UNITED STATES
8
i
NUCLEAR REGULATORY COMMISSION
REGION I
y
Q
4
631 PARK AVENUE
D
KING OF PRUSSIA. PENNSYLVANIA 19406
%, .' . . . . ,o
Docket Nos. 50-317
JUL 151981
50-318
Baltimore Gas and Electric Company
ATTN: ;ir. A. E. Lundvall, Jr.
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
Subject: Combined Inspection 50-317/81-04; 50-318/81-04
This refers to the routine safety inspection conducted by Messrs. R. Architzel
and C. Callahan of this office on February 2-March 1,1981 at the Calvert
Cliffs Nuclear Power Plant, Lusby, Maryland of activities authorized by NRC
License Nos. OPR-53 and DPR-69 and to the discussions of our findings held by
Mr. Architzel with Mr. L. Russell and other members of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Ir.spection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by
the inspector, and observations by the inspector.
Our inspector also verified the steps you have taken to correct the item of
noncomnliance brought to your attention in the enclosure to our letter dated
December 11, 1980. We have no further questions regarding your action at this
time.
Based on the esults of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as set
forth in the \\'otice of Violation, enclosed herewith as Appendix A.
These
items of noncorpliance have been categorized into the lavels described in the
Federal Register Notice (45 FR 66754) dated October 7, 1980.
You are required
to respond to this letter and in preparing your response, you should follow
the instructions in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractors)
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within ten (10) days from the
date of this latter of your intention to file a request for withholding; and
,
4--
s
/ [
8108030206 810715
PDR ADOCK 05000317
G
.
.
.
.
"
Baltimore Gas and Electric Company
2
(
(b) submit within 25 days from the date of this letter a written application
to this office to withhold such information.
Consistent with section 2.790(b)(1),
any s 'ch application must be accompanied by an affidavit executed by the owner
of the information which identifies the document or part sought to be withheld,
and which contains a full statement of the reasons on the basis which it is
claimed that the information should be withheld from public disclosure.
This
section further requires the statement to address with specificity the consider-
ations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld
shall be incorporated as 'ar as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted
above, the report will be placed in the Public Document Room. The telephone
notification of your intent to request withholding, or any request for an
extension of the 10 day period which you believe necessary, should be made to
the Supervisor, Files, Mail and Records, USNRC Region I, at (215) 337-5223.
Should you have any questions cancerning this inspection, we will be pleased
to discuss them with you.
Sincerelv,
-
Eld
ir. Brunner
Ac ng Director, DR&PI
Enclosure:
1.
Appendix A, Notice of Violation
2.
Conoined Office of Inspection and Enforcement Inspection
Report Number 50-317/81-04; 50-318/81-04
cc w/encls:
R. M. Douglas, Manager, Quality Assurance
L. B. Russell, Plant Superintendent
T. Sydnor, General Supervisor, Operations QA
R. C. L. Olson, Principal Engineer
J. A. Tiernan, Manager, Nuclear Power
R. E. Denton, General Supervisor, Training and Technical Services
.