Testimony of Fr Allenspach & JW Gilray Re Tx Public Interest Research Group Contention AC 31.Effective Implementation of QA Programs Will Provide Necessary Assurance That Qa/Qc Criteria & Requirements Will Be Met.W/Prof Qualifications
ML20009F200
Person / Time
Site: Allens Creek File:Houston Lighting and Power Company icon.png
Issue date: 07/27/1981
From: Allenspach F, Gilray J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20009F186 List:
References
NUDOCS 8107300119
Download: ML20009F200 (25)


Text

__

07/27/81 n

UNITED STATES OF AMERICA NUCLEAR REGULATORY CCMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

)

)

HOUSTON LIGHTING AND POWER COMPANY )

Docket No. 50-466

)

( Allens Creek Nuclear Generating

)

Station, Unit 1)

)

NRC STAFF TESTIMONY OF tREDERICK R. ALLENSPACH AND JOHN W. GILRAY RELATIVi TO TECHNICAL QUALIFICATIONS

[TEXPIRG AC 31]

Q.

Will you please state your full name, job title, and specifi-cally, your responsibilities relative to the Allens Creek Nuclear Ganerating Station (ACNGS).

A.

My name is Frederick R. Allenspach and I am a Management Engi-neer in the Licensee Qualifications Branch, Division of Human Factors safety, Office of Reactor Regulations, Nuclear Regulatory Commission.

In that capacity, I reviewed the proposed managerial organization of HL&P relative to tha Allens Creek Nuclear Generating Station.

My name is John W. Gilray and I am a Principal Quality Assurance Engineer (Nuclear) in the Quality Assurance Branch.

In that capacity I have reviewed the quality assurance (QA) program for the construction of ACNGS.

Q.

Have you prepared a statement of your educational and professional quali fica tions?

B107300119 810727

~~

PDR ADOCK 05000466 PDR

-?-

A.

Yes.

Q.

Are the statements attached to this testimony?

A.

Yes.

Q.

What is the purpose of this testimony?

A.

The purpose of this testimony is to respond to TEXPIRG AC 31 which basically alleges that, based on experiences at the South Texas Project (STP), the Applicant is not technically qualified to design and construct ACNGS. This testimony is divided into two distinct parts.

First, the testimony sponsored by Mr. Allenspach will describe the Applicant's (HLAP) current plans for its management and organizational structure to carry out the design and construction of ACNGS.

Secondly, the testimony sponsored by Mr. Gilray will describe and assess the QA organizations and programs developed by HL&P, EBASCO and GE to be implemented to ensure proper engineering and construction activi-ties consistent with established requirements and criteria.

Q.

Mr. Allenspach, did vou review and assess the Applicant's management and organizational structure as part of the Staff's safety evaluation?

A.

Yes. This review and assessment was specifically developed as input to the Staff's Safety Evaluation Report (SER) Related to the Construction of Allens Creek Nuclear Generating Station, Unit 1, Supple-ment No. 3, NUREG-0515 (July 1981).

It is based on the information I

submitted in Section 13.1 of the Applicant's PSAR through Amendment 59 and supplemental information submitteu in response to Item II.J.3.1 of l

l NUREG-0718, " Licensing Requirements for Pending Applications for Construction Permits and Manufacturing License," (March 1981).

It is t

. also based on discussions with several key members of IIL&P. Accordingly, my substantive testimony will incorporate my review of this subject matter as set forth in the SER, NUREG-0515, Supp. No. 3, Part II.J.3.1.

That SER input is attached to this testimony and constitutes part of my substantive testimony.

Q.

Is this the same maragement and organizational structure of the Applicant that existed prior to its experiences at STP?

A.

No. Subsequent to the problems at STP, HL&P implemented a major reorganization to provide better management control of its nuclear projects.

Specifically, HL&P changed its organization to establish a senior corporate officer, an Executive Vice President, in charge of the nuclear program. He is responsible for all nuclear activities within HL&P related to design, engineering, construction, nuclear fuel, opera-tion and quality assurance and he reports directly to the President and Chief Executive of HL&P.

Prior to this organization change, this particular senior corporate officer was responsible for both nuclear and fossil projects. The current Executive Vice President - Nuclear Project is presently devoting his attention almost exclusively to nuclear matters pertaining to the design and construction of both STP and ACNGS.

Within ti.e new organization, HL&P has established the Vice President Nuclear Engineering and Construction which it has filled with an individual with over 10 years of experience in this fir.id.

The Staff believes that this organizational change does provide better managemelt control over HL&P's nuclear projects.

Q.

Is there an HL&P Allens Creek project group separate and distinct from the HL&P STP project group?

. r A.

Yes. As can be seen from the attached organizational charts, the organization reporting to the Vice President Nuclear Engineering and Construction consists of the Manager South lexas Project, Manager Allens The Creek, Manager Nuclear Services, and Manager Nuclear Licensing.

Manager Allens Creek has responsibility for the design, procurement, and construction at ACNGS. Thus, control of the architect / engineer (AE) and the designer and fabricator of the nuclear steam supply system (iiSSS) at ACHGS is totally separated at the project level fraa these activities at STP.

Q.

Mr. Gilray, are you aware of any ott.er significant action HL&P has taken to strengthen its managenent capability subsequent to the STP problems with respect to QA programs?

A.

Yes. The overall QA programs of HL&P have been revised to include improved controls and procedures to provide a more effective These controls include nanagement system in carrying out the program.

