OFFICIAL COPY
o
UNITED STATES
[ 'j ,
"
NUCLEAR REGULATORY COMMISSION
g c-
,, e
REGION il
g[
101 MARIETTA ST., N.W.. SJITE 31')0
o,
ATLANTA. GEORGIA 30303
.....
JUL 101981
Florida Power Corporation
%
ATTN: Mr. J. A. Hancock, Assistant
S>.
%
i
Vice President
\\
-
%#I
Nuclear Operations
Q
Me3
,,
P. O. Box 14042, Mail Stop C-4
g
@g ,pf,p#
-
1
St. Petersburg, FL 33733
.,v
.-
Gentlemen:
9,
' N[$d
Q
Subject: Report No. 50-302/81-10
-
This refers to the routine safety inspection conducted by Mr. N. Economos of this
office on May 26-29, 1981, of activities authorized by NRC Operating License No.
OPR-72 for the Crystal River facility and to the discussion of our findings held
with Mr. T. C. Lutkehaus, Assistant to Plant Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within ti ese areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items.
The status of these items is discussed in the enclosed
inspection report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in W NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your inten-
tion to file a request for withholding; and (b) submit within twenty-five days
from the date of this letter a written application to this office to withhold
such information.
If your receipt of this letter has been delayed such that less
than seven days are available for your review, please notify this office promptly
so that'a new due date may be established. Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full stat'ement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
TGo/
s/f
.
810804o388 sto71o
//
PDR ADOCK 05000302
G
--
_ - , . -
JUL 101981
.
.
Florida Power Corporation
2
10 CFR 2.790(b)(4). The infortnation sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit.
If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Dorument Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sinc rely
. Kell /T3, ActTn/ Chief
~
Reactor Pfojects Branch #2
Division of Resident and
Reactor Project Inspection
Enclosure: Inspection Report
No. 50-302/81-10