Requests Schedule for Actions FEMA Is Planning in Order to Reassess Offsite Emergency Preparedness.Also Requests Specs Re Which of Indicated Deficiencies Must Be Removed to Allow FEMA Finding of Adequate Preparedness
ML20010A059
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/18/1981
From: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Dickey J
Federal Emergency Management Agency
Shared Package
ML20010A058 List:
References
NUDOCS 8108100496
Download: ML20010A059 (1)


Text

-

UNITED STATES g.A 88c

/[

oq[:,

NUC1. EAR REGULATORY COMM!sslON WASHINGTCN. D. C. 20555 1Ms1bf

~

N..s June 18, 1981 MEMORANDUM FOR:

John Dickey, Acting Assistant Associate Director Population, Protection and Preparecness Office Federal Emergency Management Agency FROM:

Brian K. Grimes, Director Division of Emergency Preparedness Office of Inspection and Enforcement

SUBJECT:

EMERGENCY PREFAREDNESS AND SUPPORT OF SAN ONOFRE NUCLEAR GENERATING STATION With respect to your June 3,1981 letter, regarding Emergency Preparedness in support of.the San Onofre Nuclear Generating Station (SONGS), I request that you specify which of the indicated deficiencies must be removed to allow a FEMA finding of adequate offsite preparedness.

Furthermore, since, as you kncw, there is an ASL3 hearing on SONGS Units 2 and 3 that will consider this issue, I also request that you provide me with a schedule for the actions FEMA is planning in order to reassess the offsite preparedness Tne information.you provide -is also necessary in order for NRC to make an assessment of the preparedness in support of SONGS Unit 1, which is an operating facility.

Based on the information you provide on the significant deficiencies and our assessment, the NRC will be in a better position to decide if action under our regulations is necessary.

On a separate, but related issue, I request that FEMA clarify that the judgments in the June 3,1981 memo do not apply to low power (up to E%)

operation of SONGS, and, in particular, whether FEMA judges low pcwer operation (up to 5%) acceptable on the same basis as for other plants wnere tnis rinding has been made.

i "K

t Brian K. Grimes, Director Division of Emergency Preparecness Of fice of Inspection and Enforcemen:

1 l

~

8108100496 810728 PDR ADOCK 05000206 F

PDR

,w-

,---n

--,y-m

I l

d l

\\

~

Southern Cah.fornia ccisca Com.can

~

  • C.SCKSCC l

1144 W ALN W1" G R C V E A V E N U C gCSCM CAO. CALIFORNI A St??C C. P. C AS KIN tc68*=cht

.sammea n op==veita s CNoma tame.

ista SFtdeot m.a $ -.d, S c. 8_1 saatw. amo uce=smo

.vr. Bri.r. K N-==

Cffice cf 7ns=ec ics and Efercement U.S. htclear Peg"' *: rf ewd esi=

Washing-~, D.C. 20555 Cea=' M:. Grires:

Sm-- C: E=er.:ency 91 e4ne.

i San Cr.cfre htclear Ge:arating Sta =

Unit No.1 Docket Sc. 50-206 We have revied em " n**"m Fi-di=gs a:xi Ce-a d stien Pela ing to de Stz a-cf State a:xi I.ccal he:.g.5cy ? ecaredress fer em San C=cfre We'aa-Gerarating Stati=" prepared by em Fedaral E:ne_vncy Manager:n.:

M.ency (m) dated Ct.rm 3, 1981.

Copies cf this s, ar..s repc::: 'Ete a' ec review.

'he been distributed to de Wected local jur_sdic i=s fcr ead-ac..=

  • nich is center:=. _,"a eC

=. t.:cse c: =.s, e-=~ :.s t u.n en :

.3._, cwt =.

' y SCE := st cr: State and lccal jur_sdic-d ~.s := achieve sui s :n ial ed in te m re;c =, ed := se i:==ve.m.ents in cer-'in areas idan d #4 fc. _. 2.e sc:: ad"' a fcr 24 av.e'ichnent cf tese i:=:riements.

