ML20009G883
| ML20009G883 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 07/24/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Davidson D CLEVELAND ELECTRIC ILLUMINATING CO. |
| Shared Package | |
| ML20009G884 | List: |
| References | |
| NUDOCS 8108050181 | |
| Download: ML20009G883 (2) | |
See also: IR 05000440/1981009
Text
.
0
.
,
bl. 2 4 19@
Decket No. 50-440
-
g \\ Eld]%,
Docket No. 50-441
,
.
'
h)
The Cleveland Electric Illuminating
-
Company
[g!
.g
ATTN: Dalwyn R. Davidson
"r,.
2
'
-
'"OdISSfx r
Vice President - System
'g'.
3 Ma"%rea [d
Engineering and Construction
y*"
Post Office Box 5000
%
Cleveland, OH 44101
b
h
?
o>
Gentlemen:
W
This refers to the routine safety inspection conducted by K. D. Ward of
this c.ffice on June 4, and July 14, 1981, of activities at the Perry
Nuclear Power Plant, Units 1 and 2, authorized by NRC Construction Permits
No. CPPR-148 and No. CPPR-149 and to the discussion of our findings with
Mr. M. Edelman and others at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in enclosed Appendix A.
A
written response, submitted under oath er affirmation, is required.
In accordance with 10 CFR 2.790 of th : Commission's regulations, a copy
of this letter, the enclosures, and ,our response to this letter will be
placed in the NRC's Public Documen' Room.
If the enclosures contain any
information that you or your contractors believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this
office by telephone within seven (7) days from the date of this letter of
your intention to file a request for withholding; and (b) submit within
twenty-five (25) days from the date of this letter a written application
to this office to withhold such information. Section 2.790(b)(1) requires
that any such al.p'icat. ion must be accompanied by an affidavit executed by
the owner of the information which identifies the document or part sought
to be withheld, and which contains a full statement of the reasons on the
basis which it is claimed that the information should be withheld from
8108050181 810724
$f [
PDR ADOCK 05000440
G
.
. _ _ _ - ,
-
.-
__ .
. .
'
.
,
9
i
The Cleveland Electric
-2-
Illuminating Company
,JUL 2 4 Gat
,
i
public disclosure. This section further requires the statement to address
with specificity the considerations listed in 10 CFR 2.790(b)(4). The
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified periods noted above, a copy of this
letter, the enclosures, and your response to this letter will be placed
in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
,-b
y'gf LW
(,
it!Y
l b
C. E. Norelius, Acting Director
,
Division of Engineering and
Technical Inspection
,
Enclosures:
j
1.
Appendix A, Notice of
l
Violation
2.
IE Inspection Reports
No. 50-440/81-09 and
No. 50-441/81-09
cc w/encls:
-
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
i
i
Harold W. Kohn, Power
Siting Commission
Daniel D. Wilt, Attorney
Helen W. Evans, State of Ohio
,
,
!
!
a
i
!!
RIII
RIII
RIII
RIII
RIII
DI)
IllVY
l
1
'
Ward /db
anye on
Warnick
. gessard
7/20/81
7/33. /
q[
.
-
-
-
- -
-
-
-
- -