Text
<
~
.-
l
[
L
JUL 2 41%i
Docket Hos. 50-245
F/<-
50-336
,y
y
/k
b/D
/
flortheast Huclear Energy Company
r /g[ '-.
ATTH: tir. W. G. Counsil
l-
o
.
r
Senior Vice President - Nuclear
!
' d 7
i
'
- .s.7sgg% ;% ,,g
O)
}
47/
i
Engineering and Operations
l
P.O. Box 270
i
qs
Hartford, Connecticut 06101
V)
N
3
'\\o
'
!
Gentlemen:
.-
Subject: Combined Inspection 50-245/81-08 and 50-936/81-07
i
This refers to the routine inspection conducted by fir. J. Shedlosky of this
>
office on May 17 through July 11, 1981 at the Millstone Nuclear Power
Station, Waterford, Conn ,ticut, of activities authorized by NRC License
l
Nos. DPR-21 and DPR-65 and to the discu:;51ons of our findings held by
,
Mr. Shediosky and Mr. firoczka and other members of your staff periodically
during the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
inspector, and observations by the inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into the levels described in the Federal Register Notice
r
(45 FR 66754) dated October 7, 1980. This notice is sent to you pursuant to the
l
provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,
.
Code of Federal Regulations. Although Section 2.201 requires you to submit to
l
this office, within 25 days of your receipt of this notice, a written statement
of explanation, we note that this item of noncompliance was corrected prior to
the completion of our inspection, and therefore, no response with respect to
this matter is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosures will be placed in the NRC's Public Documm
Room.
If this report contains any inf:-rmation that you (or your contractors)
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
in, secuon tw/o en8c0
9
.
'5
we
DLOSKY / J.EU4M / BR NER
p
Yl8/
U
Y"
8108100177 810724
h
PDR ADOCK 05000245
/
G
ppy
$ eg (
-
-
.-
_
_
__
_
__
,
-
-
m.
!
Northeast Nuclear Energy Company
2
i
i
that you (a) notify this office by telephone within ten (10) days fHun the date
of this letter of your intention to file a mquest for withholding; and (b)
subnit within 25 days from the date of this letter a written application to this
office to withhold such infemation. Consistent with section 2.790(b)(1), any
such application must be accompanied by an affidavit executed by the owner of
the infomation which identifies the dociment or part sought to be withheld, and
which contains a f911 statement of the masons on the basis which it is claimed
I
that the infomation should be withheld from public disclosure. This section
further requims the statement to address with specificity the considerations
listed in 10 CFR 2.790(b)(4). The infomation sought to be withheld shall be
incorporated as far as ponible into a separate part of the afffdavit.
If we do
not hear fmm you in this regard within the specified periods noted above, the
mport will be placed in the Public Decment Foos). The telephone notification
of your intent to request witanolding, or any request for an extension of the 10
day period which you believe necessary, should be pode to the Supervisor, Files,
Mail and Records, USMRC Region I, at (215) 337-5223.
No reply to this letter is requimd; however, if you should have any questions
concerning this inspection, we will be pleased to discuss them with 30u.
Sincemly,
,
/Sl E. 7. blWMME6-
Eldon J. Crunner, Chief
Projects Branch fl. Division of
Resident and Project Inspection
Enclosure: Office of Inspection and Enforcement Combined Inspection
Peport Number 50-245/81-03 and 50-3*J6/01-07
'
cc w/ enc 1:
J. F. Opeka, Vice President Nuclear Operations
,
E. J. Mroczka Station Superintendent
'
D. G. Diedrick, Hanager of Quality Assurance
'
J. R. llisem1 wright, Licensing Safeguards Engineer
i
Public Docuent Roon (PDR)
.
Local Public Document Room (LPDR) (HSIC)
'
Huclear Safety Infomation Center