ML20009G719

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-382/81-15 on 810516-0615 & Notice of Violation
ML20009G719
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/10/1981
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Maurin L
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20009G720 List:
References
NUDOCS 8108040590
Download: ML20009G719 (2)


See also: IR 05000382/1981015

Text

--.

,

l'

<a

=?

.

s

r

e,

n

!

'

l0 1951

-

In Reply Refer To:

q' @ gA.

Docket 50-382/8Hl;5

l all[/Q

.

Louisiana Power and Light Company

%

UG 0 3 793l'

s.s g% ,E" *

ATTN:

L. V. Maurin, Assistant Vice

-

President-Nuclear Operations

cs

142 Delaronde Street

,

New Orleans, Louisiana

70174

'q

\\-

,j

,

'

Gentlemen:

a

This refers to the inspection conducted under the Resident Inspection Program

by Mr. G. L. Constab?e of our staff during the period May 16 - June 15, 1981

of activities authorized by HRC Construction Permit CPPR-103 for Waterford

Steam Electric Station, Unit 3, and to the discussions of the findings with

Mr. D. B. Lester at various times during the inspection.

Principal areas examined during the inspection and our findings are discussed

,

in the enclosed inspection report. Within these areas, the inspection consisted

of selective examination of procedures, drawings, representative records,

interviews with personnel and observations by the inspector.

During this inspection it was found that certain of your activities were not

1'

conducted in full compliance with NRC requirements. Consequently, you are

required to respond to this matter, in writing, in accordance with the

provisions of Section 2.201 of the NRC's "Kules of Practice", Part 2, Title 10,

i

'

i

Code of Federal Regulations. Your response should be based on the specifics

contained in the Notice of Violation enclosed with this letter.

l

l

In accordance with 10 CFR 2.790 of the Consnission's regulations, a copy of

I

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any infonnation that you

believe to be exempt from disclosure under 10 CFR 9.5(a)(4)., it is neces-

l

sary that you (a) notify this office by telephone within 10 days from the

I

date of this letter of your intention to file a request for withholding; and

(b) submit within 25 days from the date of this letter a written application

'

to this office to withhold such infonnation.

If your receipt of this letter TCPl

has been delayed such that less than seven days are available for your review,

s

please notify this office promptly so that a new due date may be established.

/

j

P,onsistent with Section 2.790(b)(1), any such application must be accompanied ///

by an affidavit executed by the owner of the infonnation which identifies the

i

document or part sought to be withheld, and which contains a full statement

of the reasons on the basis which it is claimed that the information should

be withheld from public disclosure. This section further requires the statement

I

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

8108o40590 810710

'

PDR ADOCK 05000382

l

2

-.- G

PDR

.RPS1, du ,

,RP.S p

.apBM?}..

. . I ES,

, ,I,V, , , ,

,,, ,

, , , , ,

,, ,,, ,,,,,

l

,,

,,

,,,0L[Ma@en. .,

,J.Gajf .jardo,,,J, 6. lins ..

.

. ..

....j

$=>

. LCons, ,p.1,e/,$R,,[We,stermac

. . .

..?/ /.8 1 . ..

.?/. / /.81 . . . . . 2/gh/ai...,,

'

l

. /7/.81

.....7/.881..

7

""

,, ,,, ,

, ..

. ,,

, .,,

... ...

.

NRC FORM m3 (10

OFFICIAL RECORD COPY

--

~ . _ - . _-80) N R CM 02 40, _ . _ _ _,. _ _-_. _ _ _ _ _.._...

..

.

. . . .

,

!

'

.

,

1

Louisiana Power and Light Company

2

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

O riginal Signed bya

.G. E MADSEff8

G. L. Madsen, Chief

Reactor Projects Branch

Enclosures:

1.

Notice of Violation

2.

IE Inspection Report 50-332/81-15

bcc to DMB for distribution:

l

TECH PROGRAMS

IE FILES

STANDARDS DEVELOPMENT

NRR (8 cys)

ELD

MPA

AE0D

PDR:HQ

LPDR

NSIC

bec distrib by RIV:

Louisiana Div. of Radiation Control

T. Westerman

W. Crossman

R. Stewart

WAT-3 RRI

"'c'>

... .. .. . . . .

. ....

. ..

..

.

..

.

.

. ..

.

. ... ..

.

..... . . ..

'"""^"'>

... ... ... .. ..

.

...

..........

..

.. .

..

.... ... . . . ..

.....

. ..... .

..

" * >

. .... . . ..

. .. . ...... .. ..

. ..... . . . .... .

.... .......

.. ......... . ..

.. . . . . . . . . . . . . .

... . . . . . . . . . .

" " * ' """'*'""c"

2'

OFFICIAL RECORD COPY