05000366/LER-1981-053-03, /03L-0:on 810611,turbine First State Pressure Permissive Switches Found Out of Tolerance While Performing Barksdale Pressure Switch Calibr.Probably Caused by Setpoint Drift.Switches Recalibr

From kanterella
(Redirected from ML20009F540)
Jump to navigation Jump to search
/03L-0:on 810611,turbine First State Pressure Permissive Switches Found Out of Tolerance While Performing Barksdale Pressure Switch Calibr.Probably Caused by Setpoint Drift.Switches Recalibr
ML20009F540
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/02/1981
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20009F537 List:
References
LER-81-053-03L, LER-81-53-3L, NUDOCS 8107310283
Download: ML20009F540 (2)


LER-1981-053, /03L-0:on 810611,turbine First State Pressure Permissive Switches Found Out of Tolerance While Performing Barksdale Pressure Switch Calibr.Probably Caused by Setpoint Drift.Switches Recalibr
Event date:
Report date:
3661981053R03 - NRC Website

text

U. S. NUCLEAR REGULATO?.Y COMMif,SION NRC FORM 366 (7 77)

LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l

lh (PLEASE I 41NT OR TYPE ALL REQUIRED FWORMATION) e lo l t l l Gl Al El Il Hj 2l@l 0l 0l -l O l 0l O l 010 l - l 01 O l@l 4 l l l 1 l Il ll@l l

l@

7 8 9 LICENSEE CODE 14 15 LICENSE NUMtlE n 26 26 UCENSE TYPE JO 5 7 CA I $8 CON'T IoI11 3E l L j@l 01 S l 0 l 01 01 3 l 6 I 6 l@l 016 l 1 1 1 l 8 l 1 l@l0171Ol218Il l@

/

8 60 61 OOCKET NUMBER 68 69 EVENT OATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PnOBABLE CONSEQUENCES h ITTTI L With the plant in steady state operation at 1927 MWt and while performina I

HNP-2-5279, Barksdale Pressure Switch Calibration, 2C71-N003A,B and C, l

iO i3i l I o 141 l Turbine First State Pressure, Permissive Switches, were found out of tol-l lO isi l erance.

Tech Specs Table 3.3.1-1, Item 9, requires actuation at 160 psig l

10181 l

+12 psig head correction.

Plant operation nor the health and safety of I

l0l7j I the public was affected.

This is a non-repetitive event.

I I

10181 l 7

8 9 DE CODE S BC E COVPONENT CODE SUSC DE S

E IW l. Il. Al@ L.E.lO LE_j @ l I l N l S l T l R l U l@ l Sl@ [__Z_j @

7 8

9 13 11

2 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT R EVISION LER RO EVENT YE AR REPORT NO.

CODE TYPE NO.

O a&P R; l8l1l l---J i 015l3l y

l013 l l Ll

[- _,J l0 l

.,_ 21 22 23 24 26 27 28 29 30 3?

32 T

N AC O ON PL NT VET HOURS S8 iT POR B.

SU PLIE MAN F CTURER I E l@LZJ@

LZJ@

Izl@

101010101 LY_J @

lNl@

lNl@

lBl0l6l9l@,

33 34 3S 36 J/

40 43 42 43 44 47 CAUSE DESCRIPTION AND COARECTIVE ACTIONS h l i 10 l l The cause of this event has been attributed to setonint drift.

The l

I1 liI I switches were recalibrated oer HNP-2-5279 Barksdale Pressure Switch I

I li12i 1 Calibration, and functionally tested successfully oer HNP-2-3010.

I I

ml Turbine First Staae Pressure Permi,ssive Functional Test and Calibration.

I I

t i l41 1 80 7

8 9 ST S

% POWER OTHER STATUS IS O Y

DISCOVERY DESCRIPTION li is ] l El@ l 0 l 7 l 9 l@l NA l

l B l@l Performing normal surveillance.

l ACTIVITY CO TENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE NA l

l NA l

R [_Z_j @ (,,Zj@l PeRSONNet EXPOSURES OeSCRiPriON @

NuM8eR TYPE l1I7llO!0l0l@lZl@l NA l

IES PERSONNE L INJU oESCRiPTiON@

Nuu8ER [1_l,,8,.] l Ol 01 Ol@l NA l

80

- 7 8 9 11 12

'#5 usa ^#0~' ' " " @

^

E

[_119_l (_ Zj@l NA l

80 7

8 9 10 NRC UsE OND iSSuEo OESCF 8107310283 810702 05000366 NA l

lllllllIllIIl5

[.3Lo]L3181 [DRADOCK PDR 88 s,

80 ;

7 8 9 10 I

. M -367-7781 2

/

e LER No.:

50-366/1981-053 Licensee:

Georgia Power Company Facility:

Edwin I. Hatch Docket No. :

50-366

Narrative

Report for LER 50-366/1981-053 On June 11, 1981, while the plant was in steady state operation at 1927 MWt and while performing HNP-2-5279, Barksdale Pressure Switch Calibration, 2C71-N003 A,B and C, Turbine First Stage Pressure Permissive Switches, were found out of tolerance.

Switch 2C71-N003D was found to be operable and actuating within expected tolerance.

Tech Specs Table 3.3.1-1, Item 9, requires actuation at 160 psig + 12 psig head correction.

Plant operation nor the health and safety of the public was affected by this event. This is a non-repetitive event.

The cause of this event has been attributed to setpoint drift.. The switches was recalibrated per HNP-2-5279, Barksdale Pressure Switch Calibration, and functionally tested successfully per HNP-2-3010, Turbine First Stage Pressure Permissive Functional Test and Calibration, and returned to service.

Unit I uses the same type switch -for this application.

A generic review revealed no inherent problems.

i i