Final Deficiency Rept Re Welding of Main Steam Line Pipe Whip Restraint,Initially Reported 800926.Significant Weld Deviations Were Reworked.Reworked Restraints Will Be Released for Const Upon Repair Completion
ML20009E899
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/17/1981
From: Oprea G
HOUSTON LIGHTING & POWER CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, ST-HL-AE-702, NUDOCS 8107280530
Download: ML20009E899 (4)


Text

,f Dm6 Co. SS te')

so-417/449 O R I 610 A o pot 60A/L 46C6 To REE The Light

  • da:dp Company n<,usion ugi,ong & nm m m>x im nousi,n. rexa, moi oi3> 22s.

n July 17,1981 ST-HL-AE-702 SFN: V-0530

/gM i 6 f

/s

[ g[k1i

'h, Mr. Karl Seyfrit T

Jg o ? 1981" Director, Region IV

'd uw C"

i v

Nuclear Regulatory Commission

> u.s.'g$'isse

.j; Ar i ton Texa bl

'/

Dear Mr. Seyfrit:

South Texas Project l' nits 1 & 2 Docket Nos. STN 50-498, STN 50-499 Final Report Concerning Welding of the Main Steam Line Pipe Whip Restraint On September 26, 1980, pursuant to 10CFR50.55(e), Houston Lighting & Power Company notified your office of an item concerning welding of the main steam line pipe whip restraints. Our final report is attached.

If there are any rtuestions, please contact Mr. Michael E. Powell at (713) 676-8592.

Ver f uly ours, eh FeV Exe tive-e President RRH/fij Attachment s,//

8107280530 810717 PDR ADOCK 05000498 5

PDR

j n

N llouston Lighting & Power Company cc:

J. H. Goldberg July 17,1981 D. G. Barker ST-HL-AE 702 C. G. Robertson SFN: V-0530 Howard Pyle Page 2 R. L. Waldrop H. R. Dean D. R. Beeth J. D. Parsons J. W. Williams J. W. Briskin J. E. Geiger STP RMS H. S. Phillips (NRC)

J. O. Read (Read-Poland, Inc.)

M. D knwarz (Baker & Botts)

R. Go.* con Gooch (Baker & Botts)

J. R. Newman (Lowenstein, Newman, Reis, 8 Axelrad)

Director, Office of Inspection & Enforcement Nuclear Regulatory Commission Washington, D. C. 20555 M. L. Borchelt/R. L. Range Charles Bechhoef ar, Esquire Central Power & Light Company Chairman, Atomic Safety & Licensing Board P. O. Box 2121 U. S. Nuclear Regulatory Commission Corpus Christi, Texas 78403 Washington, D. C.

20555 R. L. Hancock/ T. H. Muehlenbeck Dr. James C. Lamb. III City of Austin 313 Woodhaven Road P. O. Bolx 1088 Chapel Hill, North Carolina 27514 Austin, Texas 78767 J. B. Poston/A. vonRosenberg Mr. Ernest E. Hill t

City Public Service Board Lawrence Livermore Laboratory P. O. Box 1771 University of California San Antonio, Texas 78296 P. O. Box 808, L-123 j

Livermore, California 94550 Brian E. Berwick, Esquire William S. Jordan, III Assistant Attorney for the State of Texas Harmon & Weiss

]

P. O. Box 12548 1725 I Street, N. W.

p Capitol Station Suite 506 l

Austin, Texas 78711 Washington, D. C.

20006 h

Lanny Sinkin Citizens for Eouitable Utilities, Inc.

Citizens Concerned About Nuclear Power c/o Ms. Peggy Buchorn 5106 Casa Oro Route 1, Box 1684 San Antonio, Texas 78233 Brazoria, Texas 77422 l

Jay Gutierrez, Esquire Hearing Attorney Office of the Executive Legal Director U. S. Nuclear Regulatory Comnission t

Washington, D. C.