(a) increasing the QA and QC organizations' responsibilities and authority in day-to-day site activities and in stop work actions; (b) increasing tne training and qualification prograus for site personnel; (c) modifying the system for identifying nonconformances and initiating and verifying corrective actions to assure timely and effective control of deficiencies; (d) establishing a trend analysis program for systermatic review of non-conformances, corrective actions, audit deficiency reports, engineering design deficiencies, and vendor nonconformances to determine where in-vestigative and corrective actions are necessary; (e) improving the field design change program by increasing and assigning an increased qualified engineering staff at the site for the timely analysis and independent

=

J review and-verification of design changes; -(f) increasing as-built control of the design change activity at the site; and (9) revising the audit programs by increasing the auditing skills of the audit staff and by enhancing the audit activity in the review of records and direct observa-tions of work being' performed to assure procedural adherence and compliance with the QA program.

In addition, the criteria established in NUREG-0718 as a result of the review of the accident at THI-2, have been met by HL&P's, EBASCO's, and GE's QA organizations and programs.

In particular, these QA programs have been established based on consideration of:

(a) ensuring independence of the organizaticr. performing checking functions from the organization responsible for performing the functions; (b) performing quality assurance / quality control functions at construction sites to the maximum feasible extent; (c) including QA personnel in the documented t

review of and concurrence in quality related procedures associated with-design, construction and installation; (d) establishing criteria for determining QA programmatic requirements; (e) establishing qualification requirements for QA and QC personnel; (f) sizing the QA staff commensurate with its duties and responsibilities; (g) establishing procedures for f

maintenance of "as-built" documentation; and (h) providing a QA role in I

design and analysis activities.

Q.

Has the Staff reviewed the QA programs of HL&P, E8ASCO and GE7 A.

Yes. These QA programs and our review of thea are set forth in detail in the attached SER input to HUREG-0515, Supplement No. 3 in response j

to Item I.F.2 of NUREG-0718.

Q.

What is the Staff's conclusion regarding these QA programs?

'l 1

. A.

The Staf f finds that these QA prograints and organizational arrange-ments of HL&P, EBASCO and GE will enable HL&P to conduct an effective QA prograra at both the site and the corporate level for the Allens Creek Project. We believe that the effective implementation of these QA programs will provide the necessary assurance that QA/QC criteria and requirements will be met.

Q.

In either of your opinions, does the fact that HL&P has never desioned and constructed an operating nuclear power plant, alter your conclusions that the Applicant is technically qualified to design and construct the proposed facility?

A.

Ho.

I

II.J.3.1 ORGANIZATION AND STAFFING TO OVERSEE DESIGN AND CONSTRUCTION Position Applicants shall describe their program for the management oversight of design and construction activities.

Specific items to be addressed include:

(1) the organizational and management structure which is singularly respcnsible for i

(2) techni al the direction of the design and construction of the proposed plant,ls of the resources which are directed by the utility organization, (3) detai interaction of design and construction within the utility organization and the manner by which the utility will assure close integration of the Architect-Engineer and nuclear steam supply system vendor, (4) proposed procedures for handling the transition to operation, and (5) the degree of top level management oversight and technical control to be exercised by the utility during design and construction, including the preparation and implementation of procedur,es necessary to guide the effort.

Draf t NUREG-0731, " Guidelines for Utility Management Structure and Technical is the keystone for similar development of guidelines for this Resources,"at task.

Therefore, the principal applicable elements of NUREG-0731 shall be used by CP and ML applicants in addressing this task.

Applicants shall submit detailed information in order to~ provide reasonable assurance that the requirements will be implemented properly prior to issuance of the construction permits or manufacturing license.

Discussion The applicant should establish an organizational structure which will be singularly responsible for the overall management and technical support for the project.

Key characteristics of such an organization should be:

(1) Integration of all necessary responsibilities under a single responsible upper executive position.

(2)

Ihe individual in charge of all nuclear functions should be a senior level executive in the corporation.

(3) The lines of authority to the upper level executive position should be clear and communications channels delineated.

II-25

The c,wol/ J ma onGr the upper level executive should have the f ol hr4ing duties ind r mpansibilities for the proj et.

(1) Lvi >w and ;pproval of the design criteria of the nuclear steam '.upply syste n v ndor and architect engineer.

j (2) Review and approval of principal plant design features, i

I (3) Review ad opp, oval of safety analysis reports.

(4) Coordination of licensing activities with the NRC.

(5)

Review and audit of principal contractors' job management.

(6) Development and impleaentation of a quality assurance program covering utility and contractors, including engineering design review.

(7) Feedback of operatir maintenance, ar.d inspection experience from industry.

The applicant has the responsibility for the overall design, construction, and operation of the Allens Creek Nuclear Generating Station.

HL&P has established an integrated organization under the Executive Vice President, Nuclear Project to implearnt this responsibility.

The Executive Vice President, Nuclear Project, reports to the Presimot of HL&P.

The organization reporting to the Executive Vice President, Nuclear Project, is shown in Figure 4.

The organization reporting to the Executive Vice President, Nuclear Project, consists of the ihnager, Quality Assurance; Vice President, Nuclear Engineering lad Construction; Vice President, Nuclear Operations; and Director, Nuclear Fuels.

The Manager, Quality Assurance, has the responsibility for the quality assurance program.

The Vice President, Nuclear Operations, will have the responsibility for operating and maintaining Allens Creek and the South Texas Prcj.c after the operating license is is;ued.