At de tire cf m's '.n=er :n Firdd ngs ani e"=

d.arien" SC

.wi ed dat several ccics rec-'d ed f.._

a- -h: :ent.

Mcs: Of te I'.daed, 24 lack cf m Y ac-d - i 7:1ved d2=.velepc5== cf p:W es.

SCP's c=vering va "ces activi les appears to have ur "'y inf'"anced e.e e

severirf c.". c.e adverse fen c=clusiens.

Meetincs w.re held cn Jtra 10 and June 17, 1981 iriclv:.ng 2

lem ' W._sdic i=s and SC.= devele=. a :lan Of ac-d n fcr e.e c= i-d ng I

dewic=ent of emergenef pre =ar=F **s.

h ad'd ::.=, SC ret wit M 1

Pegi= X representatives = J=e 15 ani June 19, 1981 := reaci. r.

tr.ders-=-? dng as to te relative sig: d 'd"nce Of i s l dd gs rd :nec=-

l enda _c=s.

Er' -<.re (1) t= -d=

le: er entitled "Cc.mve.'I:ti=s

(

Pec"d-ed t:.Mi =" M Ce-a nati=s of June 3, 1981" sets f_. _. te sc =e ci te sig: d '4r'.7: a:eas ed a descr_pri= cf te actims *at.id f0= de basis cf u:xiated :"'. 'd-di c cf cver acecuaev.

bclestre vd

.. ~

Ce c'"..r'"eC. ve' 1C0:.=

= ""--"ess > ' areas

.s an '.rCa eC st:T"2. y c.

(.)

D hhYNE j (

l

_.__,.-._._..._..._..._,..- __ -,._. -_._..,,, _..-...,_..~_,.,.... -.._.., - _.,,- _._...-...._,

m.

.c:e==.ene.r i:.L===.

.e r. F...,d =_ ".. - ' a = - C7_: er.' d.e,.c. '-' _'_~_.

r_, 4 _ v.c. --

Dcd.e: Sc. 50-206 page 2 Of eac".

pic.

medi. g devel== ant rd a. scbad a f r f.e ace==' ',e' re.:

As. -.

.gg-Oc +.,

1 :-, 7 o, 8.7

.'.s. m 4-a,e.ew.

.. p_ w. a.

-ig 4.

~

a.- ~ yta, a

,y.,

u.1g =_.,s _a -;:.,;g.

e g..u: -a

,,. ~,g.a 2,

?

We md da-f.at Stzte-rd loc gove=ren s hr;e d_~..e a e'

ubly gocci jcc in >+d av=g a. gce stata cf p.r:a edness in f.e d

__.-4 cal a_=. as 4..w

"_.a. ~. =c_ '.~..'.: ~_ e,.~-....'4...

-' 4 = %W

.'.as.d. c'. dM

.=',A- - ' ' ~. ed

  1. --- = i

=d

' ~. ",v,, "a '. 4.".es..=..'"..,s f r== ^ lo-$7 p ' edic,.ica (e.x.y for State age ~.cies) of r'dd :lec:.-C cer ener resgensa p' =-= rd es+14 = =e. Of a. lccal. interage.cf

- e_.

We in an:i c c.ive 5.e =-

.=.ast =.cssible s..

= 2e lccal agencies in = der _sking pla=ed i===veme. :s.

We are==.fikt: that c.e f.:.L.v satisfy SR-ited SCZ/ local geve

.n= agenef =":_ V '. ' lv =a=er.

rec'--ecents ::: sargency prepa_ ecness = a. ::.:e Ve:.r ::-_lv. vec.:s, P.

asx. =.

s

.s.

A :ac=ents-cc:

Jchn E. Cickef, M mnr_s S..vrda, FDG, Peg cn 'X R. H. W<en, NFC, I & E..eg-M V R. Sandw=a, Ei2%, regi~ ~Z

.VS.

