ML20009G157

From kanterella
Jump to navigation Jump to search
Forwards LER 81-059/01T-0
Date released: 01/23/2020 Download: ML20009G157


LER 81-059/01T-0:on 810629,valve Lineup for Loop a of RHR in Standby Readiness Was Incorrect.Caused by Control Operator Commencing Plant Startup W/O Knowing That Valve F020A Was Open.Rods Inserted & Sys Lineup Verified
ML20009G170
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/09/1981
From: Poulk R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009G170 (2)
Forwards LER 81-059/01T-0
ML20009G156
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/09/1981
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009G156 (1)