The Director, Nuclear Fuels, w;il have the responsibility for deliverily and utilizing nuclear fuel.

As shc.n in Figure 4, the organization reporting to the Vice resident, Nuclear

{

Engineering and Construction, consists of the Managar, South Tens Projal;

{

the Manager, A.1 ens Creek; the Manager, Nuclear Services; and the "anager,

[

Nuclear Licensing.

The Manager, Allens Creek, has N responsibility for i

l Allons Crwk d ' sign, procurement, and constru.. icrt rie "inager, Nuclear T.ervic", provies,ogineering support for nuclear engineering and for corporate l

health physirs.

The Managr r, Nuclear Licens ing, is responsible for providing l

liron > ing support t n t he A71rns Creek Manager.

Other departments within HL&P.

l s uc h.n; the % er Plant Engiovering and Systens fnginsering, provide engineering

. uprm t t o the Ali or, Cre< Project Fn r ing '4 m egor.

o The ruti ot l Lil > Lafi ing level for the Ailans C:r ek pcojact engia a ing,

ual i ty

.ur xe md qs r tions ;rgani/atir.ns is bout 32 individuals.

.M (P

reject s. incr asing this r.taber at the start of construction at about 56, includirg c mtmetion. m 7.rmot individua l s, nd paaking at ibnut 312 as the

[

peraticns 9rva ';uibfs up yhen the unit is

.arly e mp19te.

In.!dition, a l

eide we af '

Lair 11 g:rtisa u ists ' i thin t '.e wr;.ra te orr in i ot ion i

l' 95

I l

ll1'1l I

j A

T N

E R R RR G D

T U5 i O A5 E A N P 1 l C T

i EL GE5 sE C LE AL N OE sJ i I R H oO E CU NCE G PfH RuF AUC E

P D h MNu CIV tr

]

A a

h T

T C

N N

S n

E E E

VDE ID R N RRS O

I C

A OI EA E TI S N S E T GE Ci t

i m

UE E

a A

L A AL v CR R C NC R z

N R

E EP i P U AU i

E E

n X E f E N P MNS a

CI CI O

g V

V r

O

no A

ita

/

t S

T T

& N g

T N

N E E E

G OI R

i.n N

VD T

D R NT S

t E

AI C D

I I

C 4 ER G N K a

E T

5 E

e U

E r

I U

E LE E

I S

C HCt R A

E e

L N

R n

T L

E E

PUh A A C e

l x

i S f

EN GN M

G P

E i

C NO IV LC rae lcuN ke j

A e

r T

C N

S EE A

s R

R MT n

VD M I t E

E EC e

TsE G

G A

TE l

UE T A

A J

l E P Y N G CRS Nt O A

t f R X

E A

A E

M Mur E C O

4 I

S V

e ru g

iF T

N E

ETG C

E 0

I P

4 AN f

U5R I

F N

OE O N C

R H P T

P A

G R

E I

L EO P H

8 CC K

H I

I O

V j b

^ 7NN

covering all the major engineering disciplines, plus some of the more highly specialized fields.

If a technical issue should arise that is beyond the scope of HL&P's engineering capabilities, the applicant has the option of obtaining services of outside experts to assist in resolving the issue.

Ebasco was selected to perform the architect-engineer services and construc-tion management services.

The applicant monitors and evaluates Ebasco's performance of these services by requiring Ebasco to obtain HL&P approval of the basic design criteria and selected design documents.

Further, the applicant

, laces the purchase orders for all equipment based on Ebasco generated and

.fL&P-approved specifications.

GE is responsible to HL&P for the design and fabrication of the nuclear steam supply system, including the preparation of design documents and procurement of related hardware.

GE prepares system descriptions and other selected design documents for both HL&P and Ebasco.

HL&P monitors and evaluates GE performance by review of these documents.

Ebasco reviews these documents to ensure interface coordination between the nuclear steam supply system design and the Ebasco-designed plant features, subject to the applicant's quality assurance surveillance.

GE prepares interface criteria; safety analyses; other design information; test procedures, maintenance and operating procedures; and technical support for the nuclear steam supply system installation.

All correspondence among HL&P, Ebasco, and GE which affects the design interface is processed by each of the parties accordir3 to internal procedures.

Periodic audits between Ebasco and GE are held to provide assurance that design interfaces are met.

HL&P participates in these audits.

Within HL&P, the Manager, Allens Creek has full authority to implement action to achieve project goals, and all contractors and HL&P team members, except Quality Assurance, are under his direction.

The Allens Creek Project Organi-zation, as shown in Figure 5, is made up of individuals assigned to the project from the several line or functional departments.

The organization consists of a manager and a support team of engineers and other professionals whose only function is to manage the design, licensing, procurement, construction, and startup of Allens Creek.

The Manager, Allens Creek reports to the Vice President, Nuclear Er.gineering & Construction. The individuals assigned to the project bring with them the necessary authorities and responsibilities to act on behalf of the departments they represent.

This allows the project organi-zation to function as a coherent unit, with decisions being made at the appropriate levels.

The transition from the design and construtt. ion phase to the operational phase will be facilitated by the organizational frangement under the Executive Vice President, Nuclear Project.

The Nuclear Q erations group has had full time individuals assigned to the Project Engint.ering team since design began to ensure that o r ational aspects are factored into the plant.

