ML20009G298
| ML20009G298 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 07/21/1981 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Linder F DAIRYLAND POWER COOPERATIVE |
| Shared Package | |
| ML20009G299 | List: |
| References | |
| NUDOCS 8108040103 | |
| Download: ML20009G298 (2) | |
See also: IR 05000409/1981010
Text
{{#Wiki_filter:. . . 'JUL 21 198f /fb
G{{i'f % A- Docket No. 50-409 9- , U - n u c1 0 g> IO8/ A -11 - -- Dairyland Power Cooperative 844 g%f f%sg m. [ - ATTN: Mr. F. W. Linder y General Manager Q 2615 East Avenue - South g La Crosse, WI 54601 Gentlemen: This refe .t to the routine safety inspection conducted by Messrs. W. L. Forney and M. W. 1 anch of this office on June 1-30, 1981, of activities at La Crosse Boiling Water Reactor authorized by NRC Operating License No. DPR-45 and to the discussion of our findings with Mr. R. Shimshak at the conclusion of the inspection. The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative r- srds, observations, and interviews with personnel. During this inspe ction, certain of your activ.aes appeared to be in non- compliance with tRC requirements, as described in the enclosed Appendix A. In accordance with 10 CFR 2.790 of the Commission's regulations, a cop'; of this letter, the enclosures, and your response to this letter will be placed in the NRC's Public Document Room. If the enclosures contain any information that you or yote contractors believe to be exempt from dis- closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within seven (7) days from the date of this letter of your intention to file a request for withholding; and (b) submit within twenty-five (25) days from the date of this letter a written application to this office to withhold such information. Section 2.790(b)(1) requires s *ll 8108040103 810721 PDR ADOCK 05000409 O PDR
- - - - . ___ _-- . - . . -- .. ! . . [ Dairyland Power Cooperative -2- (RJL 2 1 @81
that any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure. This section further requires the statement to address , with specificity the considerations listed in 10 CFR 2.790(b)(4). The ' information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, a copy of this letter, the enclosures, and your response to this letter will be placed in the , Public Document Room. ' j We will gladly discuss any questions you have concerning this inspection. Sincerely, t
- LJ
' . F. Heishman, Acting Director Division of Resident and Project Inspection i Enclosures: 1. Appendix A, Notice of Violation 2. IE Inspection Report i No. 50-409/81-10 cc w/encls: , R. E. Shimshak, Plant Superintendent DMB/ Document Control Desk (RIDS) Resident Inspector, RIII John J. Duffy, Chief , , Boiler Inspector ] Stanley York, Chairman ' Public Service Commission _ 1 n ' 4 i RIJ' "III RIII RIII RIII f)n'h h - )Mhh f').T Kn@& G Forney/jp Branch Warn ck Heishman 7/17/81 1/2c/31 ' . - , _ . _ _ . _ . . . }}