JUL 2 31981
Docket No. 50-423
f
w
Northeast Nucler.r Energy Company
3
ATTN:
Mr. W. G. Counsil
( [l
'
Senior Vice President - Nuclear
.
Engines. :g Operations
{
I
7
r
P. O. Box 270
,
Hartford, Connecticut 06101
p 4'",40 ) Nf
-
--
%% % g ,&
-
Gentlemen:
,(
Subject:
Inspection 50-423/81-06
m
-
This refers to the routine safety inspection conducted by Mr. J. Mattia of
this office on May 8-29 and June 1-5, 1981 at Millstone Nuclear Power
Station Unit No. 3, Waterford, Connecticut of acti ities authorized by NRC
License No. CPPR-113 and to the discussions of our findings held by Mr.
Mattia with Mr. S. Toth and others of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and
observations by the inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
This item of
noncompliance has been categorized into the levels described in the Federal
Register Notice (45 FR 66754) dated October 7, 1980.
You are, required to
respond to this letter and in preparing your response, you should follow
the instructions in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractors)
believe to be exempt frcm disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within ten (10) days from the
date of this letter of your intention to file a request for withholding;
and (b) submit within 25 Jays from the date of this letter a written application
to this office to withhold such information.
Consistent with section
2.790(b)(1), any such application must; be accompanied by an affidavit
executed by the owne of the information which da tifies the document or
/ /' '
,$90
'
[4'eimi
(DE&TI
E&TI
PS#1
0RPI
n
,pfatti
b
Ebneter
Tri,pp,
Brunner
$P
q,,
lffl
/
g
6t!(
8108100166 810723
0FFICIAL RECORD COPY
PDR ADOCK 05000
a
-
-
--
--
-
-
-
J
'
.
,.
-
.
Northeast Nuclear Energy Company
2
JUL 2 31981
part sought to be withheld, and which contains a ful; statement of the
reasons on the basis which it is claimed that the information should be
withheld from public disclosure.
This section further requires the statement
to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
'
The ir. formation sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you
in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
The telephone notification of your
intent to request withholding, or any request for an extension of the 10
day period which you believe necessary, should be made to the Supervisor,
Files, Mail and Records, USNRC Region I, at (215) 337-5223.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
/.5/ E.I 6pFA
Eldon J. Brunner, Chief, Projects
Branch #1, Division of Resident
and Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-423/81-06
cc w/encls:
K. W. Gray, Construction Quality Assurance Lead
H. R. Nims, Director of Nuclear Projects
J. F. Opeka, Station Superintendent
,
J. R. Himmelwright, Licensing Safeguards Engineer
0. G. Diedrick, Manager of Quality Asrurance
1
'
Public Document Room (PDR)
Local Public Document Room (LPDR)
1
Nuclear Safety Information Center (NSIC)
_
,
_ , . .
-
bcc w/encls:
"
-
Document Management Branch TIDC (For Distribution)
REG:I Reading Room -_
.
-
State of Connecticut
NRC Resident Inspector
Chief, Operational Support Section (w/o cy of encls)
A
)