-='-2_'a FCX, CT3nce C..".t

.f I

J. ELT.0, San DiegO CCC."*..f

(

R. Colec.r.' Citf cf San c' % te t

Ms. Cyn-"d* Fe_.v,'.scn, Cir! cf San J.J.an Capi =

anc J. Ster,,e, Sta:e 9ad.s s. Fecrea, = _ pe. d' a = ;._' e.a r:. Col. J. Waaca, CESC, Ca== pe:v at.~.

J. Fa=='-'s, 5ta:S ITT F. Miraglia. SRC Li::ensing 3ra.c' Nc. 3 p.: cer:.es 2Cna L 7 s--..m-- m, ace) 4 f

I

  • e 9

e

,e-

---,.,,,--,--.-,-.7-n.,,-m-

- - -,,., -.. _,.,, _, - ~.. -

4 ENCIUSuitE (l)~

.onHLCilVE ACil0RS HEQtilHfD 10 ADuitESS FEHA DElERMINATIONS Of JllNE 3, 191116 LHA CONCEltH_S_

ffMA HECOMMENDAll0N HESp0NSE**

EHA llegion IX Evaluattuin of l'lans asid Capabilities

' Host Critical Concern" lie as.>egsenent dead Develop a siiulti jurisdic-Continue to install tlie llegitig Pliysics Computer onttoring of actual Llopal response capability whicli g!;I proylde a proinpt. coliservatlye 4ssessisiesit of t isite radiologl(al to assure adeiluate cover 49e the actual.adinlogical cosise<lnences of all accidesit, onse<luences of a of plume pathway and stag-11:15 will he operational to a limitetl degree by fuel adiological emergency dar dized procedures willcli load witti full operation expected l>y July,1982.

ondition through allow flexibility lit further develop standard radiologlf al inonitorleig procedures (50p's) f or the loc 41 jnrisdictions and tiie vie thoos, systeliis asid resliosise.

Of(site llose Assessment Center (ODAC) hy August, yquipment is considered 1981.

SCE additionally will assess tiie local to be weak and lii e, iced jurisdictiofis' current equipment against. their of improvenent tojineet needs anal ideritify asiy deficiencies noted.

SCE will minimum criteria.*

l provide staf fing to assume 4 role of lea <lersliip in tiils (usiction.

SrE ylli proylde tralining prograins for personii liivolved in use of tlie S0 pts,

" serious Colitern" lhe interim - LOf Until the permanent E0f is SCE wilt develop S0p's to siiake current EOF operattoris stiows a lack of clear completed, die litter lip E0f clearer and more mainageable alosig tlie listes of tiie

operating procedures, should be relocated to a current plesisting arravigeinevits.

l.lipited physical f ragmeistation of Llie sisigle location separate linprovemerits of the prescrit facilities will be identi-locllity, lack of f rom the Sasi Clesiiesite EOC fled and accrunplished.

managemeint direction and staffed with leanagement, umiluunicat ions, si ze congmalilcators ased other of thic f acility, and support persolutel necessary is a signtil(asit for E0i olie ra t t oris.

impedance to Ilic Safi Cleilielite 10C operatlon.

sehedule f or these actions is identitled in ENC 10SilHE (2) 3a result of a siteettsig betweesi ffMA and SCE on June IS,19111, it is SCE's understanding (liat tile slynificant concerns cliessed in tlie i tHA llegion IX Evaluation of the Hay ll,1981 Exce cise are covered lei these plasilied acilosis.

l l'HA Culli.l itlis ifMA ItLCOHHENHAll0N ltESp0NSLS

'"Ha lor Conterns" A need to clarity Develop 4 jullit stdiidar dized (See lleni [1] dbove),

SCE will develop stalidardized monitoring and assess-sinulti-jurisdictiosi41 respolise procedures for Llip flye involyed foglities to obtalil inent dut ies f or liolla t eanis, obtaire sosti[iles, costdiact diidlyses, gild Ldke iteratssary

' plume and ingestion protectlye dctlons for tile liegestlptt palliwdy epiergeticy palliways as leicy pertain pldelittlig zogne costSistesit Willi line St4te lladlological

so State 01$, State lleditle proposeti {ngestlog patliwdy prncedures.

