05000324/LER-1981-055-03, /03L-0:on 810614,during Test,Diesel Generator 1 Started,Then Immediately Tripped W/Concurrent Opening of Diesel Generator Output Breaker.Caused by Resistor AE8 Shorting to Ground.Resistor Replaced

From kanterella
(Redirected from ML20009G107)
Jump to navigation Jump to search
/03L-0:on 810614,during Test,Diesel Generator 1 Started,Then Immediately Tripped W/Concurrent Opening of Diesel Generator Output Breaker.Caused by Resistor AE8 Shorting to Ground.Resistor Replaced
ML20009G107
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/08/1981
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20009G094 List:
References
LER-81-055-03L, LER-81-55-3L, NUDOCS 8108030333
Download: ML20009G107 (2)


LER-1981-055, /03L-0:on 810614,during Test,Diesel Generator 1 Started,Then Immediately Tripped W/Concurrent Opening of Diesel Generator Output Breaker.Caused by Resistor AE8 Shorting to Ground.Resistor Replaced
Event date:
Report date:
3241981055R03 - NRC Website

text

NRC FORM 366 U. S. NUCLEAR REGULAT6MMO#

(7 771 tjCENSEE EVENT REPORT o e CONTROL BLOCK: l l

l l

l l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

l0 ltl l Nl Cl B l E l Pl 2 l@l 0 l 0 l - l 0 l 0 l 0 l 0 l 0 l-l 0 l 0 l@l 4 l1 l1 l 1 l 1 l@l l

l@

7 8 9 LICkNSEE CODE 14 15 LICENSE NUMBEM 25 26 LICENSE TYPE J0

$7 CAT 68 CON'T lOIII

$RCE lL @l0l5l0l-10l3l214 @l016l1l4l8l1 l@l017 ln IR lR l1 h

/

8 60 61 DOCKET NUMBER 68 69 EVENT DATE 14 75 REPORT DATE 80 EVENT DESf'AIPTION AND PROBABLE CONSEQUENCES h 10121 l During the performance of Diesel Generator Actual Loadine Test. PT 12.1.2a. No. 1 l

lal3l ldiesel generator started as required and tied to its emergency bus. E-1.

The diesel l

IOlil Ithen immediately tripped with a concurrent opening of the diesel generator output l

l O l s i l breaker.

This e.est simulates the loss of off-site power in coniunction with an ECCS l

10 is l l test signal. This event did not affect the health and safety of the public.

I 10171 l l

l 0 ls I l Technical Specifications 3.8.1.1. 6.9.1.9b I

80 7

8 9 DE CODE SUSC E COMPONENT CODE SUSC00'E SU E

l0l9l l El Elh Wh Wh lI lN lS lT lR lU lh WQ Wh 7

8 9

10 11 12 12 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION RO EVENTYEAR R EPORT No.

CODE TYPE NO.

@ y"LE R:uvg l21 8l 1l l-l l0 l5 l5 l y

l0l3 l lL l l-l W

22 23 24 26 27 28 29 30 31 32 T K N AC ON ON PL NT MET HOURS S8 IT FC B.

SUPPLIE VANUFACTURER lAl@lZl@

l Z l@

lZl@

l 0l 0l 0l 0l lY l@

lYlh lAl@

lX l9 19 l9 l@

3J 34 35 36 3/

40 41 22 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h IilcllThe diesel 1ockout logic voltane dronohn resistor. AE8 shorted to grntind c ute:ing rhn I lilil l lockout relay device, 86DB, to energize, tripping the diesel and openine the outnut I

iii7l l breaker.

The resistor, Clarostat model number VK160W75, was replaced and the PT was 1

iil3l l successfully performed. No cause was determined for the failed resistor.

Plant

_,_j

{TTT'l I documentation shows no previous history of similar resistor failures.

1 80 7

8 9 STA S

% POWER OTHER STATUS DIS O RY DISCOVERY DESCRIPTION Periodic Test l

[1 J.,5J l F lh l 0 l 8 l 0 lh!

Nd

(,,,,,Bjhl ACTIVITY CO TENT HELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE l

NA l

l s'^

U ls.J LzJ @ LzJ@l 7

8 9 10 11 e4 45 80 PER!ONNEL EXPOSURES NUM8ER TYPE

DESCRIPTION

l i l 71 1 01 01 c l@L.,Z,j@l NA l

8 PERSONNe't mu' RIES NUV8 E R

DESCRIPTION

l W IOl0l0l@l NA 7

8 9 11 12 80 LOSS OF QR DAMAGE TO FACILITY TYPE

DESCRIPTION

W l Zl@l NA l

80 8108030333 810708 7

L2_Lg.j [ yE @l ESCRIPTION@

PDR ADOCK 05000324 NRC USE ONLY ISSU S

PDR g

g,;;;

y,ggg,[

7 8 9 10 68 69

80. %

M. J. Pastva, Jr.

PHONE:i9_d.457-9 521

{

NAME OF PREPARER

?

oo LER 2-81-55 ATTACFMENT Facility: BSEP Unit No. 2 Event Date: 6-14-81 No. I diesel generator tripped as a result of a diesel lockout signal from lockout relay device, CSDB, model number HEA61B, that occurred when the lockout device relay coil became energized. Diesel lockout logic voltage dropping resistor, AE8, shorted to ground and the resulting electrical arc energized the 86DB relay coil. The device then initiated its protective function of tripping the diesel and opening the diesel generator output breaker. At no time did an actual trip condition exist which would have energized the device as designed.

Lockout relay device, 86DB, receives initiation input from any of three diesel l

protective relays:

1.

Diesel generator power directional relay, 32D (reverse power) 2.

Diesel generator overcurrent relay, 51V 3.

Loss of excitation relay, 40 An examination of the shunt resistor revealed a hole in its porcelain insulation approximately 1/16 inch in diameter. The resistor was replaced and tested for normal operation. The shunt resistors on the remaining three diesel generators were inspected with no problems ftind. A failure mode for this resistor insu-lation breakdown could not be identified. This is considered to be an isolated event.

t