HL&P intends to furnish the operating staff with ample lead time for them'to learn the plant design and oper+ + '

The Nuclear Operations group will be deeply involved in the preoperational, hot functional, and startup testing.

The Nuclear Services organization responsible for reviewing and approving plant design will continue as the technically cognizant expert resource when Allens Creek operates, performi g the same functions of engineering support as it does now for the South Texas Project.

Since the HL&P Project Engineering Organization wili be physically located at the site during construction and II-28

\\

11lll11

\\

4

/

A R

R T

E E

C G

G E A A A J

A N Q O Q N A

R A

M P

M

'/

GNH T 4 E C1 E A G n

H A o

JO C N i

t H NA a

P UM in z

P l

ag e

ro N /

t O

c iR e

TT j

E CC O

G r

EU J

A P

OR N T

R SA P NM

n O

O C

i ta

/

t S

T &N

/

N O

G g

E G I R

N R i

n RNT TI D

5 I AIC E

K CH a

I E

t SERU G N E E t G r

E A

E J E A ELE e

H L

ICE N

R ONN t

L n

T A A C HI A PUNS M

PG M e

ENIN N

G G

CI EC a

NO E

r V

e lc

/

u 8

N L

k O'

e I

e r

T C

I" s

0C ne l

lA

/

5 S

TL R e

E t

CO G

u E H g

J A

i T

O N N F

R O A P Cm E

C N

/

1 O

Y T

I n O

E T TO T

C As I

E Hi Tv E1 S

JO1a 01 O

H NP N

i g 1

I u

Ms D

Jd A

l yW tl ltlt'

'l

startup, the individuals in that organization will have excellent familiarity with the equipment.

These individuals will be ' basic resource for-actual transfer to the operations or engineering support groups.

The staff has reviewed the applicant's organization with respect to its structure, technical resources available to work on the Allens Creek Project, qualifications of key personr.el in the nuclear organization, and the planned involvement of the management in the design and construction of the Allens Creek plant, as described in Amendments 57 and 59 to the Allens Creek PSAR.

To get a better understanding of how the organization functions and to gain a feeling for the responsibilities and attitudes of the individuals, several members of the staff met with key individuals of HL&P in Bethesda, Maryland, 19 These individuals were the Vice President, Engineering and onMay21}cn;81.the Manager, Quality Assurance; the Manager, Allens Creek; and Construct the Manager, Nuclear Licensing.

Conclusions On the basis of NRC review of the applicant's organizational structure, the qualifications of key personnel, its technical resources, and the degree of top level m=nagement oversight and technical control, the staff concludes that ization md staffing meet requirements of Item II.J.3.1 and that o'

'se resou-ces and management capability to oversee the design and t

cs.cruct. ion of the facility.

II.K.1.22 0ESCRIBE AUTOMATIC AND MANUAL ACTIONS FOR PROPER FUNCTIONING OF AUXILIARY HEAT REMOVAL SYSTEMS WHEN FEEDWATER SY5 TEM NOT OPERABLE I

Posit br.

Applicants with BWR plants shall design auxiliary heat removal systems such that necessary automatic and manual actions can be taken to ensure proper functioning when the main feedwater syster.1 is not operable.

A general explana-tion of how this requirement will be met is required prior to issuance of the coastruction permits.

Sufficient detail shall be presented to provide reasonable

?ssurance that the requirements will be implemented properly.

Discussion The applicaat states, in the PSAR, that the plant design requires no immediate manual action to mitigate the consequences of a loss-of-feedwater (LOFW) event.

In order to support this assertion, the applicant discusses the operat-ing sequence and possible operator actions for three events in which an LOFW occurs:

(1) LOFW, (2) LOFW and stuck-open relief valve (50RV),

(3) LOFW with HPCS/RCIC inoperable (HPCS--high pressure core spray; RCIC--

reactor core isolation cooling) 11-30

\\

\\J l.

In all these cases, the water level in the reactor vessel drops to the alarm point (level 4--approximately 200 inches above the top of the active fuel (TAF)),

then to the point at which reactor scram occurs automatically (level 3--

approximately 180 inches above TAF), and then to the level at which both the HPCS and RCIC systems would be activated and the recirculation pumps are tripped (level approximately 2 to 120 inches above TAF).

All of these actions occur in about 20 seconds.

In cases 1 and 2 (with RCIC and HPCS available), the level continues to fall to a minimum of about 80 inches above TAF before the RCIC and HPCS systems start to pump water into the reactor, raising the water level to the point at which the HPCS and RCIC systems shut off automatically (the HPCS continues to operate on " bypass"--no water injected into reactor vessel--and will react automatically to a low level (level 2) initiation signal unless previously shut off by the operator.)

The injection of cool water by the RCIC and HPCS systems will cause a pressure reduction in the reactor vessel which will result in a low pressure isolatioh signal.

After the HPCS and RCIC systems stop injecting water into the reactor vessel, the system pressure rises to the set point at which the lowest set relief valve opens to prevent overpressurization of the primary system (this is the end of the applicant's narrative for case 1).

In case 2, it is assumed that the relief valve opens and sticks in the open position, causing the system to depressurize to the point at which the shutdown cooling system may be put into operation (end of narrative for case 2).

The appilcant, for case 3, notes that the water level continues to drop from level 2 to level 1 (approximately 40 inches above TAF)--at which level the low pressure ECCS systems, low pressure core spray and low pressure coolant i @ ction systems start.