Develop Itadiological lleallli esid asi tillegrated radiological resposise lediti to l>e dliccted

! local jurisdiction.

by tiie Offsite llose Assessment Center (00AC) la conduct.

field anoilltoring, Heans to provide early Instdll strens deid provide SCE will proceed witti curront plans for sirell losta,)latit lnottfloation and clear warnlug dissemindtiori capacity SCE wll1 develop SOP's for public notificatiosi yld (lie Ilusi. rut t ions t o Llie to remote dreds wiiere pyblic Esiiergesicy llroadcdst Systpin (Ells) piul ]pcal stallosis lpublic withly tiie planne 4ddress systems tropi syrfdcp idesitified li) tile plans.

SCf Wil] sievelop Sup's for.

jemposure pathway IPl or dirborsie velitcle is coordisiat f ori and decis toit nidkling (si itse of s t resis.

"liaec liot licen in:/i alled I eagis t red.

or testeel.

i i

lAdequale emergency SCE provide response equip-Agreements lidve beest made betweesi SCE and local agesicles llacilit ies dnd'espsip-ment wlilcli was pronilsed til tiidt. specific equigninent will be ordered by the locd] jur'l ment to support the Llie local jurisdictiosis, dictions asid hilled to SCE.

Equipment procurement. has

' emergency s esponse including strests diid addt-begun asid is contiliuing.

SCE will follow up WILb report

,haec not been provided.

tional comsminicatlosis eqtilp-status of equipmerit received or oil order.

SCE will rpyle j

ment.

equignisesit lieeds diid status of equipment. procurentesit dctfyllles.

Itadiological einergesicy SCL, in conjunction with tiie (See items [1] asul [3] aboye).

SCE will develop drid

response training has State of Calliolsild, sliould linplesisesit a pi'ograsis of tralpisig lp the critical dreds of

' n entially not been develop the necessdry trdin-rddidtioit pionitorlng drid dssessisielit, roliisistinicdtlops, psfounded to those who ing to ineet the Idesitified decision-mak jng dnd coordindtjon regdrdisig protective may he called upon to needs in the local jurls-actions, etc.

assist in an emes gesity.

dictions.

1 1

1

i

iI HA ChilClitflS ITHA ItLCOHHLtillAIIOr{

14ESPullSLS "Suliicient Concero to lleissa in a Ha. lor i ssue" SCl lias sent sisaile inf or-l)lssessiisiote advarice pulil j c SCE wll1 proceed witti Llie pulilic edycotipsi progrdssi

at ion ava ilalile alioist linf ornisat ioII.

Lliat jsicludes agt easiergericy resporise lirocliure dild radle-lios the,pul>lic would lac t j oil lilf orisiat1 oil l>rociture sital]er, girepardt j ogt drid fiOL I f l *al of' Wiial llie distril>iit tori of flyers avid >osters, liew ads, cosisiiiirit ty pill

  • l i t s litiLiaI actioils seiee t ),ggjg, etc, sitould lac ill ali er'ergeticy.

5 9

9 e

h

ENCLOSURE (2)

SUMMARY

OF PLANNED ACTION SCHEDULE Items (a) througn (hl 1.

Develoo 50P's covering. ne following topics:

1s-draft - 7/15/51

.inal craft - 9/1/31 a_

Oceration of :ne Offsite Oose Assessment Center (00AC)

Implemen: - 10/1/S1 b.

Radiation surveys by field nonitoring teams c.

Emergency Communicarions c.

Use of :ne siren alerting system and public notification e.

Coordination relating to protective actions f.

Acquisition, display and use of meteorological data g.

Operation of the EOF Item (i):

n.

Ingestion pathway monitoring ist craft - 9/15/81

~

  • Final draft - 11/1/31 i.

