PNO-IV-80-34G:on 810629,licensee Provided Program for Verifying Tendon Sheathing Location within Radial Tolerance in Dome Concrete,In Response to NRC 810416 Request. Placements CS1-R1,R2 & N-3 of Reactor Containment Approved
ML20009E892
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/21/1981
From: Crossman W, Hubacek W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
References
PNO-IV-80-034G, PNO-IV-80-34G, NUDOCS 8107280525
Download: ML20009E892 (1)


Text

PRELIMINARY NOTIFICATION 7

July 21, 1981 PRE'IMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE -- PN0-IV-80-34G This preliminary notification constitutes EARLY notice of events of POSSIBL'E S

\\ p\\ L b ' d <

safety or public interest significance. The information presented is as initially received without verification or evaluation and is basically rjZ LU k

b ~q1931,. }_

that is known by IE staff on this date.

,1 tu.

o

'.u#IM g #

FACILITY: Houston Lighting & Power Company J3 South Texas Project, Units 1 & 2

~

?

(Dockets: 50-498;50-499)

UPDATE-EXPANSION OF PREVIOUSLY AUTHORIZED

SUBJECT:

By letter dated July 8,1981, Houston Lighting and Power Company (HL&P) has requested expansion of limited placement of complex concrete.

The request is specific to performing three complex concrete dome placements delineated in an attachment to their April 2,1981 letter but were not allowed in our April 16, 1981 IAL to HL&P because the licensee had not adequately defined his method of verifying tendon sher ~ Sing 1ocation.

Subsequently, in a meeting of June 29, 1981, and a letter dated July 8, 1981, the licensee provided his program for verifying the location of tendon sheathing within the specified radial tolerance in the dome concrete.

Based on evaluation by RIV of the licensee's program, Placements CSI-R1, R2 and R3 of the No. 1 Reactor Containment Building Dome are being allowed.

No press release was made by NRC or the licensee.

a M

Site construction progress is currently reported as 60% for Unit 1, and 23% for

'8 Unit 2.

E E

Contact:

W. A. Crossman, 728-8151; W. G. Hubacek, 728-8152 h

Distribution:

Transmitted H St.

cr Chairman Hendrie Comissioner Ahearne S. J. Chilk, SECY Commissioner Gilinsky Commissioner Bradford C. C. Kamerer, CA S

ACRS (For Distribution) o E

Transmitted: MNBB P. Bldg.

IE:TAS (IE:HQ Dist.)

W. J. Dircks, ED0 H. R. Denton,iiRR

~~

u C. Michelson, AE0D R. H. Vollmer, NRR Willste Bldg.

-R J. J. Fouchard, PA T. E. Murley, NRP, J. G. Davis, NMSS E

N. M. Haller, MPA R. J. Mattson, NRR R. B. Minogue, RES k

H. K. Shaper, ELD D. Eisenhut, NRR S. H. Hanauer, NRR J. J. Cummings, 0IA Mail NSAC (415) 856-6621 TETAS Air Rights (AR)

Document Mgt. Br.

For PDR/LPD G. W. Kerr, SP Steven Ebbin, NSOC IrtP0 (404) 952-6728 (oOl Regional Offices I II III V

/

I/O PRELIMINARY NOTIFICATION 8107280525 810721 PDR 18cE PNO-IV-BO-0346 PDR