However, manual (operator) action would be required to depressurire the primary system by means of relief valves or the automatic depressurizatiorf system to permit use of the low pressure ECCS systems.

For the case 3 event, the applicant assumes that the operator will start to depressuriz? the primary system when the water level in the reactor vessel drops to.evel 1.

The applicant has agreed to provide procedures for the use by the operators to mitigate loss-of-feedwater events and to provide a summary of these procedures in the FSAR.

Conclusions The staff finds the information and commitments provided by the applicant to confarm with the information requirements of Item II.K.1.22 and concludes,.

therefore, that the applicant's response is acceptable.

II-31

s 5

I. F. 2 DEVELOP MORE DETAILED QUALITY ASSURANCE CRITERIA Position Applicants shall describe the changes to their QA programs that have resulted from their review of the accident at TMI-2.

In addition, applicants shall address the appropriate matters discussed in this Action Plan item, including the establishment of a quality assurance (QA) program based on consideration of:

(a) ensuring independence af the organization performing checking func-tions from the organization responsible for performing the functions; (b) per-forming quality assurance / quality contial functions at construction sites to the maximum feasible extent; (c) including QA personnel in the documented review of and concurrence in quality related procedures associated with design, construction and installation; (d) establishing criteria for determining QA I-8

4 programmatic requirements; (e) establishing qualification reouirements for QA and QC personnel; (f) sizing the QA staff commensurate with its duties and responsibilities; (g) establishing procedures for maintenance of "as-built" documentation; and (h) providing a QA role in design and analysis activities.

Applicants shall submit, prior to the issuance of the construction permits or manufacturing license, a revised description of their QA program that includes confideration of these matters.

4 Discussion (a) The "neston Lighting & Power Company, Ebasco Services Incorporated. and the eral Electric Company organizations are shown in Figures 1, 2, and 3, respectively.

HL&P has established a Project Quality Assurance Group to direct and inanage the overall site quality assurance program.

The d

group oversees the various disciplines (mechanical, civil, and electrical),

procurement, and quality systems to determine the QA program requirements and to ensure adequate implementation of HL&P's, Ebasco's, and GE's quality assurance programs.

The HL&P, Ebasco, and General Electric QA organizations are on an equal organizational level as those line managers responsible for engineering, procurement, and construction.

Ebasco's and GE's quality assurance programs provide organizational arrangements whereby the quality assurance and quality control orgarizations have the authority and responsibility for inspection and verification functions.

Wi'h regard to onsite construction activities, the Ebasco quality control engineers are responsible for the inspection and verification functions to ensure conformance to design, specification, and QA program require-ments.

This arrangement provides the necessary independence from cost and schedule and from the organizations having direct responsibility for i

the work being inspected and verified.

(b) The HL&P Project Quality Assurance Manager (see Figure 1) will be located at the construction site and will be responsible for directing and managing i

the site quality assurance program and quality-related site activities, i

These include programmatic direction and admir.istration of the policies, j

goals, objectives, and methods as described in the Project Quality Assur-ance Plan.

Programmatic direction includes establishing the QA program l

requirements and ensuring the adequacy of the quality assurance program for HL&P and its prime contractors.

The Project Quality Assurance Manager reports to the offsite Manager, Quality Assurance, who reports to the Executive Vice President.

The Project Quality Assur

'e Manager and his staff have appropriate organizational position responsibilities and authority to exercise proper control over site quality activities.

They are free from non quality assurance duties and can thus be dedicated to l

ensuring that the site qtality assurance program is being effectively implemented.

i Ebasco's Quality Program Site Manager (see Figure 2) reports to Ebasco's offsite Chief Ouality Assurance Engineer.

The Quality Program Site I

Manager and his staff's responsibilities include:

reviewing and auditing quality-related site construction engineering activities; reviewing site generated purchase orders for inclusion of quality assurance require-ments; planning and performing site construction inspection activities; identifying and initiating correction of nonconforming conditions; estab-l lishing and enforcing quality control documentation and inspection require-ments; performing or monitoring of site nondestructive examination, I-9 I

mn-

,,#,..m

..,--.-~,,-----,..-,-.,,,,-,...e,,.-.,-,

,,m

.-,c.

,r

,--~,-e, e

EXECUTIVE VICE PftEsIDENT I

l Q A AUD6T5 & 1ECHhlCAL SERV 4CES MANAGER i.

vict PRE $iDENT QU ALITY

(

, vgNDOR SURVE LLANCE LIMIC T OM sesCtl AR EPeGihtLR9eG NuCLt AR h

SU AN El AND CON &ipuCitON fut48 I.

l t

- PMOJECT Q A (MECH AN4CAbfClV sL') ELECT A4C AL)

PHOJEC T MANAGER PPwtCT OUAlliV A&50AANCf M

- PMOCUMEMENT Q A -

ALtth$ ChitK souct t AM M AN AGE R (SITE)

PROJECT

- QUAL 8TY SYSTEMS 70tL d'

{

JL

($ASCO MAfgAGEMENT I

I l

"E F "#L8" PAGJACT A55U A &

GE V4 MANAGER MANAGEMENT p

4 a

l I

GE-NP60 Gt-Nf&&O MANAGEMENT MA8eAQtMENT 4

QA46NilOf m ehsCAT40N i

a PaoatCT DNes of C=iN4CATeom 4

I I "

1 I

i PROJtCT Pa ast C T, A 55un ANCE A&&uMANCE g,

MAseAG4.R MANAGtA A

4 o

o I

Houston Lighting 5 Power Company, Allens Creek Nuclear Generating Station, Unit l$ External QA relationships Fiuurei t

~

j J

S e

3 s

11 l! !