Existing 50P's covering other plan elements Implement - 12/1/81 2.

Obtain equi: ment requi red to carry out racia: ion monitoring functions a.

Survey types and quantities of equipment actually in place 7/15/51 b.

Initiate procurement of ecuipment shortages 8/1/S1 3.

Develoo accitional communications capability I

a.

xpand interagency pnene net brk to include CHP 7/15/31 i

b.

Provide speaker moni: ors a: EOC's 7/15/S1 c.

Provide teletype message system network between all 10/15/31 l

principal centers c.

Provide accitional communication ci rcuits 10/15/81 4

Maxe pny sical improvements to :ne EOF l

a.

Icentify possicle imorovements 9/1/51 b.

Obtain agreements to make imorevedents 9/1/31 c.

Cons:. uct i=crovements 10/15/31 5.

'nstall Si rens 50% y 7/1/31 90%.:y' 9/'./ 31

'0C% oy 10/15/31

2 SCHEDULE 5.

Accomolisn

.aining in use of new anc existing procacures, facilities, anc ecuioment.

1.

Develop training program (long and snor: term) 7/15/81 c.

Develop training material (snart :enn program) 9/1/81 c.

Concuct training and drills. (snort :erm program) 9/1/81 :nrougn 10/15/81 d.

Implement long term training program 11/1/81 througn 2/1/82 7.

Fuelic Information Program

Ongoing, Initial p ogram complete 9/1/81 O

e

?

i I

f.

S

=

r..

,, - ~,. -.... -.. -

$25%%

l: RJ. F Federal Emergency Management Agency Wa;hington, D.C. 20472 July 14, 1981 Memorancum For:

Brian Grimes Director Division of EmergeTTc~y~ Preparedness Uffice of Inspection and Enforcement U.S. Nuclear Regulatory Commission From:

Robert T. daske/'

/

i i

'j d 7

/

Acti.ig Directbd dadiological Emergency Preparedness Division btate and Local Program Support

Subject:

Emergency Preparedness and Support of San unofre Nuclear Generating Station (SONGS)

In your June 16, 1981, memorandum you asked that we:

1)

Specify which of the deficiencies identified in the State and local plans ana joint exercise in support of SONGS must be removed to allow a FEMA finding of adequate of fsite preparedness; 2) r)rovide a schedule of actions FEMA is taking to reassess the offs. te prepareoness; 3)

Clarify that the evaluations included in our June 3,1981, memorandum do not apply to the low power operation of SONGS.

Item 3 is the suoject of a separate memorandum.

The suostance of item 2 was the subject of a letter to you dated June 26, 1981, from K. P. daskin, Manager of Nuclear Engineering. Safety, and Licensing, Southern Cali fornia Edison Company.

We have confirmed with FEMA Region IX that enclosures 1 and 2 of this letter represent agreed positions concerning FEMA's major concerns, what needs to be done to correct them, and SCE's proposed act ions (including training) to assist in correcting the deficiencies.

FEMA Hegion IX will monitor the actions promised by SCE particularly as they relate to the State of California and tne local jurisdictions.

FEMA Region IX will provide us with a monthly status report, wnien we will make available to you, beginning with the period through July 31, 1981.

This report will include requirements for, and the results of, any tests, drills, or a mini-exercise.

Our current assessment is that anotner complete exercise will not ce necessary but ratner several limitea ones to test specific systems or procedures.

The Uctooer 15, 1981, date for essentially comoletihg the cor rect ive actions would al low FEMA Hegion IX to complete its evaluation we ant icipate providing wC attn FtMA ftncings and ceterminations about Novemoer 1, 1981.

This timing assumes that tne btate and local governments will make commitments that complement tne commitment mace oy SCE.

FEMA will encourage tne State and local governments to nake sucn commitments.

Please keep in mtna tnat tnese commitments could be af fected oy the expressec cesire of tne State of California for Emergency Planning Zones larger tnan requirea in NUREG/Ue54 FEMA-REP-1, Rev 1.

.