returned to OPERABLE status as soon as maintenance is.cc:pleted.

Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SH;ICOWN within the folicwing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

With ene offsite circuit and one diesel generator set of the. above c.

required A.C. electrical powar sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirements 4.81.T.l.a and 4.8.1.1.2.a.4 within one hour and at i

4 1

least once per 8 71ours thereafter; restore at least one of the inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Restore at least two offsite circuits and both diesel generator sets to OPERASLE status within 72* hours from the time of initial loss or be in at least M0T STANCBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

d.

With two of the above required offsite A.C. circuits inoperable, demonstrate the OPERABILITY of both diesel. generator sats by performing Surveillance Requirement 4.8.1.1.2.a.4 within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, unless the diesel generators are already operating; restore at least one of the inoperable offsite sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the' next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. With only one offsite source restored, restore both offsite circuits to OPERABLE l

status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTCCWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Cne time only exception for repair of Diesel IC - the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement t

for operability of Diesel 1C may be extended to a period of 9 days provided I

Diesel 1C is returned to OPERABLE status as soon as maintenance is completed.

The provisions of specification 3.0.4 are not applicable for this one time change.

    • Cne time only exception during repair of Diesel 1C - the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> interval test is extended to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

FARL EY-UNIT 2.. __.

3/4 8-2

.._ AME:iDME:JT NO.J 3

.7

ELECTRfCAL POWER SYSTEMS ACTIO.":

(Continued) e.

With both of the above required diesel generator sets inoperable, de.cnstrate the OPERASILITY of two offsite A..C. circuits by performing Surveillance Requirement 4.8.1.1.1.a within I hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> *thereafter; restore at least one of the l

inoperable diesel generator sets to OPERASLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDSY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Restore both diesel generator sets to CPERABLE status wi ain 72* hours from time of initial loss or be in least HOT STAN05Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTD0%N within the fcilowing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.3.1.1.1 Each of the above required independent circuits between the offsite transmission network and the onsite Class 1E distribution system shall be:

a.

Determined OPERA 3LE at least once per 7 days by verifying correct breaker alignments, indicated power availability, and D.

Demonstrated OPERABLE at least once per 18 months during shutdown by transferring unit pcwer supply from the normal circuit to the alternate circuit.

4.3.1.1.2 Each diesel cenerator scall be demonstrated OPERABLE:

a.

In accord ce with the frequency specified in Table 4.8-1 on a STAGGERED IEST SASIS by:

1.

Verifying the fuel level in the day tank, j

2.

Verifying the fuel level in the fuel storage tanks, 1

3.

Verifying the fuel transfer pump can be started and transfers fuel from the storage system to the day tank, 4.

Verifying the diesel starts from ambient condition and accelerates to at least 900 rpm, for the 2850 kw generator and 514 rpm for the 4075 kw generators, in less than or equal to 10 seccnds. The generator voltage and frequency shall be 13g52 volts and 2 57 Hz within 10 seconds after the start signal.

5.

Verifying the generator is synchronized, leaded to greater than l

or equal to its continuous rating, and operates for greater than l

or equal 60 minutes, "One tima only exception for repair of Diesel IC - 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement for operability of Diesel IC may be extended to a period of 9 days provided Diesel 1C is returned to OPERABLE status as soon as maintenance is completed.

The provisions of specification 3.0.4 are not applicable for this one time change.

    • 0ne time only exception during repair of Diesel IC - the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> interval test l

l is extended to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

AMENDMENT NO. 2 3 FARLEY-UNIT 2 3/4 8-3