I C

.23~

C fi

-j!i 3

is i

j

ig

=!

g!!

i o

s iii

=

r=

'E

.r

=

GI tll

  • b:i b

3 *ill

-l

_s
s s 3

11'I ilii.

a.

I a

c j

i

.1 2

Ij!

7

.I I

.g g c:

isi 5--8

-j i {ns.

i:e s I;i r

a

!!i 1:3 a

i;3 i!!:

1 8i 11 sj =

ist t
8 o

's I 2]

l l

8 E..

,j

[ j.

r 2

E!k i:

?,l!!

.,1!

., n! :

~

o 8:l, jili

=

11 jl==[

i.

5 1-3 3j w

n i

s iE h

'W 4:a

i
1 al 1

1 I-ll

O O

/

1 m

-:ji-)p i

5 s.sf :*l i;3
1 l3lt1 83 ln all

-li l1:1 a

2 e

2 5fl I i I5 j

if'!i;

!$3lI

~~

a i35ial f!}ll I t f

.5 s.

'c w

i.b,. l sgl isuj

'2 811*r I

31 8

I 5

n l

!!-Il ii!

l illl la!

i g

I a.

c

. ;= !, 3

!,pe e

g 2

=.

e ileil 1;ji 1.1 g

r e

a

fet, 2,l j

$3 3

z

.5

jjiII ig

--o-ij!-

1 jg31 1,1 3: I g

f U

". II 5

5 $

f :.

o 5::185 3;i e

8

.s o

i i

I O

8 9

sg:l..

~

3 v

.w I

  • I iiiili se::
gfi

$a i

9 i:P

t; -

-111 a

lijk lill Ili!

o*

i g

a-l m

u i

!!,115; i

3m i

i ijijjil l

i!11i a

.i i

,0=

i lja}l:i

  • "i I

I 3

c. C

{e

. tes I

g:..

e.-

at: -}

elegj 1

23 c.

li s s,ii.

d,i ii i

ibi!

i!!il lii11

.i g

$1Ssni

-2 I

I

$2 m.p laM e 4 o

I

! j,. e

.i l

,jI_iln i1 sE I

_ * 'j i

t.s

\\

ea

@ C ow g

, III*

sjj g!;l I

3,y IlI!

}-i

}Ill l b g it i

3 L. _ I!g,!!:

i u.

a l

15
t
s a-5lI l!

!!I I

I-12.

soils, and concrete testing activities; identifying and controlling the quality status of items; developing, establishing, and implementing a system for collection, storage, and maintenance of quality assurance records at the site; evaluating of the suppliers' quality assurance programs; and qualifying and certifying personnel as required by applic-able codes and standards.

The HL&P Project Quality Assurance staff will be involved in day-to-day plant activities important to safety; that is, the quality assurance organization will routinely attend and participate in daily plant work schedule and status meetings to ensure that they are kept abreast of day-to-day work assignments throughout the plant and that there is adequate quality assurance coverage relative to procedural and inspection controls, acceptance criteria, and quality assurance staffing and quali-fications of personnel to carry out quality assurance assignments.

Both HL&P's and Ebasco's onsite QA and QC organizations will report offsite and will sufficiently free from non quality assurance duties to ensure that the quality assurance program at the plant site is being effectively implemented.

(c) Provisions will be estabiished by HL&P to ensure that. quality-related procedures necessary to implement the quality assurance program are properly documented and consistent with the mandates contained in the PSAR.

The corporate Nuclear Quality Assurance Program Manual require <,

the establishment of the Project Quality Assurance Plan for the design and construction phase of the project.

The Project Quality Assurance Plan requires the establishment of implementing procedures to comply with each of the 18 criteria of 10 CFR Part 50, Appendix 8, and also requires Ebasco to submit all procedures which control quality activities to HL&P Project Quality Assurance for review.

The Executive Vice President reviews and approves the Project' Quality Assurance Plan.

The President of Ebasco Services Incorporated mandates the companywide use of the policies, procedures, and manuals that make ur the Ebasco Quality Assurance Program.

The corporate Quality Assurance Manual repre-sents the Ebasco Quality Assurance Policy and requirements for the desh;n and construction phase, and it is designed to be in conformance with tne requirements of 10 CFR Part 50, Appendix B.

The Quality Assurance Manual is prepared by the Quality Assurance Engineering Department and approved by the Quality Program Committee.

Implementation and administration of the Quality Assurance Program is the responsibility of the Vice President, Materials Engineering and Quality Assurance.

The General t'ectric Nuclear Energy Product and Quality Assurance Opera-tion staffs responsible for establishing the Nuclear Energy Business Group quality, elated policies and instructions for the various func-tional organizations shown in Figure 3.

The Manager, Product and Quality Organization, is responsible for communicating with the quality assurancc organizations and specifying how they are to comply with the quality-related instructions and procedures.

The Senior Vice President and Group Executive has established a Quality Council, chaired by the Manager, Product and Quality Assurance Operation and consisting of quality assurance managers responsible for each of the major organizations within the Nuclear Energy Business Group to provide communications in order to ensure total quality I-13

system coverage, consistency, and continuity.

GE has established and implemented an overall quality assurance program to encompass all activi-ties within their areas of responsibility and services provided for the facility.