20555 Revision Date 7-2-81 i

s (1)

FINAL REPORT CONCERNING WELDING OF THE MAIN STEAM LINE PIPE WHIP RESTRAINT I.

Summary:

05' September 26, 1980, Houston Lighting & Power Company notified your office concerning welds not meeting the requirements of American Welding Society D1.1-1977 code for the South Texas Project main steam line pipe whip restraints. A re-inspection program has been completed which examined all fabricated pipe whip restraints. The results of the re-inspection program have been documented and evaluated by Engineering. The re-inspection progran did identify welds requiring rework; however, in no case was a weld deviation found to cause either an overstress condition or failure of the individual restraint.

II. Description of The Incident:

On September 26, 1980, Houston Lighting & Power 'ompany identified to your office an item concerning welds ;

meeting the requirements of the American Welding Society ( AWS D1.1-1977) Code in the main steam line pipe whip restraints. The first indications of the nonconforming condition were first identified by Brown & noot Vendor Surveillance personnel at a painting subcontractor facility. This resulted in B8R Quality Control Inspectors at the South Texas Project site lay down yard identifying nonconforming welds subsequent to receipt o' the restraints from the fabricator. Upon identification of this nonconforming condition a " hold" was placed on all pipe whip restraints until individually approved for further processing through the re-inspection program.

III. Corrective Action:

In order to accurately assess the condition of the subject pipe whip restraints, a 100% visual re-inspection of all welds within the fabricated units was conducted. The re-inspection of the fabricated pipe whip restrainta was conducted by qualified BAR Quality Control and Vendor Surveillance Inspectors under the direction of Quality Engineers. This re-inspection program included restraints received at the South Texas Project, those located at an offsite painting shop, and those awaiting shipment from the fabricator. The objective of the re-inspection was to confirm compliance with AWS D1.1-1977 code reouirements. Welds identified as not meeting the code reqrirements were documented on nonconformance repori.s showino the location, nature, size and shape of the deviation. However, pipe whip restraints located at the fabricator's shop have been inspected by a B&R Vendor Surveillance Inspector before acceptance and release from the fabricator's facilit,, in order to ensure confortnance to project requirements.

.,s (2)

A total of thirteen nonconformance reports have been written on twenty-one restraints located at the offsite paint shop, and twenty-seven nonconformance reports have also been written on fifty-one restraints located on site.

In general the weld deviations identified in the nonconformance reports were found to be of asmall size and not considered by HL&P and BAR Engineering to be of a structurally significant nature.

In order to evaluate i

the effect of a weld deviation on the adequacy of an individual restraint, Engineering has distinguished between cosmetic deviations and those which would require a structural evaluation.

Those characteristics determined by Engineering to be of a non-cosmetic nature include:

1) base metal defects
2) base metal surface lamination
3) base metal cracks
4) weld cracks
5) craters
6) unders e welds 7) insufficient throat
8) excessive concavity l

B&R Engineering has completed its review and the dispositioning of all nonconformance reports resulting from the re-inspection program at this time. Weld deviations identified as significant have been dispositioned by Engineering as requiring

" Rework as Noted" and those deviations considered to be structurally insignificant have been dispositioned "Use as Is".

i l

Additionally, in all instances in which Engineering required l

" Rework as Noted", the rework was to correct the individual deviation and not the entire weld. Restraints having no deviations as well as those dispositioned "Use as Is" will be released in accordance with project procedures. Those restraints requiring " Rework as Noted" will be released for construction upon completion of the repair.

IV. Safety Evaluations:

An engineering evaluation has been performed on the j

nonconforming weld deviations identified in the re-inspection p

program for the South Texas Project pipe whip restraints.

In no P.

case was a deviation identified (including those for rework) which would prevent the individual pipe whip restraint from performing as intended, cause an overstress condition, or cause a safety hazard if lef t uncorrected. Therefore the initial item of concern f

would not represent a significant safety hazard, if left uncorrected.