ML20009G750

From kanterella
Jump to navigation Jump to search
Forwards LER 81-041/03L-0
Date released: 01/23/2020 Download: ML20009G750


LER 81-041/03L-0:on 810703,discovered That Remote Reactor Coolant Temp Instrument Was Inoperable During Normal Operation.Caused by Dust & Lint in Meter,Causing Sticking at 584 F.Instrument Cleaned
ML20009G759
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/23/1981
From: Hernandez V
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009G759 (2)
Forwards LER 81-041/03L-0
ML20009G749
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/23/1981
From: Baynard P
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009G749 (1)