The QA organizations of HL&P, Ebasco, and General Electric are required to be involved in the review and concurrence of quality related pro-cedures to assure they contain the necessary quality requirements.

(d) The HL&P Project Quality Assurance Group and the necessary technical organizations participate early in the quality assurance program defini-tion stage to determine and identify the extent that quality assurance controls are to be applied to specific structures, systems, an' components.

For those items determined to be important to safety wht.e the specific quality assurance controls cannot be imposed in a practical manner, an evaluat' ion will be made to determine special quality verification require-ments to be applied during installation or testing to provide the necessary assurance that the item (s) meet project requirements.

In addition, implementation reviews such as interviews with personnel performing the activity, observations of work in progress, and reviews of final work will be performed by HL&P quality assurance personnel to evaluate the effectiveness of the quality assurance program.

The project QA organization participates in defining the scope of the inspection program.

Procedures provide criteria for determinino the accuracy requirements of in.'pection equipment and criteria for determining when inspections are required or define how and when inspections are performed.

The apolicant's Quality Assurance Plan requires that Euasco and GE pro-vide a program for inspection, including the establishment of witness and mandatory inspection hold points beyond which work may not proceed until inspected by a designated Inspector.

Quality verification inspection, witness of testing activities, and evaluation of test results are performed by individuals in the Ebasco Project Quality Assurance / Quality Control organizations who report to the Ebasco Quality Program Site Manager.

These individuals do not have direct responsibility for performing the work being verified.

Quality verification actisities will be performed'in accordance with inspection documents which Save been prepared by the Site Quality Assurance group based upon the quality requirements contained in purchase orders, speci-fications, quality control documents and procedures, and applicable codes and standards.

General Electric requires inspection of materials, equipment, processes, and services to be performed in accordance with established quality assurance procedures or instructions by qualified quality control person-nel who are organizationally independent from the personnel who performed 1-14

l fthe work.

The documented quality assurance plans, procedures, or instruc-tions are reviewed and approved by quality assurance personnel and specify mandatory inspection points beyond which work cannot proceed wilbout inspector action.

Inspection results are documented and evaluated by quality assurance personnel before release of an item to ensure that inspection results have been satisfied.

(e) The quality assurance programs of 11L&P, Ebasco, and General Electric (with the exception of two alternate positions which are acceptable) comply with Regulatory Guide 1.58, Rev.1, " Qualification of Nuclear Power Plant Inspection, Examination, and Testing Personnel,"17 and Regulatory Guide 1.146, " Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants"is for the construction phase of the Allens Creek project.

The applicant requires that an indoctrination and training program be a:tablished for personnel performing quality-related activities to assure they ha,e appropriate knowledge of the quality assurance program and achieve and maintain proficiency in implementing procedures in the area of assigned responsibility.

The indoctrination and training program includes:

Proficiency tests given to personnel performing and verifying activi-ties affecting quality.

Acceptance criteria are developed to deter-mine if individuals are properly trained and qualified.

Certificate of qualifications clearly delineating (1) the specific functions personnel are qualified to perform, and (2) the criteria used to qualify personnel in each function.

Allens Creek Project Quality Assurance is responsible for the verifica-tion of the proficiency of Ebosco and GE quality assurance personnel.

(f) The size of the applicant's quality assurance / quality control staff is based upon the project schedule and is reviewed and revised as the pro-ject schedule changes to ensure that sufficient staffing exists prior to performing quality-related activities.

Upon commencement of major construction at.tivities at the site, desig-nated HL&P and Ebasco quality assurance personnel will be involved in day-to-day plant activities important to safety; that is, the quality assurance personnel will routinely attend and participate in daily plant work schedule and status meetings to assure that (1) they are kept abreast of day-to-day work assignments throughout the plant, (2) there is adequate quality assurance coverage relative to procedural and inspection controls, acceptance criteria, and quality assurance staffing and quali-fications of personnel to carry out quality assurance assignments.

The Project Quality Assurance Plan requires that HL&P, prime contractors, and subcontractors develop, accument, and implement an audit system and report the audit results to the HL&P Executive Vice President as to the status and adequacy of the quality assurance program they are executing.

The audit system, coupled with implementation reviews and regular manage-ment assessment and review of the effectiveness of the quality assurance I-15 l

program, determines whether sufficient staf fing at quality assurance /

quality control personnel exists to. implement an effective quality assurance program.

(g) The Project Quality Assurance Plan and implementing procedures require HL&P, Ebasco, and General Electric to estatilish and implement procedures to control the issuance of documents and changes to those documents.

Included in the list of documents are as-built drawings and records to assure identification of actual plant design configuration in a timely manner.

Project procedures will provide measures to indicate as-built configurations, including review and reissuance of drawings when changes occur.

(h) The applicant has contracted with Ebasco and General Electric to perform the design, engineering, and design verification.

Ebasco's Engineering Department Organization is responsible for establishing and translating design criteria into specifications and drawings and design verification.

Quality Assurance Engineering performs independent reviews of specifica-tions and drawings to ensure that quality assurance requirements such as inspectability, required performance tests, and control of measuring and test equipment have been included.

HL&P's offsite quality assurance personnel perform audits of Ebasco and General Electric to assure that design controls, requirements, specifications, and documents are in accordance with design control criteria.

In addit';n, the onsite Project Quality Assurance g oup performs implementation reviews to ensure that work is accomplished in accordance with design requirements and that field changes are processed according to design control criteria.

The General Electric Nuclear Energy Business Group engineering organization, in the respective disciplines, is subject to the Nuclear Energy Business Group design control system consisting of controlled design manuals and standards specifications affecting items important to safaty.

Quality assuran:e personnel within the various engineering organizations are responsible for assuring that the verification of design is accomplished either through independept design review, the use of alternate or simplified calculational methods, or by the performance 'of a suitable testing program.

Quality assurance personnel are also responsible for providing quality planning for engineering to def:ne quality assurance program and audit requirements and for the review, approval, and distribution of design documents, including changes to those documents.

Conclusion The staff has reviewed the applicant's QA programs as described above and finds that they meet the requirements of Item I.F.2.

I-16

Freocrick R. Allenspat June 1952

- Graduate - Polytechnic Institute of Brooklyn

(

- Degree in Bachelor of Mech nical Engineering July 1952 to August 1953

- New York Naval Shipyard August 1954 to August 1956

- Republic Aviation Corporation August 1954 to August 1956 riilitary Service September 1956 to June 1968

- Employed by the Brookhaven National Laboratory, Reactor Division. Approxinately two years as operating shift supervisor in charge of an operating shif t on the Brookhaven Graphite Research Reactor (BGRR).

Approximately three years as BGRR day shif t supervisor responsible for various reactor support activities.

Approximately six years as BGr9 Assistant Operations Group Leader primarily responsible for the temperature monitoring and reactor fuel nanagement programs.

One year as BGRR Operations Group Leader responsible for all operational aspects of the reactor.

Included during this period at Brookhaven National Laboratory were several short term supplemental assignments to Brookhaven National Laboratory review and audit committees assigned the responsibility to dete-mine if other Brookhaven nuclear reactors were being operated in accordance with the applicable rules and regulations.

June 1968 rocut i s s i o n, Di rec tora t e to, lune 1914

- Fmployed by the Atomic Energy of Licensing, Operational Safety Branch.

My responsibilities include (as assigned); review and evaluation of 'pplicants organizational structure, technical and administrative qualifications of applicants proposed reactor operating organization, including emergency plans and industrial security plans; development of guides and codification of

e

-2 present and proposed pr.otlie. uith re.pett to administrative procedures for the operation of licensed reactors; the review of operating reports from licensed reactors for safety related items; and the preparation of repo ts relative to operating experiences at licensed reactors.

June 1974 to May 1930 Employed by the AEC/NRC, Division of Project Managenent, Quality Assurance Branch. My responsibilities include review and evaluation of applicants organizational structure, technical and administrative qualifications of applicants oroposed reactor operating organization, development o acandards, codes and guides with respect to administrative procedures for the operation of licensed reactors; and the development of uniform acceptance criteria for subjects required to be addressed by license applicants relating to operational safety matters.

May 1980 to Present Employed by the NRC, Division of Human Factors Safety, Licensee Qualifications Branch.

My responsibilities include establishing requirements and qualification stano;rds for licensee management and plant personnel;

)

review and evaluate the technical and managerial quali-fications of applicants and licensees; and the development and review of administrative controls for the operation of licensed reactors.

I have attended the MIT course on Light llater Reactor Safety, attended the POP 0 course in Industrial Defense and Disaster Planning for Privately Operated Facilities sponsored by the Dept. of Army at the Military Police School in Fort Gordon, Georgia, and a Babcock and Wilcox Simulator training course.

O I

buAliclCATIONSANDEXPERIENCEOf JGHN WILLIAM GILRAY Principal Quality Assurance Engineer (Nuclear)

Present Position

Title:

Participates as a senior member of the Office of Responsibilities:

Nuclear Reactor Regulation - Quality Assurance Branch staff whose function is primarily one of evaluating, from a safety standpoint, reactor construction and operating proposals with response to quality Serves assurance and/or technical specifications.

as Senior Nuclear Engineering Specialist for group evaluation of power reactor license applications.

6/63 - 6/72

Title:

Quality Control Engineer for the AEC Space Nuclear Propulsion Office.

As the SNP0-C on-site Quality Control Engineer in Responsibilities:

the prime contractor's plant, responsible for monitoring the contractor's quality control program and providing technical direction relative to the testing, inspection and adherence to aerospace-rated quality control procedures for the development of the nuclear rocket engir.e (NERVA).

Directs inspection personnel of the Air Force Plant Representative's office assigned to NERVA program relative to day-to-day inspections and quality surveys.

8/62 - 6/63 Ti tle:

Quality Control Engineer for Bourn's Inc. (Electronic Component Co.)

Responsible for the Quality Control and Reliability Responsibilities:

policies and activities in the manufacturing and inspection of potentiometers and relays used in the Aerospace industry.

Evaluates the design and in-l l

spection processes for adequate quality and reliability requirements.

1/59 - 8/62

Title:

Juality Control Engineer at Alco Products, Inc.

(Fabricator of Nuclear Components)

Responsible for establishing and assuring proper Responsibilities:

implementation of Quality Control and Quality Assurance requirements for nuclear components from th design purchasing and manufacturing phases thru the shipment of the components of the Navy Nuclear Shipyards.

L Schooling:

Graduate in BSME 1958 Courses:

Optical Tooling Engineering Radiography and Film Reading Societies:

Society of Non-Destructive Testing American Society of Quality Control PE:

Registered Professional Quality Engineer L